SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Station Status Report 3 August 2006

 
STATUS REPORT
Date Released: Thursday, August 3, 2006
Source: Johnson Space Center


image

Space station crewmen Jeff Williams and Thomas Reiter worked quickly through scheduled spacewalk tasks Thursday, then completed three get-ahead jobs, or extra tasks, and were ready for more. Mission Control assigned two more jobs, which the astronauts also completed.

Williams and Reiter wrapped up their productive 5-hour, 54-minute excursion and began repressurizing the Quest airlock at 3:58 p.m. EDT.

The astronauts left the airlock in U.S. spacesuits at 9:04 a.m. EDT. Station Commander Pavel Vinogradov helped them with spacewalk preparations and getting into their suits. It was the first time in more than three years a third crewmember had been available for those tasks on the orbiting laboratory.

Williams, designated lead spacewalker, or EV1, wore the U.S. spacesuit with red stripes. Reiter, EV2, wore the all-white suit.

Astronaut Steve Bowen acted as spacewalk intravehicular officer and coached the astronauts from the International Space Station Flight Control Room in Houston's Mission Control Center. Williams and Reiter quickly got ahead of their timeline. First, they installed the Floating Potential Measurement Unit. The device measures the electrical potential of the station so procedures can be devised to minimize arcing hazards, or the jumping of current from a conductor to a ground, as the station grows.

Their second job was to install two MISSE containers, or Materials on International Space Station Experiment. The suitcase-like containers are left open to evaluate the long-term effects of space exposure on a variety of materials. The idea is to identify optimal materials for use in future spacecraft. MISSE 3 went on one of the high-pressure tanks around the crew lock, while MISSE 4 was installed on Quest's outboard end.

The two astronauts then went on to separate jobs. Williams installed a controller for a thermal radiator rotary joint on the S1 truss, while Reiter replaced a computer on the truss.

Williams then began installing a starboard jumper and spool positioning device (SPD) on the S1 truss. Reiter inspected a radiator beam valve module SPD site where one device was already installed and installed an additional one. He then moved on to install a SPD on a port cooling line jumper. The jumpers are designed to improve the flow of ammonia through the radiators once that coolant is installed.

Williams began setup for the final major scheduled task, a test of an infrared camera designed to detect damage in a shuttle's reinforced carbon carbon (RCC) thermal protection. The camera highlights damage by showing variations in temperature between clean and damaged RCC test sections. Reiter operated the experiment while Williams went on to one of the additional tasks.

The first task was installation of a light to help future spacewalkers on the truss railway handcart. Williams then removed a malfunctioning GPS antenna. After Reiter finished the infrared camera experiment, he installed a vacuum system valve on the U.S. laboratory Destiny for future scientific experiments.

Mission control came up with additional tasks. Williams moved two articulating portable foot restraints to prepare for STS-115 spacewalks and then photographed a scratch on the airlock hatch. Reiter went to PMA1, a pressurized "corridor", to retrieve and inspect a ball stack, which holds hardware during spacewalks. The crew also had additional time throughout the spacewalk to photograph the worksites after their tasks were complete and then snap pictures of each other at the end. With no more quick tasks to add, the spacewalkers re-entered the airlock and closed the hatch early.

The next station status report will be issued on Friday, Aug. 11, or earlier if events warrant. For more about the crew's activities and station sighting opportunities, visit:

http://www.nasa.gov/station


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NOMAD Outreach: Impacts of E-mail Services and Forwarding Policy - NITR 2800-2

NASA MODIS Image of the Day: November 20, 2009 - Snow Across Ontario, Canada

NASA Expendable Launch Vehicle Status Report 19 Nov 2009

Joint USAF/NOAA Report of Solar and Geophysical Activity 19 Nov 2009

NOAA SATOPS Morning Report: Wednesday, November 18, 2009

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free