SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, January 29, 2022    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt -
Space Station User's Guide
STS-107 Information
Space Station Location
ISS Location NOW/NASA MSFC
Real Time ISS Tracker - More Links

User's Guide Sections
  • Acronyms
  • Assembly/Resupply Missions [Old]
  • Contingencies and Emergencies
  • EVA Operations
  • Shaded Images: ISS-3A to ISS-3S
  • Element Drawings
  • Logistics Vehicle Capabilities
  • Medical Operations
  • Operations
  • ISS Computer Systems
  • Tracking
  • ISS Overview
  • Science and Utilization
  • Schedules and Plans
  • Imagery
  • Weather
  •  
    Current Status News ISS Missions Station Sightings
    ISS Status | On-orbit Status
    ISS Science
    Shuttle Mission | Processing
    News Archive
    SpaceRef News
    Next Mission (STS-107)
    ISS Missions 1998-2006

    Mission HST-3B Servicing Mission

     

    STS-109 Extravehicular Activity

  • Spacewalk Number One, Flight Day Four: Replace -V2 Solar Array and Diode Box Assembly, Install Diode Box Controller Cross Strap Harness

  • Spacewalk Number Two, Flight Day Five: Replace +V2 Solar Array and Diode Box Assembly and Reaction Wheel Assembly-1

  • Spacewalk Number Three, Flight Day Six: Replace Power Control Unit (PCU)

  • Spacewalk Number Four, Flight Day Seven: Replace Faint Object Camera with the Advanced Camera for Surveys, Install Electronics Support Module and Perform Power Control Unit Cleanup Tasks

  • Spacewalk Number Five, Flight Day Eight: Install the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) Cryogenic Cooler and NICMOS Cooling System Radiator

  • EVA Timeline


  • Mission Description:

    The Third Planned HST servicing mission, (part B) will see a new science instrument: the Advanced Camera for Surveys (ACS) installed in the HST. In addition, Four large flexible solar array (SA) panels (wings) will be installed replacing the older panels so as to provide power to the observatory. Several other activities such as NICMOS Cryocooler (NCC) Installation and Power Control Unit (PCU) replacement, are planned over 5 Extra Vehicular Activity (EVA) days.


    STS-109 News

    Copyright © 2022 SpaceRef Interactive LLC. All rights reserved. Privacy Policy