SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

Space Shuttle Processing Status 19 Mar 2001

 
STATUS REPORT
Date Released: Monday, March 19, 2001
Source: Kennedy Space Center


MISSION: STS-102 - 8th ISS Flight (5A.1) - Leonardo MPLM

VEHICLE: Discovery/OV-103
LOCATION: On orbit
OFFICIAL KSC LAUNCH DATE/TIME: Mar. 8, 2001 at 6:42:09:059 a.m. EST
TARGET KSC LANDING DATE/TIME: Mar. 21, 2001 at about 12:56 a.m.
MISSION DURATION: 12 days, 18 hours and 14 minutes
CREW: Wetherbee, Kelly, Thomas, Richards; (up) Voss, Helms, Usachev; (down) Shepherd, Gidzenko, Krikalev
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees

NOTE: Space Shuttle Discovery remains in excellent health following last night's successful undocking from the International Space Station. The flight crew begins deorbit preparations tomorrow while flight controllers assess weather conditions at KSC and the alternate landing sites. The current flight plan calls for the following Shuttle landing opportunities:

ORBIT SITE DEORBIT BURN (EST) LANDING (EST)

Wed.:

200 KSC 11:50 pm (Tues.) 12:56 am (Wed.)
201 KSC 1:26 am (Wed.) 2:31 am (Wed.)
202 *EDW 2:58 am (Wed.) 4:02 am (Wed.)
203 *EDW 4:35 am (Wed.) 5:38 am (Wed.)
*Only applicable if Edwards AFB, California is called up for landing support Thurs.:
216 KSC 12:24 am (Thurs.) 1:28 am (Thurs.)
217 EDW 1:55 am (Thurs.) 2:59 am (Thurs.)
KSC 2:01 am (Thurs.) 3:05 am (Thurs.)
218 EDW 3:31 am (Thurs.) 4:35 am (Thurs.)
219 EDW 5:08 am (Thurs.) 6:11 am (Thurs.)

The Wednesday morning weather forecast calls for scattered clouds at 4,000 feet and broken at 8,000 feet; visibility at 7 miles; winds from the southwest at 15 peaking to 20 knots; temperature at 58 degrees F., and chance of rain showers within 30 nautical miles of the Shuttle Landing Facility. Weather conditions will improve into Thursday, but clouds and precipitation may be of concern.

MISSION: STS-100 - 9th ISS Flight (6A) -Raffaello MPLM, SSRMS

VEHICLE: Endeavour/OV-105
LOCATION: Vehicle Assembly Building high bay 3
TARGET KSC LAUNCH DATE/TIME: Apr. 19, 2001 at 3:12 p.m. EDT
TARGET KSC LANDING DATE/TIME: Apr. 30, 2001 at 11:10 a.m.
MISSION DURATION: 11 days
CREW: Rominger, Ashby, Hadfield, Parazynski, Phillips, Guidoni, Lonchakov
ORBITAL INSERTION ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

Shuttle Processing Note: Shuttle orbiter Endeavour departed OPF bay 2 Saturday at about 9:26 a.m. headed for the VAB. Orbiter and external tank mating activities are under way and the Shuttle Interface Test will conclude on Wednesday. The full Space Shuttle stack is scheduled to roll out of VAB high bay 3 at 7 a.m. on Thursday, March 22, and should arrive at Launch Pad 39B by about 1 p.m.

MISSION: STS-104 - 10th ISS Flight (7A) - Airlock

VEHICLE: Atlantis/OV-104
LOCATION: OPF bay 3
KSC LAUNCH DATE/TIME: NET June 8, 6:50 p.m. EDT
KSC LANDING DATE/TIME: June 19, 2:24 p.m.
MISSION DURATION: 11 days
CREW: Lindsey, Hobaugh, Kavandi, Gernhardt, Reilly
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees

Shuttle Processing Note: Workers completed Shuttle main engine removal last Friday and checks of Atlantis' forward reaction control system concluded Saturday. Today, technicians are performing leak checks on the orbiter's flash evaporator system and installing a gaseous nitrogen tank in the orbiter's midbody. Orbital maneuvering system functional tests are scheduled this week as well.

COLUMBIA/OV-102 Post Ferry Processing

Orbiter Columbia remains in OPF bay 1 undergoing post ferry processing. Tail cone removal concluded Friday. Electronic components are being removed from the orbiter's avionics bays 5 and 6. Preparation continues for the removal of Columbia's simulated orbital maneuvering system pods. Columbia is scheduled to remain in OPF 1 through late April and then move to the VAB for storage until OPF bay 3 becomes available. Columbia's next flight is under review, but could occur as early as this fall.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free