Today we worked on rover calibration and software tuning in the morning in preparation for a system test in the afternoon. We prepped K10 Black for operations, mounted the GPR instrument, inflated the tires, and calibrated steering.
« Keith Cowing: Surreal Landscapes and Late Evening Thoughts | Main | Leroy Chiao: Rover testing »
TrackBack URL for this entry:
http://blogs.aterra.com/mvt/mt-tb.cgi/111