SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Phoenix Mars Lander Status Report: Radar and Other Gear Pass Checkouts

 
STATUS REPORT
Date Released: Thursday, September 6, 2007
Source: Jet Propulsion Laboratory


image

Two crucial tools for a successful landing of America's latest mission to Mars, the radar and UHF radio on NASA's Phoenix Mars Lander, have passed in-flight checkouts.

The ultra-high-frequency radio won't be turned on again until landing day, May 25, 2008, when it will relay communications from Phoenix to orbiters already in service around Mars. Since launch on Aug. 4, 2007, and until the day it reaches Mars, Phoenix is communicating directly with Earth via even higher frequency X-band radio, mounted on a part of the spacecraft that will be jettisoned shortly before Phoenix hits the top of the Martian atmosphere.

The radar will monitor the spacecraft's fast-shrinking distance to the ground during the final three minutes before touchdown on Mars, triggering descent-engine firings and other necessary events during the most challenging moments of the mission. The Phoenix flight operations team tested the radar and UHF radio on Aug. 24. Four days earlier, the team ran the first in-flight checkout of a Phoenix science instrument. This test focused on the Thermal and Evolved-Gas Analyzer, which will check for water, carbon-containing molecules and other chemicals of interest in the icy soil of Mars. The checkout verified the health of an ion pump, which will be used during the transit to Mars to remove most water vapor carried from Earth with the instrument. Four additional science instruments are scheduled for checkouts before the spacecraft's next trajectory correction maneuver, planned for Oct. 16.

As of Sept. 1, Phoenix will have covered 81 million kilometers (50 million miles) of its 679-million kilometer (422-million-mile) flight to Mars. It is traveling at 34 kilometers per second (76,000 mph) in relation to the sun. Meanwhile, careful preparations continue for the white-knuckle minutes before landing and the potential scientific discoveries at the landing site.

"Everything is going as planned. No surprises, but this is one of those times when boring is good," said Barry Goldstein, Phoenix project manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif. division of the California Institute of Technology in Pasadena.

Additional information on Phoenix is available online at: http://www.nasa.gov/phoenix and at http://phoenix.lpl.arizona.edu. Additional information on NASA's Mars program is available online at: http://www.nasa.gov/mars.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free