| DATE
| STEP
| GIF
| STAGE or FLIGHT
|
| 10/28/00
| 1
|
Image
| ISS Stage 3A after separation of STS-92 Orbiter.
|
| 10/29/00
| 2
|
Image
| ISS after separation of 1P Progress from Zvezda Service Module aft.
|
| 11/02/00
| 3
|
Image
| ISS with docked Soyuz (1S) Transport, Modified (TM), on Zvezda Service Module aft. First ISS crew.
|
| 11/18/00
| 4
|
Image
| ISS with docked 2P Progress M1 on Zarya FGB nadir.
|
| 12/01/00
| 5
|
Image
| ISS after separation of 2P Progress vehicle following Zarya FGB and Zvezda Service Module dry cargo outfitting; waste loading; propellant use or transfer.
|
| 12/02/00
| 6
|
Image
| ISS with STS-97 Orbiter after rendezvous [fully loaded].
|
| 12/02/00
| 7
|
Image
| ISS with STS-97 Orbiter with ITS Port 6 (P6) held in the parking position. Solar arrays and radiators remain stowed in launch position.
|
| 12/03/00
| 8
|
Image
| ISS with STS-97 Orbiter after ITS P6 attached to Z1 truss zenith. Solar arrays and radiators remain stowed in launch position.
|
| 12/08/00
| 9
|
Image
| ISS with STS-97 Orbiter before separation. P6 keel pin rotated; P6 solar arrays and forward radiator deployed. S-band antenna relocated from Z1 to P6 zenith. P6 aft radiator deployed, EVA Bag deployed on P6; Plasma Probe deployed to P6 aft zenith surface.
|
| 12/09/00
| 10
|
Image
| ISS stage 4A after separation of STS-97 Orbiter.
|
| 01/20/01
| 11
|
Image
| ISS with STS-98 Orbiter after rendezvous [fully loaded].
|
| 01/21/01
| 12
|
Image
| ISS with STS-98 Orbiter after PMA 2 moved to Z1 forward [rotated 102 degrees].
|
| 01/21/01
| 13
|
Image
| ISS with STS-98 Orbiter after Destiny Lab to Unity Node 1 forward CBM. P6 starboard radiator deployed. Ku-band Antenna gimbal locks removed. Lab Power and Data Grapple Fixture (PDGF) and window shutter gearbox installed.
|
| 01/25/01
| 14
|
Image
| ISS with STS-98 Orbiter [fully unloaded] before separation. PMA 2 moved from Z1 forward to Destiny Lab forward CBM, S-band spare on Z1.
|
| 01/27/01
| 15
|
Image
| ISS Stage 5A after separation of STS-98 Orbiter.
|
| 01/29/01
| 16
|
Image
| ISS after movement of 1S (2R) Soyuz vehicle. 1S Soyuz undocks from Zvezda Service Module aft and then redocks to Zarya FGB nadir.
|
| 02/12/01
| 17
|
Image
| ISS with docked 3P Progress M on Service Module aft.
|
| 02/17/01
| 18
|
Image
| ISS with STS-102 Orbiter after rendezvous [fully loaded].
|
| 02/20/01
| 19
|
Image
| ISS with STS-102 Orbiter after portside Early Communications (ECOMM) Antenna removed and stowed inside Unity Node 1. Lab Cradle Assembly (LCA) and PDGF Rigid Umbilical installed. PMA 3 moved to Unity port CBM. Leonardo Multi-Purpose Logistics Module (MPLM) berthed to Unity nadir.
|
| 02/21/01
| 20
|
Image
| ISS with STS-102 Orbiter after Early Ammonia Servicer (EAS) installed on P6. External Stowage Platform (ESP) and one Pump and Flow Control Subassembly (PFCS) installed on Destiny Lab forward. Before unloaded Leonardo off Unity Node 1 nadir.
|
| 02/23/01
| 21
|
Image
| ISS with STS-102 Orbiter before separation with MPLM returned, EVAs complete. * An assumption is made that the Service Module port solar array will be manually deployed.
|
| 02/24/01
| 22
|
Image
| ISS stage 5A.1 after separation of STS-102 Orbiter.
|
| 04/11/01
| 23
|
Image
| ISS after separation of 3P Progress from Zvezda Service Module aft. Following unloading of propellant and dry cargo, loading waste.
|
| 04/14/01
| 24
|
Image
| ISS with docked 4P Progress M1 on Zvezda Service Module aft.
|
| 04/21/01
| 25
|
Image
| ISS with STS-100 Orbiter after rendezvous [fully loaded].
|
| 04/23/01
| 26
|
Image
| ISS with STS-100 Orbiter after Launch Deploy Assembly (LDA) mechanism secures Spacelab Pallet (SLP) to LCA.
|
| 04/23/01
| 27
|
Image
| ISS with STS-100 Orbiter with Ultra High Frequency (UHF) Antenna deployed and Space Station Remote Manipulator System (SSRMS) attached to the SLP and to Destiny Lab. Fully loaded Raffaello MPLM installed on Unity Node 1 nadir.
|
| 04/24/01
| 28
|
Image
| ISS with STS-100 Orbiter before SLP off Destiny Lab. Starboard ECOMM antenna removed and stowed in Unity. DC Switching Unit (DCSU) Installed on ESP.
|
| 04/25/01
| 29
|
Image
| ISS with STS-100 with SLP returned to payload bay by the SSRMS. Before the unloaded Raffaello MPLM removed from Unity Node 1 nadir.
|
| 04/28/01
| 30
|
Image
| ISS with STS-100 Orbiter before separation with MPLM returned. EVAs completed.
|
| 04/30/01
| 31
|
Image
| ISS stage 6A after separation of STS-100 Orbiter.
|
| 05/01/01
| 32
|
Image
| ISS after Progress undocks from Service Module_aft and is in a hover position while the Soyuz exchange occurs.
|
| 05/02/01
| 33
|
Image
| ISS with docked 2S Soyuz TM to Zvezda Service Module aft.
|
| 05/08/01
| 34
|
Image
| ISS after separation of 1S (2R) Soyuz vehicle from Zarya FGB nadir.
|
| 05/09/01
| 35
|
Image
| ISS after 2S moved from Service Module aft to Zarya FGB Nadir.
|
| 05/12/01
| 36
|
Image
| ISS after 4P redocked to Service Module aft.
|
| 05/19/01
| 37
|
Image
| ISS with STS-104 Orbiter after rendezvous [fully loaded].
|
| 05/20/01
| 38
|
Image
| ISS with STS-104 Orbiter after Airlock module berthed to Node 1 starboard CBM.
|
| 05/23/01
| 39
|
Image
| ISS with STS-104 Orbiter after installation of two High Pressure Gas Assembly (HPGA) units on the Airlock.
|
| 05/25/01
| 40
|
Image
| ISS with STS-104 Orbiter before separation [fully unloaded]. All four HPGAs installed.
|
| 05/27/01
| 41
|
Image
| ISS stage 7A_After Separation of STS-104 Orbiter.
|
| 06/03/01
| 42
|
Image
| ISS with docked Docking Compartment (DC) 1 to Zvezda Service Module nadir. Second Strela Cargo Boom launched inside DC 1. Universal Instrument Section (UIS) attached to DC 1 nadir.
|
| 06/23/01
| 43
|
Image
| ISS with STS-105 Orbiter after rendezvous [fully loaded]. Prior to 7A1_AR an EVA occurs in which the UIS detaches from DC 1, and the Russian Biological Production Module (BPM) Ladder and Strela 2 are installed on DC 1 exterior.
|
| 06/23/01
| 44
|
Image
| ISS with STS-105 Orbiter after fully loaded Donatello MPLM berthed to Unity Node 1.
|
| 06/25/01
| 45
|
Image
| ISS with STS-105 Orbiter after Orbital Replacement Unit (ORU) Transfer Device (OTD) installed; Donatello MPLM unloaded, but still on Unity Node 1 nadir. S0 cables installed on Lab. * An assumption is made that the Russian Micrometeroid/Orbital Debris (MMOD) shields and Portable Worksite (PW) are transferred to DC 1.
|
| 06/28/01
| 46
|
Image
| ISS with STS-105 Orbiter before separation and with MPLM returned. EVAs completed.
|
| 06/30/01
| 47
|
Image
| ISS Stage 7A.1 after separation of STS-105 Orbiter.
|
| 07/03/01
| 48
|
Image
| ISS after separation of 4P Progress M1 from Zvezda Service Module aft, following unloading of propellant and dry cargo, loading of waste.
|
| 07/06/01
| 49
|
Image
| ISS with docked 5P Progress M on Zvezda Service Module aft.
|
| 09/05/01
| 50
|
Image
| ISS after separation of 5P Progress M from Zvezda Service Module aft. After unloading of propellant and dry cargo; loading waste.
|
| 09/08/01
| 51
|
Image
| ISS with docked 6P Progress M1 on Zvezda Service Module aft.
|
| 10/06/01
| 52
|
Image
| ISS with STS-108 Orbiter after rendezvous [fully loaded].
|
| 10/08/01
| 53
|
Image
| ISS with STS-108 Orbiter after fully loaded MPLM berthed to Unity Node 1.
|
| 10/10/01
| 54
|
Image
| ISS with STS-108 Orbiter after MPLM unloaded, but still on Unity Node 1 nadir.
|
| 10/11/01
| 55
|
Image
| ISS with STS-108 Orbiter before separation with MPLM returned.
|
| 10/13/01
| 56
|
Image
| ISS Stage UF1 after separation of STS-108 Orbiter.
|
| 10/23/01
| 57
|
Image
| ISS with docked 3S Soyuz TM to DC 1 nadir.
|
| 10/30/01
| 58
|
Image
| ISS after separation of 2S Soyuz vehicle from Zarya FGB nadir.
|
| 11/16/01
| 59
|
Image
| ISS after separation of 6P Progress M1 from Zvezda Service Module aft. After unloading of propellant and dry cargo; loading of waste.
|
| 11/19/01
| 60
|
Image
| ISS with docked 7P Progress M1 on Zvezda Service Module aft.
|
| 01/19/02
| 61
|
Image
| ISS with STS-110 Orbiter after rendezvous [fully loaded].
|
| 01/22/02
| 62
|
Image
| ISS with STS-110 Orbiter after ITS S0 installed on LCA. Mobile Transporter (MT) with S0.
|
| 01/24/02
| 63
|
Image
| ISS with STS-110 Orbiter before separation. After S0-to-Lab struts installed, Lab cable tray installed, and Airlock spur and Extravehicular-Charged Particle Detection System (EV-CPDS) deployed. Plasma probe removed.
|
| 01/26/02
| 64
|
Image
| ISS Stage 8A after separation of STS-110 Orbiter.
|
| 02/01/02
| 65
|
Image
| ISS after separation of 7P Progress M1 from Zvezda Service Module aft. After unloading of propellant and dry cargo; loading waste.
|
| 02/04/02
| 66
|
Image
| ISS with docked 8P Progress M1 on Zvezda Service Module aft.
|
| 02/23/02
| 67
|
Image
| ISS with STS-111 Orbiter after rendezvous [fully loaded].
|
| 02/25/02
| 68
|
Image
| ISS with STS-111 Orbiter after grapple fixture on FGB, Mobile Remote Servicer (MRS) Base System (MBS) berthed to MT, and fully loaded MPLM berthed to Unity Node 1.
|
| 02/27/02
| 69
|
Image
| ISS with STS-111 Orbiter after MPLM unloaded, before return to payload bay. Zenith Multiplexer/De-Multiplexer (MDM) radiator installed on PMA 1.
|
| 02/28/02
| 70
|
Image
| ISS with STS-111 Orbiter before separation and with MPLM returned. EVAs completed.
|
| 03/01/02
| 71
|
Image
| ISS stage UF2 after separation of STS-111 Orbiter.
|
| 03/26/02
| 72
|
Image
| ISS after separation of 8P Progress M1 from Zvezda Service Module aft. After unloading of propellant and dry cargo; loading of waste.
|
| 03/29/02
| 73
|
Image
| ISS with docked 9P Progress M1 on Zvezda Service Module aft.
|
| 04/12/02
| 74
|
Image
| ISS with docked 4S Soyuz TM to FGB nadir.
|
| 04/18/02
| 75
|
Image
| ISS after separation of 3S Soyuz vehicle from DC 1 nadir.
|