NASA Space Shuttle Processing Status Report 20 April 2007

 
STATUS REPORT
Date Released: Friday, April 20, 2007
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Vehicle Assembly Building
Launch Date: Targeted for June 8, 2007
Launch Pad: 39A
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester and Olivas
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In high bay No. 1 of the Vehicle Assembly Building, technicians and engineers continue repairing foam on the hail-damaged STS-117 external fuel tank, ET-124. The poured foam repairs are nearly complete, and technicians are trimming and sanding repair sites. Spray foam repairs are scheduled to begin next week. Due to the amount of tank repair work remaining, the rollout of Atlantis to the launch pad is now scheduled for May 12. This six-day change should not affect the June 8 target launch date.

Preparations are complete for the removal of Atlantis' three main engines to inspect for flow liner contamination. Engine removal is scheduled to begin next week. This work can be accomplished within the time frame of the tank repair.

Mission: STS-118 - 22nd International Space Station Flight (13A.1) - S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Aug. 9, 2007
Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Anderson
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Two of the three orbiter main engines have been inspected and reinstalled. All three engines were removed last week to allow for flow liner contaminant inspections. No RepliSet contamination was found in any of the flow liners. The orbiter boom sensor system, which was removed for mechanical repairs on the boom pedestals, was reinstalled this week. The system and the shuttle arm will be deployed today, and technicians will begin installing the sensor packs in the boom. The nose landing gear wheel/tire assembly was installed this week, and the steering and brake tests are complete.

ET-117, the external fuel tank to be used for STS-118, is scheduled to be transported from the barge in the turn basin to the Vehicle Assembly Building on April 30. The tank will then be lifted into a checkout cell in high bay No. 2 West for processing.

Mission: STS-120 - 23rd International Space Station Flight (10A) - U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3, water spray boiler system servicing and checkout continues. Wire tray closeouts in the midbody are ongoing and cargo bay closeouts are under way. The forward reaction control system will be delivered to the facility's bay No. 3 today and installed next week. Functional testing on all three fuel cells is complete. Inspections of the main propulsion system flow liners are finished.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NOMAD Outreach: Impacts of E-mail Services and Forwarding Policy - NITR 2800-2

NASA MODIS Image of the Day: November 20, 2009 - Snow Across Ontario, Canada

NASA Expendable Launch Vehicle Status Report 19 Nov 2009

Joint USAF/NOAA Report of Solar and Geophysical Activity 19 Nov 2009

NOAA SATOPS Morning Report: Wednesday, November 18, 2009

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free