SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store
NASA Receives First Stage Rocket Hardware For Ares I-X Test Flight

 
PRESS RELEASE
Date Released: Tuesday, November 18, 2008
Source: Kennedy Space Center

image

CAPE CANAVERAL, Fla. - NASA's Kennedy Space Center in Florida welcomed the arrival Nov. 10 of important hardware for the Ares I-X rocket's upcoming test flight.

Called the forward skirt, the component is part of the rocket's first stage. The Ares I-X launch will be the first test flight for NASA's next crew launch vehicle. The launch is targeted for July 2009 from Kennedy and will provide an early opportunity to test and prove hardware, facilities and ground operations associated with the Ares I rocket.

The forward skirt began its trip Nov. 7 from Major Tool & Machine Inc. of Indiana, a subcontractor to Alliant Techsystems Inc., or ATK, of Utah. ATK is the prime contractor for the first stage of the Ares I rocket.

The rocket's first stage provides the primary propulsion -- 2.6 million pounds of thrust -- for the vehicle from liftoff to stage separation, which occurs 120 seconds into the flight. Part of the first stage, the nearly 14,000-pound forward skirt is constructed entirely of armored steel and stands seven feet tall and 12 1/4 feet wide. The main deceleration parachutes that slow the return of the rocket's boosters to Earth after launch are attached to this hardware. The forward skirt was designed as an empty, buoyant space to be used as ballast, keeping the first stage afloat for recovery.

"We could not be more pleased that the vehicle first stage hardware is beginning to arrive," said Pepper Phillips, director of the Constellation Project Office at Kennedy. "This is one of many major milestones and is a testament to the tremendous NASA and contractor team working together to ensure a successful test flight for the new program."

The upper stage simulator was the first major piece of the Ares I-X rocket to arrive at Kennedy on Nov. 4. During the next few months, all of the additional hardware needed to complete the test vehicle will be delivered to Kennedy, beginning with a piece that simulates a fifth segment for the four-segment solid rocket booster and concluding with delivery of the complete motor set in January 2009.

United Space Alliance of Florida, under a subcontract to ATK, will complete the integration and assembly of the forward skirt in Kennedy's Assembly and Refurbishment Facility. The hardware then will be moved to the Vehicle Assembly Building for stacking operations in high bay 3 during the spring of 2009.

"The forward skirt has 12 parachute brackets, with each bracket restraining two parachute spools," said Bob Herman, ATK's Florida site director. "For the Ares I-X launch, six of these spools will be used to measure parachute loads passed on to the forward skirt. ATK is proud to play a critical role in helping NASA achieve its vision to return to the moon."

The rocket's deceleration subsystem includes the pilot, drogue and main parachutes. The pilot parachute is deployed at an altitude of 16,210 feet and pulls out the drogue parachute. When the drogue parachute opens, it slows the vehicle and orients it to descend tail first. The main parachutes are deployed as the forward skirt extension separates from the forward skirt. They are used to slow the final decent of the first stage to 48 mph, allowing a safe impact with the water.

The Ares I-X rocket is a combination of existing and simulator hardware that will resemble the Ares I crew launch vehicle in size, shape and weight. It will provide valuable data to guide the final design of the Ares I, which will launch astronauts in the Orion crew exploration vehicle. The test flight also will bring NASA one step closer to its exploration goals of returning humans to the moon for sustained exploration of the lunar surface and missions to destinations beyond.

NASA's Marshall Space Flight Center in Huntsville, Ala., manages the first stage for the Ares I-X project, which is located at NASA's Johnson Space Center in Houston.

Video B-roll of the arrival will be available on NASA Television's Video File feed. For NASA TV streaming video, schedules and downlink information, visit:

http://www.nasa.gov/ntv

For more information about the Ares I-X and NASA next-generation spacecraft, visit:

http://www.nasa.gov/ares


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands


advertisment

Learning About Telescopes

Learn about Telescopes

Recent Press Releases

Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

Nanotech in Space: Rensselaer Experiment To Weather the Trials of Orbit

ESO: Ticking Stellar Time Bomb Identified

China Joins Thirty Meter Telescope Project

Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free


Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy