SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

New Horizons: The PI's Perspective April 2005

 
STATUS REPORT
Date Released: Tuesday, April 5, 2005
Source: Johns Hopkins University


image

By Alan Stern

As March ended, additional elements of the spacecraft and instrument payload were installed on the New Horizons spacecraft. These included an array of heaters, inertial measurement units, a repaired flight computer, and the Ralph remote sensing instrument package. This is a major milestone for the project team!

Thus, as April begins, New Horizons is ready to move from the assembly phase to integrated spacecraft-level testing. As a part of this, the spacecraft and its instruments - which in combination we call the "observatory" - will be put through its paces in a five-day "Comprehensive Performance Test," or CPT. In the CPT, virtually every function aboard the spacecraft is put through its paces. In all, this involves several hundred individual tests. While each piece of the spacecraft has been individually tested, both against their performance criteria and to the rigors that the hardware will see in flight, it is only now that the collection of parts plays together as a symphony.

Following this, in early May, we plan to conduct an in-depth review of the detailed readiness of the observatory to begin environmental testing, and then move into that even more rigorous testing phase. During environmental testing, the observatory will be subjected to simulated launch vibrations, hot and cold thermal cycling (more demanding than anything it will experience in flight), and mission simulations and other performance testing in a room-sized vacuum chamber.

Some of the environmental tests will take place at the Johns Hopkins University Applied Physics Laboratory in Laurel, Maryland, where New Horizons was designed and assembled. Other parts of this testing will take place at NASA's Goddard Space Flight Center in Greenbelt, Maryland. Environmental testing will continue through at least July to certify that all of the hardware and software aboard the observatory are ready for flight.

And while all of this is taking place, our launch vehicle is under construction, detailed flight procedures and command scripts for the early phases of flight are being written (and tested) by spacecraft and instrument team members, and planning is taking place to knit together a tightly woven plan for our hoped-for Jupiter encounter in early 2007.

This is an exciting time! It's also, obviously, a busy time. I like to say, "The road to Pluto and the Kuiper Belt isn't paved with bricks; it's paved with long hours."


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free