SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Tuesday, February 9, 2010    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

SpaceRef - Calendar of Events - Add Your Event

Ground Test of the Ares I Five-Segment Solid Rocket Motor

NASA and ATK Set New Date for Full-Scale Ares I Motor Test

WASHINGTON -- NASA and Alliant Techsystems Inc., or ATK, will conduct the first full-scale, full-duration test of the new first-stage solid rocket motor for the Ares I rocket at 1 p.m. MDT, on Thursday, Aug. 27. The test will take place at the ATK test facility in Promontory, Utah.

The test was previously scheduled for Aug. 25. The new date allows key NASA and ATK personnel to support this test and the upcoming STS-128 space shuttle Discovery mission. Discovery is targeted for launch on Aug. 24.

The static firing of the five-segment solid motor, designated Development Motor -1, will last two minutes. The goal is to obtain valuable thrust, roll-control, acoustics and vibration data as engineers continue to design Ares I.

To attend the test, journalists must register with ATK. For information and to request credentials, contact ATK's Trina Patterson at 801-699-0943. The registration deadline for U.S. reporters is Aug. 24. The deadline for foreign journalists is Aug. 18.

Interviews with project managers may be arranged in advance. News media bringing live broadcast trucks must request parking prior to the event.

The first-stage solid rocket motor is managed and tested by the Ares Projects Office at NASA's Marshall Space Flight Center in Huntsville, Ala. ATK Space Systems is the prime contractor for the Ares I first stage. The Ares I rocket is designed to launch the Orion spacecraft and the next generation of NASA astronauts.

For more information about Ares, visit: http://www.nasa.gov/ares


PROMONTORY, Utah, August 7, 2009 - Alliant Techsystems (NYSE: ATK) Space Systems and NASA will make history on August 25 as the new Ares I five-segment first stage is tested, marking the start of a new era of space exploration.

What: Horizontal ground test firing of Ares I first stage

When: Tuesday, August 25, 2009

Time: 1 p.m. MDT

Where: ATK Space Systems facility in Promontory, Utah

Test Objectives/Background:

  • A total of 46 design objectives will be measured through 650 instrument channels
  • The Ares I design is based on the design of the space shuttle's four-segment booster
  • The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
  • The first stage of Ares I has been under development since 2005, it measures 12 feet in diameter and 154 feet in length.
  • The cases have previously flown on the space shuttle, collectively launching 48 missions--including STS-1.

Note to Editor:

  • Media passes are required in order to view the test
  • Foreign requests must be submitted by 4 p.m., August 13, 2009
  • All other media requests must be submitted by 4 p.m., August 20, 2009
  • Reporters will need to be on site by 9 a.m. the day of the test
  • The media will be located in a viewing site optimal for photos and video. Reporters will be escorted to conduct interviews and view the motor up close prior to the test
  • Upon request, reporters may view the motor after the firing
  • Broadcast: Live equipment needs to be scheduled in advance to arrange for parking

For more information and to request a media pass, contact Trina Patterson (801) 699-0943 trina.patterson@atk.com

Date: Thursday, August 27, 2009

Location: ATK Space Systems facility, Promontory, UT, US

 Calendar of Events RSS Feed

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games.

Find a number of writing desks for sale

the best online casino bonus guide on the internet featuring higher payouts than any land based casino.

RADWIN empowers cellular carriers with a Wireless backhaul solution that meet their needs.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.

Decorate your home with nautical decor

Dieses Portal stellt Ihnen die besten Deutsche online Casinos und Pokerräume im Internet vor.

Try blackout bingo at an online bingo hall.

220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

TV Stands


Copyright © 1999-2010 SpaceRef Interactive Inc. All rights reserved. Privacy Policy