SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Processing Status Report 22 June 2007

 
STATUS REPORT
Date Released: Friday, June 22, 2007
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Official Launch Date: June 8, 2007
Official Landing Date: June 22, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Williams

The crew of STS-117 completed its nearly two-week mission to the International Space Station today, landing at Edwards Air Force Base at 3:49 p.m. EDT. The orbiter's wheels came to a stop after 13 days, 20 hours, 12 minutes and 44 seconds in space.

While docked at the station on Sunday, the crew completed a fourth and final spacewalk. During the outing, crewmembers Patrick Forrester and Steven Swanson moved a TV camera from a stowage platform to the S3 truss, verified the configuration of drive lock assembly No. 2, and removed the last six launch restraints from the solar array rotary joints. They also installed a computer network cable on the Unity node, opened the hydrogen vent valve on the Destiny laboratory, and tethered two orbital debris shield panels.

On Monday, the crew transferred supplies from Atlantis to the station. On Tuesday, Atlantis undocked and executed a fly-around of the station, sending back imagery of the new configuration of the solar arrays. The space station now has four U.S. solar array wings tracking the sun through each orbit of the Earth. Later in the day, the crew completed a survey of the orbiter's thermal protection system using the shuttle arm and boom extension.

At NASA's Dryden Flight Research Center at Edwards Air Force Base, Atlantis will be prepared for its ferry flight back to KSC that will occur in about one week.

Mission: STS-118 - 22nd International Space Station Flight (13A.1) - S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Aug. 9, 2007
Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew

Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2 this week, workers successfully completed the frequency response testing of the orbiter's flight control system. Pressurization of the nose landing gear and main landing gear struts has ended. Tile work around the payload bay door hinges is under way, and the main propulsion system valves have been configured for rollout. The forward external tank/orbiter yoke (attach point) has been installed. The shuttle main engine covers are installed, and the engines are ready for the vehicle's rollover to the Vehicle Assembly Building, currently scheduled for July 2.

In the Vehicle Assembly Building, transfer of External Tank No. 117 from its checkout cell to the mobile launch platform in high bay No. 1 was completed on Sunday. The hard mating of the external tank and solid rocket boosters was completed that evening. The shuttle interface test is under way, and other scheduled processing of the tank and booster stack continues.

Mission: STS-120 - 23rd International Space Station Flight (10A) - U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3, aft closeout work is under way. The orbiter docking mechanism has been stowed for flight. Checkout and servicing of water spray boiler No. 1 is scheduled for completion today. Modifications to Discovery's engine cutoff sensor wiring are complete, along with the installation of BRI tile around the main landing gear doors and external tank doors.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free