SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Friday, November 20, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
NASA Gravity Probe B gyroscopes ready for full-speed spin-up

 
PRESS RELEASE
Date Released: Monday, August 2, 2004
Source: Marshall Space Flight Center

image

Nearly three months in orbit, Gravity Probe B, a NASA experiment to test two predictions of Albert Einstein, continues to perform well. All four gyroscopes - the ultra-precise spheres that will be used to test Einstein's general theory of relativity - are ready for full-speed spin-up. Nearing the end of its in-orbit and calibration phase, Gravity Probe B is managed by the Marshall Center.

At just under three months in orbit, Gravity Probe B is nearing the end of the Initialization and Orbit Checkout (IOC) phase of the mission. The spacecraft remains in excellent health, and all subsystems are continuing to perform well. All four gyros are digitally suspended, with gyros #2 and #4 spinning at science mission speed-greater than 80Hz (4,800 rpm) -- and gyros #1 and #3 spinning at approximately 1.5 Hz (90 rpm), ready for full-speed spin-up. The updated drag-free thruster control software that was uploaded to the spacecraft three weeks ago to optimize performance of the Attitude and Translation Control system (ATC) is continuing to perform nominally. The spacecraft's roll rate is 0.52 rpm, and the science telescope is being re-locked onto the guide star, IM Pegasi, following the full-speed spin-up of gyro #2 yesterday.

Each full-speed spin-up takes most of a day. Helium gas is flowed over the gyro for 90 seconds, and tests are run to ensure that the helium usage rate for that gyro corresponds to previous measurements. If all measurements check out, the full-speed spin-up, in which helium gas is flowed over the rotors for 2-3 hours, commences. The GP-B operations team controls the spin-up process by sending commands from the Mission Operations Center (MOC) at Stanford to the spacecraft. Real-time telemetry provides immediate feedback on the progress of the spin-up so that various parameters can be adjusted as necessary.

The spacecraft is being controlled from the Gravity Probe B Mission Operations Center, located at Stanford University. The Stanford-NASA/MSFC-Lockheed Martin operations team is continuing to perform superbly.

NASA's Marshall Space Flight Center in Huntsville, Ala., manages the Gravity Probe B program for NASA's Office of Space Science. Stanford University in Stanford, Calif., developed and built the science experiment hardware and operates the science mission for NASA. Lockheed Martin of Palo Alto, Calif., developed and built the GP-B spacecraft.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy