SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-117 FD07 Execute Package

 
STATUS REPORT
Date Released: Thursday, June 14, 2007
Source: Johnson Space Center


image

Download full document

FD6 MMT Summary

The MMT met today and the main topics of discussion were the Port OMS Pod Blanket EVA repair, DAT results, and the ISS attitude control issues. The MMT did decide that EVA 3 would be used to secure the torn blanket if the MCC preparation and crew procedures could be safely completed which includes the onboard training and procedure review.

Port OMS Blanket Repair:

Team 4 briefed the MMT on the downselect options for the EVA blanket repair. This team has been working in conjunction with Orbiter Project and Engineering personnel regarding the best method to secure the torn blanket. Blanket pull tests utilizing the different attach methods were conducted last night and the best option to secure the blanket is to fold down the raised edge, staple it to the adjacent blanket, and then using the Saffil pins secure both blankets to the front row of edge tile. Arc Jet testing as well as wind tunnel testing are being conducted to verify this configuration. However, based on the pull tests, the team has confidence in this method to secure the blanket.

The MMT decision to conduct the blanket repair on EVA 3 was based on this repair being the highest priority for the remaining EVA’s. In addition, by completing the repair on EVA 3 the team would have time to respond with EVA 4 if an unknown problem arose in securing the blanket.

As always the Operations team will provide you with the EVA/Robotics details once they are finalized.

Imagery/Debris Assessment Team:

All TPS has been cleared with the exception of a section of Right Inboard elevon (RIB) tile. Due to the RIB elevon imagery being partially obscured by shadows during the RPM maneuver, the team can not conclusively clear this TPS, and as a result, may try and gather additional imagery during late inspection. There is extremely low concern from the team regarding these particular tiles.

Space Station Attitude Control:

The MMT was briefed on the current ISS attitude control issues and how this will affect the remainder of docked operations. Currently, the ISS does not have the ability to provide attitude control other than from the CMG’s. In order to prevent saturation of the CMG’s and use of Orbiter RCS propellant to maintain attitude control, water dumps will be moved to at least flight day 9. In addition, the MMT also asked the Operations team look at methods to preserve cryo margin to allow for an extra docked day if required.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 22, 2009 - Spring Bloom in the South Atlantic Ocean

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free