SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
All NASA Elements in Place for Space Shuttle Return to Flight

 
PRESS RELEASE
Date Released: Thursday, January 6, 2005
Source: NASA HQ

image

NASA marked a major milestone for the Space Shuttle's Return to Flight, as the redesigned External Tank rolled out today from the barge that carried it to the agency's Kennedy Space Center (KSC), Fla.

The tank was taken to the Vehicle Assembly Building (VAB) for a final checkout. It will eventually be attached to the twin Solid Rocket Boosters and the Space Shuttle Discovery for its Return to Flight mission, STS-114.

"With the arrival of the External Tank, all of the elements of the Space Shuttle system are in place for Return to Flight," said Michael Kostelnik, deputy associate administrator for International Space Station and Space Shuttle programs. "This improved tank will be the safest we've ever flown. The modifications we have made will ensure the Shuttle completes its long- term mission of assembling the International Space Station," he said.

NASA and Lockheed Martin Corp. spent nearly two years modifying the 15-story, rust-colored tank to make it safer. Among dozens of changes is a redesigned forward bipod fitting to reduce the risk to the Shuttle from falling debris during ascent. Reducing the debris risk was a key recommendation of the Columbia Accident Investigation Board.

"Although we can never completely eliminate insulating foam coming off the External Tank, we have absolute confidence we have eliminated the type of debris that caused the loss of Columbia," said Bill Parsons, Space Shuttle program manager. "This tank is safe to fly the Return to Flight mission."

The External Tank arrived at KSC after a 900-mile journey at sea. It departed NASA's Michoud Assembly Facility in New Orleans on Dec. 31. It was transported via Pegasus, NASA's specially designed barge. The Solid Rocket Booster retrieval ship Liberty Star brought the barge to Port Canaveral yesterday. The barge was moved by tugs to the KSC Turn Basin, the tank off- loaded and transported to the Vehicle Assembly Building.

"The team here at KSC is tremendously excited to receive the final Shuttle element for the Return to Flight mission," said Mike Wetmore, director of Shuttle processing at KSC. "We have an experienced team in place that will complete the final checkout and processing of the tank and prepare it for its final journey out to the launch pad before flight."

In the VAB, the tank will be raised to a vertical position. It will be lifted high up in the transfer aisle into the "checkout cell," where the tank's mechanical, electrical and thermal protection systems are inspected. The tank will also undergo new processes resulting from its re-design, including inspection of the bipod heater and External Tank separation camera.

The tank will be prepared for "mating" to the Shuttle's Solid Rocket Boosters. When preparations are complete, the tank will be lifted from the checkout cell, moved across the transfer aisle and into High Bay 1. It will be lowered and attached to the boosters, which are sitting on the Mobile Launch Platform.

The arrival of the External Tank, the largest element of the Space Shuttle system, follows other recent Return to Flight milestones, including the "stacking" of the Solid Rocket Boosters in the Vehicle Assembly Building and installation of the Space Shuttle Main Engines into Discovery. The External Tank is the only Shuttle component not recovered after launch and reused.

The Return to Flight mission is targeted for a launch window beginning in May. The seven-member Discovery crew will fly to the International Space Station primarily to test and evaluate new procedures for flight safety, Shuttle inspections and repair techniques.

The Space Shuttle Propulsion Office at NASA's Marshall Space Flight Center, Huntsville, Ala., manages the tank project. Lockheed Martin Space Systems Co., New Orleans, is the primary contractor.

Video b-roll and sound bites of the tank shipment and arrival will be broadcast on NASA TV. Satellite coordinates and NASA TV schedules are available at: http://www.nasa.gov/ntv

For information on NASA's Return to Flight efforts, including fact sheets and photos about the tank shipment, visit: http://www.nasa.gov/returntoflight


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Planet 51 PSA Campaign Brings NASA's Message of Exploration Down to Earth

Planet 51 PSA Campaign Brings NASA's Message of Exploration Down to Earth

NASA Awards $350,000 to Winning Astronaut Glove Designers

NASA: Science Magazines Honor Cutting-Edge NASA Programs

CryoSat: green light for launch campaign

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy