SpaceRef Asia · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef Asia
Home | Calendar - News - Photo Gallery - Space Station Guide - Space Weather - Mars Today

(New) Collaborate on Space Projects at OnOrbit ColabSpace - Astrobiology Web - Space Elevator - Space Wire
STATUS REPORT
Date Released: Sunday, July 1, 2007
Source: Kennedy Space Center

NASA Space Shuttle Processing Status Report 29 June 2007

image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Official Launch Date: June 8, 2007
Official Landing Date: June 22, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Williams

At NASA's Dryden Flight Research Center at Edwards Air Force Base, Atlantis has undergone a week of preparation for its ferry flight back to KSC aboard the shuttle carrier aircraft. The SCA is a modified Boeing 747 airplane, which transports the orbiter in piggyback fashion. The first opportunity for the flight is Saturday and will be dependent on weather conditions across the country.

Mission: STS-118 - 22nd International Space Station Flight (13A.1) - S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Aug. 7, 2007
Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, Endeavour is undergoing final preparations for rollover to the Vehicle Assembly Building early on Monday morning, with orbiter mate to the transporter scheduled for Saturday. During the week, functional testing of the payload bay doors was completed, the doors have been closed for flight, and the strongbacks (metal structures that allow for the movement of the doors) have been removed. The main landing gear and nose landing gear tires are pressurized for flight. The forward, mid and aft sections of the orbiter are closed out for flight. The orbiter weight and center of gravity are being measured today.

In the Vehicle Assembly Building, processing of the STS-118 external tank and solid rocket boosters continues. This weekend, platforms will be configured for the orbiter mate.

Mission: STS-120 - 23rd International Space Station Flight (10A) - U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3, aft closeout work is under way. Checkout of the hydraulic system for water spray boiler No. 1 is complete and good. Testing of the auxiliary power units is under way. Testing of the external tank doors for proper closure and fit is also under way.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

advertisment


Home | Calendar - Gallery - Space Station
SpaceRef Canada - SpaceRef Europe - SpaceRef USA - Astrobiology Web - Mars Today - Space Elevator - Nano2Sol

Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy