SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Processing Status Report 20 July 2007

 
STATUS REPORT
Date Released: Monday, July 23, 2007
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-118 - 22nd International Space Station Flight - S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Launch Pad 39A
Launch Date: Targeted for Aug. 7, 2007
Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At Launch Pad 39A, preparations continue for the launch of Endeavour on STS-118.

The orbiter's payload was installed on July 15. The helium signature test, which checks for leaks in the main propulsion system, is complete. Technicians continue checking out the shuttle systems after finishing the external tank and solid rocket booster camera tests. Work is under way to prepare for the loading of hypergolic propellants, which will begin July 23. These propellants will power the solid rocket booster hydraulic power units and Endeavour's orbital maneuvering system, forward reaction control system and auxiliary power units.

Workers continue filling the liquid oxygen and liquid hydrogen storage tanks at the pad. This fuel will be transferred to the external fuel tank shortly before launch. Mating of the orbiter midbody umbilical unit, the connection point that allows for servicing of the orbiter's fuel cells, will be completed today.

The STS-118 crew traveled to Kennedy Space Center this week to participate in the terminal countdown demonstration test, which includes a countdown dress rehearsal, emergency egress training and a checkout of the crew cabin configuration.

Mission: STS-120 - 23rd International Space Station Flight - U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3, Discovery's main engines No. 1 and 2 have been installed, as have the heat shields for those engines. Engine cutoff sensor system and payload premate testing are complete. Rigging of the latching mechanism for the orbiter boom sensor system is complete and the system has been installed for flight.

Stacking of the STS-120 solid rocket boosters in the Vehicle Assembly Building began this week, with the left aft booster and left aft center segments delivered and mated to the mobile launch platform.

Mission: STS-122 - 24th International Space Station Flight - Columbus Laboratory Module
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1
Launch Date: Targeted for Dec. 6, 2007
Launch Pad: 39A
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 1, the orbiter's dome heat shields and main engines have been removed. The checkout of the forward reaction control system is complete. Windows No. 5 and 6 were removed and replaced. The orbiter boom sensor system has been removed and inspected, with reinstallation set for next week.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free