SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Processing Status Report 18 March 2005

 
STATUS REPORT
Date Released: Friday, March 18, 2005
Source: Kennedy Space Center


Mission: STS-114 - 17th ISS Flight (LF1) - Multi-Purpose Logistics Module
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Launch Planning Window May 15 - June 3, 2005
Launch Pad: 39B
Crew: Collins, Kelly, Noguchi, Robinson, Thomas, Lawrence and Camarda
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility (OPF) bay 3, final processing work continues on Discovery in preparation for its rollover to the Vehicle Assembly Building (VAB) and mating, or attaching, to its Solid Rocket Boosters and External Tank. The rollover milestone is moving to March 27 (previously March 22), due to additional work needed on wiring in the payload bay and on the main and nose landing gear doors. Because work is scheduled to end late that day, rollover could take place the morning of March 28. If the work is completed safely and correctly, the orbiter could be moved to the VAB earlier than March 27.

On orbiter Endeavour, wiring was found in a cable tray in the payload bay that showed the fasteners were causing minor chafing on the tubing surrounding the wires. Boroscope inspections of wire trays on Discovery are complete, and some wires will require additional work. The wire tray covers will be removed and chafe protection will be added. Work on the seal installations and cycle checks on the main and nose landing gear doors is almost complete.

Installation of resupply stowage racks in the Italian-built Multi-Purpose Logistics Module (MPLM), Raffaello was completed on Monday. Installation of the resupply stowage bags continues in preparation for MPLM hatch closure, currently scheduled for mid-April. Installation of a Control Moment Gyro (CMG) onto a Lightweight Multi-Purpose Experiment Support Structure Carrier was completed on March 14. During the mission, a spacewalk will be performed to replace an inoperable CMG.

Mission: STS-121 - 18th ISS Flight (ULF1) - Multi-Purpose Logistics Module
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1
Launch Date: Launch Planning Window July 12 - July 31, 2005
Launch Pad: 39B
Crew: Lindsey, Kelly, Sellers, Fossum, Nowak and Wilson
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In OPF bay 1, work continues on Atlantis' Return to Flight mission, designated STS-121, to the International Space Station. Technicians are completing the final work in preparation for engine installation which is scheduled for next week. Main Propulsion System leak and functional electrical checks continue. Electrical checkouts of fuel cells No. 1 and 3 are complete.

Preparations are in work for the installation of the new Orbiter Boom Sensor System (OBSS), which was scheduled to arrive at KSC yesterday. Checkout and installation of the four Manipulator Positioning Mechanisms that will hold Atlantis' OBSS on the starboard side of the payload bay is under way. The 50-foot-long OBSS will attach to the Remote Manipulator System, or Shuttle robotic arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space.

NASA's second redesigned Space Shuttle External Tank, designated for use on mission STS-121, arrived on Tuesday at the Launch Complex 39 Area Turn Basin at Kennedy Space Center. It was offloaded and transported to the VAB and was lifted Wednesday into the checkout cell for final processing. Technicians are beginning preparations for the aft hard-point closeout spray.

Endeavour (OV-105)

Orbiter Endeavour remains in the Florida Space Authority's Reusable Launch Vehicle hangar at Kennedy Space Center. While in the hangar, Endeavour underwent testing to see how orbiters respond to a new radar system that will be used to detect debris during launch. In the OPF, work included modifications to the bay and platform validation. Endeavour will return to OPF bay 2 today.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free