SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Status Report 15 December 2006 - 9:30 a.m. CST

 
STATUS REPORT
Date Released: Friday, December 15, 2006
Source: Johnson Space Center


image

With half the International Space Station's electrical system rewired, the crew of Space Shuttle Discovery gets half a day off today before they finish the job during a third spacewalk set for Saturday.

Mission Specialists Bob Curbeam and Christer Fuglesang rewired channels 2 and 3 of the station's power system in a five-hour spacewalk Thursday. A similar task will be done with the two remaining station power channels, channels 1 and 4, on Saturday. However, for Saturday's spacewalk, Curbeam will be joined by International Space Station Flight Engineer Suni Williams for the outside work while Fuglesang will coordinate activities inside the spacecraft. Once the third spacewalk is complete, power will be fully online from the station's P4 Truss solar array wings, which were installed in September. At that point, the station's power system will be ready for additional expansion with more arrays and new laboratories to be delivered next year.

Discovery Commander Mark Polansky and his crew-Pilot Bill Oefelein and Mission Specialists Nicholas Patrick, Joan Higginbotham, Thomas Reiter, Curbeam and Fuglesang?were awakened at about 8:52 a.m. CST to the song "Low Rider," performed by War, and played for Oefelein.

Discovery and the station are in good condition. Discovery is currently maintaining the orientation of both the station and shuttle using the shuttle steering jets, a function it began performing during preparations for the spacewalk on Thursday. Control of the station's orientation was transferred to Discovery on Thursday as part of the normal preparations of the station's power system for the rewiring job. The station usually uses its own control moment gyroscopes to maintain its orientation, without having to use fuel.

Originally, control of the station's orientation was to be transferred back to those gyroscopes late Thursday after the spacewalk tasks were completed and station systems powered up. However, problems were experienced as that transfer was attempted. Flight controllers believe the problems were due to a higher than usual amount of atmospheric drag currently experienced by the station due to recent solar activity. They may attempt to transfer control of orientation back to the station again today, although the shuttle thrusters can be used if needed for that purpose through the rest of the mission. If necessary, the station has thrusters that can be used for orientation control as well.

During the first half of their day, the astronauts will transfer supplies and equipment between the station and shuttle. At 1:07 p.m. the two European Space Agency astronauts, Fuglesang of Sweden and Reiter of Germany, will participate in a VIP call from Swedish dignitaries. At 2:47 p.m. all 10 astronauts and cosmonauts on the shuttle/station complex will conduct a news conference with reporters in the U.S. and Europe. The shuttle crewmembers will be off duty the last half of the day.

Station Commander Michael Lopez-Alegria and Flight Engineer Mikhail Tyurin are scheduled for interviews with KNX Radio, Los Angeles, and National Public Radio at 4:27 p.m. CST.

Engineers investigating the difficulties with fully retracting the port-side solar array wing of the station's P6 Truss believe a guide wire may be snagged in a swiveling grommet on one of the array's panels. The snag could be keeping the panels from folding up completely. The array remains almost halfway retracted as it has been since Wednesday. Early this morning, station flight controllers commanded the array through a series of "wiggle" tests, swiveling the wing 10 degrees at a time repeatedly to see if that would help the situation. They are continuing to evaluate the results of those tests and to investigate options for further work with the array, including the potential to add a spacewalk to latter part of this mission. Options also may include some additional troubleshooting commanding that could be performed with the array during the crew's day today.

The next STS-116 status report will be issued Friday evening or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free