NASA Space Shuttle Processing Status Report 5 October 2007

 
STATUS REPORT
Date Released: Friday, October 5, 2007
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-120 - 23rd International Space Station Flight - U.S. Node 2 (Harmony)
Vehicle: Discovery (OV-103)
Location: Launch Pad 39A
Launch Date: Targeted for Oct. 23, 2007
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

On Sunday, STS-120 was transported via the crawler transporter to Launch Pad 39A. The rotating service structure, which protects and provides access to the orbiter at the pad, was rolled into position on Monday. During the week, workers performed shuttle interface testing, orbiter/external tank leak checks and launch pad validations. The payload was installed in the orbiter on Thursday, and the sensor packs were installed on the orbiter boom sensor system.

Loading of hypergolic propellants aboard Discovery is scheduled for this weekend. Next week, the terminal countdown demonstration test is scheduled with the STS-120 astronauts and the launch team. This routine series of events includes emergency training procedures and a launch countdown dress rehearsal.

After the hail monitoring system at the pad showed possible hail in the predawn hours of Wednesday, engineers fully inspected the space shuttle but found no damage. There were no radar indications of hail, though wind-driven rain may have been possible. The calibration of the hail monitoring system sensors and associated instrumentation is being assessed.

Mission: STS-122 - 24th International Space Station Flight - Columbus Module
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1
Launch Date: Targeted for Dec. 6, 2007
Launch Pad: 39A
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility Bay No. 1, workers are installing the main engine heat shields. Engine integrated testing and mate operations are complete. Technicians have also completed checkout of the water spray boiler system. Functional checkout of the external tank doors is finished. Midbody closeout and inspection work continues, with final payload bay door closure scheduled for next week.

In the Vehicle Assembly Building, processing continues on ET-125, the external fuel tank for the STS-122 mission, including repairs to the liquid oxygen feedline support bracket foam. In high bay No. 3, stacking of the solid rocket boosters is under way. The right forward center booster segment was lifted into the high bay Thursday, and the left forward center segment will be transferred to the assembly building and lifted to the stack today and Saturday.

Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Feb. 14, 2008
Launch Pad: 39A
Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman and Reisman
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, servicing of Freon coolant loop No. 1 is complete. Windows No. 3 and 4 were removed and replaced. Technicians continue inspecting the main propulsion system flow liners, feedlines and gimbal joints. The fuel cell single-cell voltage test is finished. Preparations for installation of BRI tile around the main landing gear doors are under way. The BRI tile is a stronger tile designed for critical areas on the orbiter. Work is in progress to configure Endeavour's payload bay for the STS-123 hardware.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free