SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
Milestones Set the Stage for NASA Shuttle Discovery's Return to Flight

 
PRESS RELEASE
Date Released: Wednesday, August 18, 2004
Source: Kennedy Space Center

image

The pace of preparations for Return to Flight is picking up, with several key milestones in recent weeks marking important progress in readying the Space Shuttle Discovery for its next mission.

Discovery is progressing after the completion of extensive wiring for Return to Flight, as well as the transition from its modification period to more regular processing at the Kennedy Space Center (KSC), Fla. Meanwhile, the first piece of Discovery's twin Solid Rocket Boosters was moved to a processing facility on site and workers are installing several important components.

Though Discovery appears unchanged from the outside, the orbiter is very different on the inside. The power-up on July 27 follows safety improvements and modifications to enhance vehicle monitoring during flight. Technicians have installed cabling for wing leading-edge sensors and to support a digital camera to document the External Tank as it separates from Discovery. Wiring also has been installed to support a boom extension for the Shuttle's robotic arm that will provide the ability to inspect nearly all the outside areas of the orbiter's Thermal Protection System in detail.

On August 9, the first segment of the Solid Rocket Boosters designated for Discovery's flight was moved to the Rotation Processing and Surge Facility at KSC. The aft skirt -- the bottom, skirt-shaped section of the boosters -- will have two other components installed: an aft motor segment and an External Tank attach ring. Next month, the structure will move to the Vehicle Assembly Building for stacking operations.

Engineers and technicians have applied many of the modifications laid out in NASA's Implementation Plan for Space Shuttle Return to Flight and Beyond.

"The Vision for Space Exploration begins with safely returning the Shuttle to flight and resuming assembly of the International Space Station," said Michael Kostelnik, Deputy Associate Administrator for International Space Station and Space Shuttle Programs. "These processing milestones show we're moving toward that goal," he added.

Eighty-eight sensors will be installed on each wing. Sixty- six will measure acceleration and impact data and 22 will take temperature data during Discovery's climb to orbit. Ongoing tests have demonstrated these sensors can detect very small impacts.

Wiring has been added to the umbilical well under Discovery to accommodate a digital camera, which will transmit External Tank photos to the ground quickly. When the tank is separated from the Shuttle, an automatic sequence will capture 24 images, at one frame every 1.5 seconds. These images will be downlinked to Mission Control at the Johnson Space Center in Houston for review and analysis.

"The Program's first line of defense was to redesign the External Tank so that debris of a critical size never impacts the orbiters again," said Bill Parsons, Space Shuttle Program Manager. "We have done that. Combined with ground, airborne and onboard cameras and lasers, the addition of sensors will provide more detection and inspection capability than the Program has ever had," Parsons added.

The visible progress in Florida and other locations around the country parallels work by the Space Shuttle Program and its many contractor and subcontractor teams in response to the Columbia Accident Investigation Board's recommendations. NASA's Space Flight Leadership Council is the internal body reviewing the Shuttle Program's work, and the Stafford-Covey Return to Flight Task Group provides independent, external oversight. NASA is working toward a launch planning window for Discovery that opens in March 2005.

Since September 2002, Discovery has been in a regularly scheduled Orbiter Major Modification period for maintenance and upgrades. In addition to the Return to Flight work, more than 100 modifications have been performed, including the addition of the Multi-functional Electronic Display System, or "glass cockpit."

"Along with the power-up, we have passed several significant milestones during the last few months with the installation of the Forward Reaction Control System, the Reinforced Carbon-Carbon nose cap and wing leading-edge panels," Discovery Vehicle Manager Stephanie Stilson said. "I am very optimistic we are moving toward a launch next spring," she concluded.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy