SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Processing Status Report 12 October 2007

 
STATUS REPORT
Date Released: Friday, October 12, 2007
Source: Kennedy Space Center


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-120 - 23rd International Space Station Flight - U.S. Node 2 (Harmony)
Vehicle: Discovery (OV-103)
Location: Launch Pad 39A
Launch Date: Targeted for Oct. 23, 2007
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At Launch Pad 39A, the hypergolic propellants have been loaded into the solid rocket booster hydraulic power units, as well as into Discovery's orbital maneuvering system, forward reaction control system and auxiliary power units. On Thursday, the rotating service structure at the pad was rotated away from Discovery to allow for the auxiliary power unit hotfire, which was successfully completed. The rotating service structure was returned to the mate position later that day. Orbiter aft closeout work begins today.

On Sunday, the STS-120 crew arrived at Kennedy Space Center for the terminal countdown demonstration test, which involves a launch dress rehearsal. Crew activities included practicing emergency egress operations at the pad, reviewing the payload bay configuration, and suiting up and climbing into the crew cabin of the orbiter to run through the prelaunch checklist.

On Tuesday and Wednesday, a program-level flight readiness review was held at Kennedy. Space Shuttle Program managers concluded the review with a recommendation to proceed toward a targeted launch on Oct. 23. An agency-level review will take place on Oct. 16 at Kennedy, where an official launch date will be decided.

Mission: STS-122 - 24th International Space Station Flight - Columbus Module
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1
Launch Date: Targeted for Dec. 6, 2007
Launch Pad: 39A
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility Bay No. 1, midbody closeout and inspection work is complete and the payload bay doors were closed for rollover. Workers continue to close out and inspect the forward and aft sections. The landing gear functional test was successfully performed.

In the Vehicle Assembly Building, processing continues on ET-125, the external fuel tank for mission STS-122. Repairs to the liquid oxygen feedline support bracket foam are complete and access platforms are being removed. In high bay No. 3, stacking of the solid rocket boosters is finished.

Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Feb. 14, 2008
Launch Pad: 39A
Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman and Reisman
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, window No. 1 was removed and replaced this week, and the removal and replacement of window No. 6 is in progress. The external airlock upper hatch functional test is complete.

Technicians continue to inspect the main propulsion system flow liners, feedlines and gimbal joints. Preparations for installation of BRI tile around the main landing gear doors continue. The BRI tile is a stronger tile designed for critical areas on the orbiter. Work is under way to configure the payload bay for the STS-123 cargo.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free