SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

Shuttle tank sensors an issue again in launch processing

 
Craig Covault
Tuesday, March 7, 2006


image

Editor's note: the following story was posted on the Aviation Week and Space Technology website on 5 March 2006 - and was printed in the 6 March 2006 edition of the magazine. It is reprinted here with permission of the publisher.

World News & Analysis
Shuttle Tank Sensors an Issue Again in Launch Processing
Aviation Week & Space Technology
03/06/2006, page 33

Craig Covault
Kennedy Space Center

Shuttle tank sensors an issue again in launch processing (Printed headline: ECOs of the Past)

The modified external tank for the next shuttle mission is starting a processing flow with no schedule margin, while engineers here assess issues that could affect NASA's May launch target for Discovery, such as those with engine cutoff (ECO) sensors.

The external tank (ET) arrived at Kennedy Mar. 1, a week earlier than envisioned. This followed a Herculean effort to complete the tank by the Michoud, La., Lockheed Martin/NASA workforce, most of whom continue to suffer personal hardship from Hurricane Katrina.

Barged from Michoud, the ET is beginning processing flow that already has no margin to make a tentative May 10-22 launch target. Any significant problems would force launch no earlier than July. Normally, tanks arrive with 25-30 days of processing margin.

One concern is a potential problem with one of four hydrogen propellant engine cutoff sensors in the new tank, says Mike Leinbach, Kennedy shuttle launch director. The same system in two different tanks delayed Discovery's initial return to flight last summer.

The wayward sensor is showing off nominal current readings. If the unusual readings prove to have a predictable value that can be accounted for during countdowns, the sensor would be viable for use. But if several tests show divergent readings, that could mean a time-consuming sensor changeout, Leinbach said. All four of the tank's hydrogen ECO sensors must remain valid in the final phases of a launch countdown.

Wind tunnel data from tests on tank components just getting underway are also necessary to clear the tank for flight (AW&ST Feb. 27, p. 39).

The modified external tank for the next shuttle mission arrives at Kennedy from hurricane-ravaged Michoud, La. Wind tunnel tests continue on the tank modifications.Credit: NASA

THIS FOLLOWS removal of the tank's protuberance air load (PAL) ramp foam, designed originally to deflect turbulent airflow away from small gaseous hydrogen and oxygen lines and a cable tray.

Although not yet a concern, engineers here will also investigate reports from the barge crew delivering the tank who thought they might have heard something rattling around inside the 154-ft. structure as the ship pitched through choppy seas en route to Kennedy. Wayne Hale, shuttle program manager, praised their vigilance, but also noted ships at sea make all sorts of noises.

A more significant issue is propulsion system concerns over a piece of tiny debris, about 0.8 mg. in weight, lodged in a debris screen upstream of Discovery's engines. Technicians have been unable to retrieve the piece, raising questions about its composition and whether it could be a flammability hazard if it broke free in the oxygen environment.

NASA White Sands Test Facility, N.M., one of the world's finest oxygen hazard research sites, has been running tests on the types of materials that could be involved, Hale said.

Those tests initially indicate that even if the piece is flammable, its mass is so tiny, it likely could only cause an inconsequential spark, even if it were to ignite within cryogenic oxygen flow, says Tim Wilson of the NASA Engineering and Safety Center.

Hale noted that although main-engine oxygen fires occurred on test stands in the past, the shuttle debris screens have caught and retained without incident many pieces of debris over the course of the program. Removing the debris has its own schedule and foreign-object damage implications, he said. Whether to leave it in place may turn out to be "a judgment call," he said. Hale also said if Discovery can launch on STS-121 by July even, there's a chance NASA could fly a total of three shuttle missions to the International Space Station this year.

Copyright 2006 Aviation Week and Space Technology. Reprinted with Permission.

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy