STATUS REPORT Date Released:
Sunday, March 18, 2001
Source: Johnson Space Center
ISSMER Daily Report
Date: 3/18/01
STS 98/ISS 5A.1
GMT: 76:06:00 To GMT: 077:06:00
(12 a.m. 3-17-01 to 12:00 a.m. 3-18-01)
OVERALL SYSTEM STATUS:
ISS/Shuttle docked, ISS in control of attitude:
FGB
: SD 1,3,4 and 5 powered off do to telemetry problems, all other SD on, Dew Point 52.8 deg. F, 11.5 deg C (52.8 deg. F, 11.5 deg C); EPS: Nominal; Battery 6 offline in deep discharge (nominal). FGB Komparus failed and deactivated. C&DH: FGB-2 MDM on, FGB-1 MDM off.
SM
Elektron is off. Vozdukh is on. BMP status is on. CKB1 is on and in condensing mode; CKB2 is failed sensor and is non operational, powered off. Rapid depress response is off, Low-pressure warning is enabled. Dew Point 49.8 deg. F, 9.8 deg C (52.5 deg. F, 11.4 deg C).EPS: Nominal; Batteries in incomplete charge mode. SM ARCUs 22 online. SMTC: SMTC-1, 2 are operating in the redundant set. SMTC-3 was reported out of the set at GMT:2001/066:14:00 GMT; SMCC: SMCC 1, 2, and 3 are all operating in the redundant set. SMCC-1 is primary.
NODE1
ACS: Pressure limiting inhibited. Both Node 1 PPRVs are not capped-MOD uncapped during PMA3 depress. IMV Fans: Node 1 Aft Port operating; all others off. IMV Valves: Node 1 aft port open and enabled; Aft Stbd closed and enabled; Port-fwd inhibited, Deck Aft is open and enabled; Deck Fwd is closed and enabled; Stbd both inhibited; Fwd both enabled and open. FDS: SD-1 enabled, SD-2 Smoke detector off due to RPC Trip. THC: Node 1 cabin fan is operating; RAMV (N1 side) is enabled in 90% cool for MPLM. C&DH: N1-2 MDM is primary, N1-1MDM is secondary
LAB
PCA: Lab PCA on and monitoring. Positive Pressure relief is enabled VRCV and VRIV are closed. IMV Vlv/Fans: aft IMV valves are enabled and open. Aft port IMV fan is on. Fwd Stbd IMV valve is enabled and open. Fwd Stbd IMV fan is on. FDS: Smoke detectors LAB1PD1, LAB1SD5, & LAB1D6 on. CCAA: LAB1P6 full up. CDRA: Fail state. TCCSS: Full up state. MCA: Operational and providing US lab and Node. VacuumSystem: VRS & VES are closed. All VES RIVs are closed. Water Venting: Post Heat State. Condensation tank quantity indicates 70.3 lbm (70.42 lbm). Condensate "T" is not installed. Cabin Pressure: 14.66 psia (14.65), Cabin Temp 74.3 deg. F. (76.1 deg. F), ppCO2 is 3.1 mmHg (3.9 mmHg), ppO2 is 162.2mmHg (158.7 mmHg). EPS: is nominal., RWS-Lab UOP 7 had GFCI trip during checkout. RPCM N13B-A RPCM 16 (Node SD2) experienced an over current trip;TCS: ATCS &PTCS are nominal;. ITCS: LT and MT in dual loop mode. The low temperature 3-way mixing valve is in full flow through, with outlet temperature of 44.8 deg. F (7.1 deg. C). The moderate temperature 3-way mixing valve is controlling to outlet temperature to 63.3 deg. F (17.4 deg. C.) Rack temperatures are nominal. C&T: Ecomm is powered off. S-band: configured for HDR; Audio Subsystem: configured for IAC2 and operations are nominal. AUAI2S, RAIU 1 have PBIT Faults. VideoSystem: Operational. CBCS: Video cabin from ISS to PMA2 and shuttle in check out testing. C&DH: C&C MDMs: 1 is primary, 2 is backup, 3 is in standby. INT MDM: INT-2 is operating, INT-1 is off. GNC MDMS: GNC-1 primary, GNC-2 backup; LA MDMs: LA-1, LA-2, and LA-3 operating.; PL MDM: PL-1 primary, PL-2 Standby
Crew Systems:
TVIS is operational with foot plate installed. IRED only one canister operational, no fix til 6A.
MPLM
: Temperature is 75.38 deg. F, 24.1 deg C. (76.8 deg. F, 24.8 deg C). (MPLM shell heaters have been turned off). Overhead Aft IMV enabled and open; Overhead Fwd IMV valve closed; cabin fan on, smoke detector on; PPRA 1, 2, and 3 are closed. MDM Operating.
P6
: Both PCUs in discharge mode. PVCU MDM 2B is prime/4B Backup. BGAs in Auto Track Mode. EETCS Loops A&B running on A pumps; FCV enabled; PFCS line heater 1&2 for loop B and B operational. RPCMs: N13B-A & N14B-C have health flags. PMCU: PMCU-1 MDM primary, MPCU-2 off.
GNC
: ISS is currently flying in TEA ISS/CMG TA in control of Mated stack, Beta Angle 8.3 deg. Magnitude is decreasing (15.9 degrees and mag decreasing). Avg. altitude is 213.3 x 204.9 nm 395.1 x 379.4 km (211.7 x 203 nm; 392.18 x 376.02 km). S&M subsystems quiescent and operable.
Previously Reported Status
Activation of RWS
MPLM transfer activities
Trouble shooting of CBCS
Node 1 8A & 9A heaters forced to enable. 2nd occurrence within 24 hours.
C&C #3 MDM successfully loaded and reinitialized.
Last 24 Hours Status
SD-2 RPCM trip during power up post charcoal filter replacement activities.
RWS Checkout tripped UOP 7. Reconfigured for one monitor only, checkout completed.
ISS reboost
MPM transfer activities.
ISS initialized vents (Pre heated to 260 deg. F) for impending water dump.
SIGNIFICANT EVENTS SCHEDULED FOR THE NEXT 24 HOURS:
Water dump 8 a.m.
MPLM Packing
MPLM Deactivation
Vestibule Depress
MPLM Re-Berthing operations.
Open Chits
Number (ISS)
Response Due (GMT)
Summary of Progress
(OPEN ISSMER CHITS --
LATE ISSMER CHITS -- NON ISSMER CHITS)
Chits without further MER Input required Chits that require MER Manager Action!
The following chits are all in Mission STS-098_5A
ISS0009
2001/037:00:00
MOD to IPRUSSIA, ISSMER "5A Increment Full C&W Checkout Procedure"
3/9 MER-M is not ready to close this CHIT DO NOT CLOSE
ISS0126
2001/046:18:00
ISSMER to IPRUSSIA,MOD "Russian Depress Sensor Status"
2/26 MOD response is in, need response from Russians
ISS0199
2001/060:17:04
MOD to ISSMER "S-bd Forward Link Audio Demux Activity"
3/9 Expect info from HB and KSC today or tomorrow to close early next week. C&T Test scheduled for ISL on 3/22 to characterize data stream corruption of MRELP
ISS0204
2001/060:00:00
MOD to ISSMER "Add NCS Loadshed Table 5 to Recon"
3/10 ISSMER response provided.
ISS0206
2001/088:15:00
ISSMER to IPRUSSIA "SMCC lane drop on GMT day 0505"
ISS0211
2001/061:20:00
Post-5A.1
MOD to ISSMER "LA 1,3 LLA 11 Channel Anomalies"
3/10 HSV says data will not be available until post-5A.1. C&DH has concurrence from ODIN that this is OK.
TI0107
???
ISSMER to ??? -- Loss of S-Band Forward Audio Detection and Recovery"
3/10 C&T still working this. When ready to open, transfer to a 5A.1 chit.
TI0249
2001/????
ISSMER to IMC, MOD, IPRUSSIA - "The Use of L200 Foam for Insulation Used around the SM Air Conditioner"
3/9 Want to add to 5A.1 Increment Ops job jar. HOLD Opening until after 5A.1 Mission. Should also transfer to 5A.1 Database.
The following chits are all in Mission STS-102_5A.1
ISS0035
2001/071:20:30
IMC to IPRUSSIA, ISSMER, MOD -- "REQUIREMENTS: Updates to Stage 5A.1 Priorities"
ISS MER Response Provided
ISS0043
2001/071/23:00
MOD to ISSMER "Mass Properties Information for RSC-E Assembly & Config"
MER Response Complete
ISS0091
2001/075:17:34
IPRUSSIA to MOD "S-Band timeline request"
ISS0100
2001/075:06:00
IMC to IPRUSSIA, ISSMER, MOD, CSR "5A.1 ADD Docked Day to Flight for MPLM Stowage"
3/17 MER Response Completed
ISS0105
2001/077:14:39
IPRUSSIA to MOD "Onboard Control Events Protocol & Data on C&W signals appearance in USOS"
ISS0108
2001/076:02:00
IMC to IPRUSSIA, ISSMER, MER, MOD "5A.1 Transfer: FD9, Russian Manifest/Transfer List"
3/17 MER Response Provided
ISS0110
2001/077:18:07
ISSMER to MOD, IMC "TVIS Imagery"
ISS0114
2001/100:16:00
MOD to ISSMER; Request patch for PMCU dump packet time
Assigned to C&DH
ISS0115
2001/090:16:00
MOD to ISSMER; Request fix for LA-1 MDM LLA 15 channel fails
Assigned to C&DH
ISS0116
2001/077:16:00
IMC to CSR, ISSMER, MER, MOD "5A.1 Transfer: (Shuttle Middeck) FD9, US Manifest/Transfer List"
S&M , L&M has responded. Need to have schedule review.
ISS0118
2001/078:00:00
IMC to ISSMER, MOD "USL Window Constraint"
Safety reviewing
TI0113
??????
IMC to MER; 5A.1 Transfer (MPLM): FD9, US Manifest/transfer list
TI0132
"Request to Inhibit HRDL Fault Safing"
TI0133
2001/079:18:00
ISSMER to MOD; Ku-Band Software Mask Verification
Closed Chits
Number (ISS)
Response Due (GMT)
Summary of Progress
The following chits are all in Mission STS-098_5A
ISS0207
2001/068:15:00
ISSMER to MOD "Node 1 MDM CPU utilization dump requests"
The following chits are all in Mission STS-102_5A1
ISS0011
2001/066:12:00
ISSMER to IPRUSSIA "Request for SMCC Lane Change Information"
ISS0076
2001/073:16:00
MOD to ISSMER "S-Band RFG Antenna Self Test Failure"
ISS0088
2001/074:16:00
IMC to CSR, ISSMER, MER, MOD "5A.1 Transfer (MPLM): FD8, US Manifest/Transfer List"
ISS0090
2001/074:21:00
IMC to ISSMER, CSR, MOD "Requirements: Request for MACE II data download to PCMCIA"
ISS0096
2001/075:18:00
ISSMER to MOD "Label SWIS Network Control Unit (NCU)"
ISS0106
2001/077:00:00
ISSMER to MOD "Request BDTs to verify health of SSU 2B"
ISS0112
2001/076:18:30
MER to MOD; Lab Condensate Dump Nozzle Preheat Time Out Workaround
ISS0104
2001/076:12:00
ISSMER to MOD "Antenna Calibration to avoid SSU radiation"
ISS0103
2001/076:16:00
IMC to CSR, ISSMER, MER, MOD "5A.1 Transfer (Shuttle Middeck): FD8, US Manifest/Transfer List"
ISS0111
2001/076:08:00
MOD to ISSMER "MPLM Heater Activation Times"
ISS0101
2001/076:02:00
ISSMER to IMC, MOD, CSR, MER "Return of Dessicant Bags"
Open Items for Investigation (IFIs)
Number
Title/Summary
Status
170
PCU Tubes never reached temp when heaters active
3/6 Final solution in work. PRACA?
210
FPP Failure to Acquire Data
3/6 Need data from Eliason
218
EVA Tool does not fit TCS Nonpropulsive Vent bolt heat
3/8 Need to have details of EVA bolt resolution at KSC. Ready to close?
227
Burnt wires on veloergometer control box
3/6 Need data filled in by EV&CS
229
HRDL MSD Inaccessible
3/6 Need data filled in by C&DH
230
Node 1 PMA Duct Missing Parts
3/16 Need to find out from crew how duct was reconfigured following the Soyuz relocation. Parts are on orbit. Has the crew found them yet?
235
Treadmill Slats Broken
3/16 Need data filled in by EV&CS Have FIAR. Can close when IFI data filled in.
241
Station Vibration During TVIS Exercise
3/16 Need data filled in by S&M or EV&CS? Waiting for IWIS data.
244
Periodic Annunciation of S-Band XPDR Non-critical Failure advisories
3/8 Need Software PR. Needs to go to ASCB to get approval to write PR. C&T and C&DH working this.
245
S-Band BSP Loss of Forward link Audio Channel RELP Sync
3/7 Close to S/W PR 2124? C&T confirming with MEIT data that this is the same problem.
247
Hitch Pin on WIF adapter Separated from Lanyard
3/16 Have FIAR. EV&CS providing additional data for closure.
248
Audio Subsystem AUAI2S PBIT Indication
3/7 Hardware is working. C&T needs additional data dumps to diagnose problem. Check PBIT chit.
249
C&C-2 MDM Switched to Diagnostic from Primary
3/8 PPL uploaded. Still in work by ASCB?
253
SM KURS-P "Not Normal" Indication
SM Nadir Port Set 1 Self test failed twice. MCC-M plans to test on aft port to try isolate problem to the cable. SM Aft port test passed 3/16 VI/Jack Bacon working this. Need to fill in IFI data.
254
BGA Observed vs Commanded Position (part 3)
3/16 Non problem, but need NASA S/S Manager concurrence. Need Flt Rule CR to document reqt to lock BGAs?
- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.
- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.