SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-117 Status Report #18 Sunday, June 17, 2007 - 7 a.m. CDT

 
STATUS REPORT
Date Released: Sunday, June 17, 2007
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

For the fourth time in less than a week, the astronauts on Space Shuttle Atlantis are about to venture outside their spacecraft to press ahead with assembly of the International Space Station.

The crew's wakeup call came at 6:38 a.m. CDT with the theme song from "Band of Brothers," played for Mission Specialist Jim Reilly.

Spacewalkers Patrick Forrester and Steven Swanson begin their second EVA of the flight at 11:33 a.m., with Reilly choreographing the excursion from the shuttle flight deck. Flight Engineer Oleg Kotov will shadow Reilly as intravehicular crewmember, training to take that role for an upcoming station spacewalk.

The first task is to retrieve a TV camera stand from a stowage platform attached to Quest and install it on the S3 truss. From there the spacewalkers will move to the intersection of the S3 and S4 trusses to prepare the Solar Alpha Rotary Joint for rotation. Forrester will verify the installation of a second Drive Lock Assembly, the machine that turns the S4 truss so its solar array wings can track the sun. He will then help Swanson remove the last six SARJ launch restraints to free the joint to turn.

To clear the path on S3 for the Mobile Base System, Forrester and Swanson will remove temporary rail stops and the hardware that secured the S3/S4 in the shuttle payload bay. Then, they will translate back to the body of the station for a few get-ahead tasks.

As time permits, the spacewalkers plan to install a computer network cable on the Unity node, remove a Global Positioning System antenna, tighten the gimbal locks on the S-band Antenna Support Assembly, open the hydrogen vent valve on the Destiny laboratory that was installed on Friday's spacewalk, and secure the orbital debris shield panel. Today's spacewalk is scheduled to conclude at 6:03 p.m.

The Russian central computer and terminal computers continue in stable operation, each running on two of its three channels with the third in standby. Mission Control in Moscow has restarted all Russian systems except the Elektron, which is receiving power but not moded to generate oxygen, and is planning to fire Russian attitude control thrusters in conjunction with a maneuver of the mated stack to a water dump attitude on Monday.

The next STS-117 status report will be issued Sunday evening after the spacewalk, or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 22, 2009 - Spring Bloom in the South Atlantic Ocean

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free