SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
NASA Announces New Window for Space Shuttle Mission STS-121

 
PRESS RELEASE
Date Released: Tuesday, March 14, 2006
Source: NASA HQ

image

NASA announced today July 1 to 19 is the new launch planning window for Space Shuttle Discovery's mission, designated STS-121. The new window gives the agency time to do additional engineering work and analysis to ensure a safe flight for Discovery and its crew.

Space Shuttle Program Manager Wayne Hale made the announcement during a news conference from NASA's Johnson Space Center in Houston. The decision to target July followed a two-day meeting on the external fuel tank's engine cutoff, or ECO, sensors. The sensors indicate whether the tank still has fuel during liftoff. During testing, one of the four ECO sensors had a slightly different reading than is expected. Shuttle officials have decided they will remove and replace all four liquid hydrogen sensors.

"We've been saying for months that our engineering work would determine when we fly our next mission. Targeting July is the right choice in order to make smart decisions," said Bill Gerstenmaier, NASA associate administrator for Space Operations.

Other issues factored into the decision to adjust the STS-121 planning window.

- Testing and analysis are required on the space shuttle's modified external tank. The testing will help verify that the tank is safe to fly without the protuberance air load, or PAL, foam ramp. The PAL ramp was removed after a large piece of foam fell from that area during shuttle Discovery's July 2005 launch. Also, more analysis is needed to decide whether changes are needed on the tank's ice frost foam ramps.

- Repair work on the shuttle's robotic arm must be completed. Space shuttle technicians on a work platform device accidentally bumped the arm last week, causing a tiny crack. The arm will be removed for repair.

The STS-121 mission will take Shuttle Commander Steve Lindsey and six crew members to the International Space Station. This is the second mission in the Return to Flight sequence to evaluate new heat shield inspection and repair techniques and to deliver supplies and equipment to the station


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy