The International Space Station grew in size Tuesday with the addition of the P3/P4 integrated truss structure. It was delivered by STS-115, the first space shuttle mission devoted to station construction since late 2002. STS-115 is the first in a series of missions that will increase the station’s size and capabilities.
The new truss contains a set of solar arrays, batteries and associated electronics. The P3/P4 will provide power, communication and data services to the station. The solar arrays will double the station’s capability to generate power from sunlight when they go online during a future mission.
The STS-115 crew is conducting three spacewalks to outfit the 17.5-ton, 45-foot-long truss and to prepare the arrays for operation. The solar arrays will be unfurled on flight day 6 to a total length of 240 feet.
In addition to the construction work, the STS-115 astronauts and the Expedition 13 crew will transfer cargo between the two vehicles. Space Shuttle Atlantis and the STS-115 crew are slated to undock Sunday.
Share and Enjoy:
These icons link to social bookmarking sites where readers can share and discover new web pages.
News from Commercial Space Watch
- Decorate your home with nautical decor
- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.
- Play free bingo games and black out bingo.
- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.
- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.
- TV Stands