NASA STS-117 FD05 Execute Package

 
STATUS REPORT
Date Released: Tuesday, June 12, 2007
Source:


image

Download complete document

FD4 MMT Crew Summary 2

The MMT met today to discuss mission progress, review the FD 2 inspection and FD 3 RPM photography, and discuss the Port OMS Pod blanket. As expected preflight, the MMT agreed with the recommendation to add two mission extension days and an EVA 4 to accomplish additional ISS tasks. The team appreciates your hard work and enjoyed following your progress today with the S3/S4 truss install and EVA 1.

Imagery/Debris Assessment Team:

The imagery and debris assessment teams have completed their review of the FD2 inspection data and FD3 RPM photography and have concluded that no Focused Inspection with OBSS is required. The team has reviewed all the LDRI data and cleared the RCC (starboard wing, port wing, and Nosecap) for entry.

The FD3 RPM data review has been completed and all TPS is clear for entry except for two protruding gap fillers and one tile area near the outboard edge of the port ET door which will likely be cleared tomorrow. One of these gap fillers is near the arrow head tile directly aft of the nose landing gear door and the other is on an aft tile forward of the bodyflap. Aerothermal analysis including the possible tripped flow downstream of these gap fillers continues. Based on the data obtained through FD 4, the team does not currently believe that any gap filler removal is required. A summary of the gap fillers and minor tile damage are shown in the figures below.

There are two areas where adequate data was not obtained for the TPS inspections including an area around Window 5&6 and the Right Inboard Elevon. These areas had shadows that obscured the areas of interest and additional imagery for these areas may be requested using ISS or SRMS assets.

Port OMS Pod Blanket:

The aero thermal analysis was discussed today and indicates that the entry thermal environment will result in localized temperatures inside the exposed cavity that exceed the OMS pod graphite epoxy structure certification limits. The heating is predicted to be slightly higher in this area than past flights with similar damage because the blanket extends up into the flow resulting in increased heat transfer in this cavity. The flow in this area is very difficult to model, thus certain best estimate engineering assumptions had to be applied in order to accurately model the heating.

Based on this preliminary thermal analysis and the limited test data available for this type of graphite composite structure, the MMT decided that the TPS is suspect for this area and the blanket will require a repair prior to deorbit/entry. This decision was based on the potential for thermal structural concerns only, since the team has concluded that if the blanket dislodged during entry it would not be a debris source for the rudder speedbrake.

Team 4 has been working to develop a simple method for securing the blanket to its original position. The theory is that the blanket has a structural memory and will retain whatever position it is moved to. The preliminary EVA techniques access this area via the SRMS and WIF extension. The detailed EVA techniques and robotics will be provided as soon as the team completes their procedure review. Tomorrow the MMT will discuwill be added to EVA 3 on flight day 8 or EVA 4 on flight day 10.

SRB Quick look - Preliminary data review shows nominal SRB performance and no in-flight anomalies of the hardware have been identified. Visual inspection shows no major areas of concern and post flight hardware inspections are proceeding per the standard timeline. We expect to view the SRB video of the External Tank tomorrow at the MMT. All data obtained so far indicates that ET-124 performed extremely well.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free