SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
Crew Completes Truss Installation, First Spacewalk

 
PRESS RELEASE
Date Released: Tuesday, September 12, 2006
Source: Johnson Space Center

image

Mission Specialists Joe Tanner and Heidemarie Stefanyshyn-Piper wrapped up STS-115's first spacewalk at 11:43 a.m. EDT. Their efforts centered on preparing the P3/P4 truss for operation. The new truss was installed this morning before the start of the spacewalk. Today's construction efforts marked the resumption of the on-orbit construction of the space station.

The spacewalking duo began the excursion at 6:17 a.m., and cruised through the timeline. They installed power and data cables between the P1 and P3/P4 structures in preparation for solar array deployment. They also released launch restraints on the Solar Array Blanket Box and performed other tasks to configure the structure for upcoming activities. They moved through the spacewalk so quickly flight controllers in the Mission Control Center in Houston gave them permission to complete tasks scheduled for future spacewalks.

The new truss element, which includes a set of new solar arrays, was attached to the station at 3:48 a.m. EDT. Tanner and Piper began their excursion after bolts connecting the P3/P4 to the P1 truss were tightly secured. The third of four bolts was tightened at 4:35 a.m., officially making the P3/P4 a part of the station.

The new 17.5-ton, 45-foot truss will provide power, data and communication services for the station. The arrays will be unfurled to a full length of 240 feet Thursday and will eventually double the station's power capabilities.

During the early stages of the spacewalk, the Mission Control Center in Houston told the STS-115 crew that no focused inspections of Space Shuttle Atlantis' heat shield were needed. The good news allows the crew to press ahead as planned with the mission's second spacewalk Wednesday.

Mission Specialist Dan Burbank coordinated the spacewalk activities. Mission Specialist Steve MacLean and Expedition 13 Flight Engineer Jeff Williams operated the station's robotic arm, which was used to install the P3/P4.

The astronauts will quickly begin preparations for the mission's second spacewalk, scheduled for 5:15 a.m. EDT Wednesday. Burbank and MacLean will conduct the spacewalk and will begin preparations with "camp out" in the Quest Airlock at 2:40 p.m. today.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy