SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-115 MCC Status Report #09

 
STATUS REPORT
Date Released: Wednesday, September 13, 2006
Source: Johnson Space Center


image

Wednesday, Sept. 13, 2006 - 7 p.m. CDT
Mission Control Center, Houston, Texas

The crews of Atlantis and Expedition 13 had a busy fifth day together in space as they brought to life the new addition to the International Space Station they had attached on Tuesday.

During the second spacewalk of the STS-115 mission, first-time spacewalkers Dan Burbank and Steve MacLean devoted the day to the final tasks required for activation of the Solar Alpha Rotary Joint (SARJ). The SARJ is an automobile-sized joint that will allow the station's solar arrays to turn and point toward the sun. Burbank and MacLean released locks that had held the joint secure during its launch to orbit aboard Atlantis. As they worked, the spacewalkers overcame several minor problems, including a malfunctioning helmet camera, a broken socket tool, a stubborn bolt and a bolt that came loose from the mechanism designed to hold it captive. The stubborn bolt required the force of both spacewalkers to finally remove it.

Burbank and MacLean spent seven hours and 11 minutes outside the station, beginning their spacewalk at 4:05 a.m. CDT and completing it at 11:16 a.m. CDT. In addition to the SARJ work, they completed several "get-ahead" tasks during their time outside.

Once the spacewalk was completed, Mission Control began a planned four-hour activation and checkout of the SARJ. The checkout is designed to ensure all primary and backup systems on the mechanism are operating well. Early in the checkout, controllers engaged the first of two drive lock assemblies, DLA-1, and rotated the massive joint 180 degrees.

Later in the checkout, the procedure called for engaging a second drive lock assembly, DLA-2, and rotating the joint again 360 degrees. When controllers commanded DLA-2 to engage, they did not get an indication the drive assembly had properly engaged. Controllers then sent commands for a procedure designed to correct any poor engagement of the mechanism, but still did not receive an indication it had properly engaged.

Engineers are evaluating the concern and have temporarily delayed starting the deployment of the new solar arrays pending further work and checkout of the SARJ. The timeline allows ample time to continue working on the problem during the night and still complete the deploy of the arrays on Thursday as scheduled.

The next STS-115 mission status report will be issued Thursday morning, or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

NASA Hubble Space Telescope Daily Report #4973

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free