|
|
|
Mission ISS-3A
Mission Description:
Cargo Manifest. Note: [numbers] = ISS SE (Subelement) numbers.
Ascent Cargo
- ITS-Z1 [235] with CMGs
- Ku-Band [239] S-Band Equipment [240],
- Spacelab Pallet-1 [145],
- PMA3 [462], 2 ETSDs [195, 196],
- Sidewall Carrier-DDCU A and B [920, 920A],
- Z1 DDCUs [260, 260A],
- TSA ISS Content [950C], SILL ISS Content [975B],
- Middeck ISS Content [800A],
- Shuttle Integration H/W [850A]
|
Descent Cargo
- Spacelab Pallet-1 [145],
- Sidewall Carrier-DDCU A and B [920, 920A],
- TSA ISS Content [950C], SILL ISS Content [975B]
- Middeck ISS Content [800A],
- Shuttle Integration H/W [850A]
|
EVA Activities
EVA Reference 3A/STS-92 [Acrobat 6.4 MB]
This document contains detailed drawings of the EVA tools, external ISS structures, and other items associated with ISS assembly EVA activity required for ISS mission 3A.
|
EVA TASKS TO BE PERFORMED
|
CREW TO PERFORM EVA |
AIRLOCK USED |
SPACESUIT USED |
ASSEMBLY or MAINTENANCE |
Flight 3A - EVA 1
SASA (S-Band) umbilical connections.
Deadface Z1-Node 1 umbilicals - String #1.
SASA (S-Band #1) relocate to Z1 nadir pointing temp stow location.
SASA bracket removal.
Z1-Node 1 Umbilicals - String 2.
SGANT (Ku) dish install.
SGANT (Ku) umbilical attach
SGANT (Ku) boom deploy
Port ETSD Install.
Remove SPDA thermal shroud.
Install Node 1 handrails.
Clear SVS target ndot E1a.
|
STS |
Shuttle |
EMU |
Assembly |
Flight 3A - EVA 2
PMA3 release from SLP.
RTAS Launch Lock release.
Transfer CIDs #1-6 from TSA to Z1.
PMA3 berth to Node 1 nadir.
Connect PMA3- Node1 primary cables.
Connect PMA3- Node1 redundant cables.
|
STS |
Shuttle |
EMU |
Assembly |
Flight 3A - EVA 3
Remove Z1 shrouds.
DDCU-HP 4B Install
DDCU-HP 3B Install
Connect final Z1 umbilicals.
Starboard ETSD install.
Connect final PMA3 umbilicals.
Relocate Z1 FRGF.
|
STS |
Shuttle |
EMU |
Assembly |
Flight 3A - EVA 4
Open RTAS latch.
Relocate Z1 keel.
Relocate OHTS Bag tools
Deploy Z1 utility tray and restrain bowtie.
Prep Z1 tray fluid lines for Flt. 5A. (Release Bolts)
Cycle MBM for PMA2.
Remove RTAS launch locks.
|
STS |
Shuttle |
EMU |
Assembly |
Operations Documents
International Space Station - ISS/Shuttle Joint Operations Book, ISS-3A, Mission Operations Directorate, Operations Division, Final, Revision A, 20 September 2000 [Acrobat 812K]
This document contains the procedures the STS-92/ISS-3A crew will use as they approach, dock, undock, and depart the ISS - as well as procedures involved with delivery of cargo and other ISS components.
International Space Station -
Assembly Operations Book
ISS-3A, JSC-48502-3A, Mission Operations Directorate
Operations Division,
Final, 21 September 2000 [Acrobat 1.5 MB]
This document deals with Z1 Truss installation and activation.
International Space Station
Malfunction Checklist
ISS-3A, JSC-48501-3A,
Mission Operations Directorate,
Operations Division,
Basic, Revision A, 20 September 2000 [Acrobat 10.6 MB]
This document contains procedures, flowcharts, photographs, and schematics that depict a wide range of procedures to follow should hardware malfunction during mission ISS-3A.
International Space Station
Ground Handbook,
Specific,
ISS-3A, JSC-48516-3A,
Mission Operations Directorate,
Operations Division,
Final, 13 June 2000 [Acrobat 444K]
This document contains procedures to be followed by Mission Control personnel in Houston and Moscow.
International Space Station -
Operations Checklist,
ISS-3A, JSC-48500-3A
Mission Operations Directorate,
Operations Division,
Final, 19 September 2000 [Acrobat 4.1 MB]
This document covers all aspects of docked operations between the Space Shuttle and the ISS during the ISS-3A mission.
|