NASA Space Shuttle Processing Status Report 1 September 2006

 
STATUS REPORT
Date Released: Friday, September 1, 2006
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Truss Segment and Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39B
Launch Date: Sept. 6, 2006, 12:29 p.m. EDT
Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At Launch Pad 39B, preparations for Wednesday's launch are under way, with the launch countdown scheduled to begin on Sunday at 8 a.m. The liquid oxygen and liquid hydrogen transfer lines used for filling the external fuel tank (ET) were reconnected to the mobile launch platform. The ET hydrogen vent line hook-up is complete. The ordnance was disconnected to allow for vehicle power-up and will be reconnected this weekend. The Orbiter Midbody Umbilical Unit (OMBUU) mate is complete. This is the connection point for lines that will be used to provide hydrogen and oxygen reactants for the fuel cells. Weekend work includes pressurization of the orbital maneuvering system, the reaction control system and the main propulsion system. The two doors to the aft compartment of Atlantis were removed for access to ordnance, and they will be closed during the weekend to allow for the aft confidence test on Sunday. This test involves powering up and testing all aft systems, such as the main propulsion system circuits.

On Tuesday, the shuttle was moved off the pad in advance of Tropical Storm Ernesto, then returned to the pad after traveling about 2 miles toward the Vehicle Assembly Building when the storm predictions became more favorable. On Thursday, engineers inspected the ET thermal protection system, post-rollback, and found three areas of minor foam damage. One area, about 3/8 inches long, is located at the midsection of the liquid oxygen tank, about 2 feet outboard of the ice frost ramps. A second area, about 1 inch long by 1/16 inch wide, is located near the ET/right SRB aft fairing, which is the attach point between the two components. Both of these resemble a scratch, are accessible and are expected to be easily repaired. The third area, a missing foam nodule from the liquid hydrogen barrel between the ET and the left SRB, about five feet below the intertank flange closeouts, will not need repair.

Mission: STS-116 - 20th International Space Station Flight (12A.1) - P5 Truss Segment
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: No earlier than Dec. 14, 2006
Launch Pad: 39B
Crew: Polansky, Oefelein, Curbeam, Higginbotham, Patrick, Fuglesang and Williams
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Processing of Discovery for its next mission, STS-116, continues in Orbiter Processing Facility bay 3. Work was interrupted this week by the arrival of Tropical Storm Ernesto, but the vehicle is now configured for normal operations, and system testing on the main propulsion system continues. Preparations for removal and replacement of auxiliary power unit No. 3 are in work. The brake anti-skid and nose wheel steering testing is in work. Final closeouts are under way to complete installation of the orbiter's drag chute. This weekend the orbiter's thermal protection system will be waterproofed.

Endeavour (OV-105)

Powered-up system testing continues on Endeavour in Orbiter Processing Facility bay 2 following an extensive modification period. Work was interrupted this week by the arrival of Tropical Storm Ernesto, but the orbiter is now configured for normal work and technicians are performing electrical tests on the remote manipulator system (shuttle arm) pedestal wire harnesses. Rigging of the orbiter boom sensor system pedestals is under way. Workers continue to remove and replace gap fillers in the high priority areas of the orbiter's underside.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free