SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Tuesday, February 9, 2010    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

First Stage Design Problems Arise For NASA's Ares 1 Rocket

 
Keith Cowing
Friday, November 16, 2007 - Comments Comments

image

NASA has run into some problems with the design of its new Ares 1 launch vehicle - problems that could affect its ability (as designed) to safely launch its human cargo into space.

The Ares 1 and the Orion capsule (also under development) are designed to replace the crew carrying function of the current Space Shuttle fleet which is due to be retired in 2010. The first flight of humans aboard an Ares 1 is planned for March 2015.

According to NASA sources, the Ares 1 first stage, as currently designed, would produce a frequency of 25 Hz at liftoff. The concern is that this oscillation could shake the Ares 1 upper stage and Orion capsule designed to carry human passengers, causing considerable damage and that it could also adversely affect the Guidance, Navigation, and Control avionics in the rocket's Instrumentation Unit.

When asked to comment on this development, NASA's Exploration System Mission Directorate (ESMD) Public Affairs Officer replied:

"The Ares Project Office identified Ares I thrust oscillation as a potential integrated stack challenge as a part of its system definition review which concluded in October. Thrust oscillation or resonant burning is a characteristic of all solid rocket motors. It is caused by vortex shedding inside the solid rocket motor, similar to the wake that follows a fast-moving boat. When the vortex shedding coincides with the acoustic modes of the motor combustion chamber, pressure oscillations generate longitudinal forces that may affect the loads experienced by the Ares I during the last phase of first-stage flight. NASA is assessing the analyses in more detail, looking for any potential impacts to the integrated stack and ways to mitigate those impacts. Results are due in spring 2008. It is a normal part of the development process to identify, mitigate and track challenges such as this."

NASA sources also report that the 6 month slip in the Ares 1 PDR (Preliminary Design Review) recently announced could impact the first launch of humans aboard an Ares 1 by as much as 14-16 months beyond the publicly announced first flight date of March 2015.

NASA ESMD's response: "NASA decided to move the Ares I first stage preliminary design review to summer 2008 to allow better alignment with current Ares Project and Constellation Program preliminary design review planning. Conducting the first stage preliminary design review in summer 2008 will not cause NASA to delay the target date for the first flight with humans."

In addition, NASA sources report that the option of having a non-recoverable first stage for Ares 1 is also still under active consideration within the Ares design team - this despite stern statements to the contrary by former ESMD head Scott Horowitz last year.

NASA's response: "NASA is not considering a non-recoverable first stage for Ares I. A recoverable system is the preferred approach, and the agency confirmed this baseline through a trade study as part of the recent systems definition review."

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Pratt & Whitney Rocketdyne's Space Shuttle Main Engines Power Delivery of Robotic Control Station and Module

- NASA Ames Hosts Wind Tunnel Tests to Improve Semi-Trucks' Fuel Efficiency

- Spotlighting ESA's year of technology innovations

- NASA Solicitation: Mars Mission Organics Detection Instrument

- NASA Award: Recovery Act: Active Electromechanical Suspension System for Planetary Rovers

- NASA Solicitation: Science Evaluation Asessments Studies Services and Support

- NASA Solicitation: Poly-Picosatellite Orbital Deployer NPP Mission Support

- NASA Award: Recovery Act: Radiation Resistant Reconfigurable Shape Memory Rubber Space Arrays

- NASA Award: Recovery Act: Odor Control in Spacecraft Waste Management

- NASA Award: Recovery Act: Automated Hybrid Microwave Heating for Lunar Surface Solidification

- NASA Recovery Act: Self-deploying Composite Habitats

- NASA Synopsis: Industry Conference Sponsorship

- Zero Gravity Corporation Brings Sky High Adventure To Sin City With Exclusive Weightless Flight, February 27

- Boeing Prepares Last Major Piece of Hardware for International Space Station

- NASA Expendable Launch Vehicle Status Report 5 Feb 2010

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

A New 3D Map of Interstellar Gas Within 300 Parsecs of the Sun

Aderholt Statement On The President's NASA Budget Proposal To Cut Constellation

Pratt & Whitney Rocketdyne's Space Shuttle Main Engines Power Delivery of Robotic Control Station and Module

NASA Joins Austin Marathon Expo, Inspires Students

NASA Talk: Could Electronic Systems Collapse Worldwide? (new date)

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.


Copyright © 1999-2010 SpaceRef Interactive Inc. All rights reserved. Privacy Policy