SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-120 Report #15 1 a.m. CDT Tuesday, Oct. 30, 2007

 
STATUS REPORT
Date Released: Tuesday, October 30, 2007
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

HOUSTON ' Astronauts Scott Parazynski and Doug Wheelock today install the International Space Station's P6 truss in its final location. A new task was also added to this third spacewalk of the mission to provide comparison data of the station's two solar array rotary joints. The spacewalk is set to begin at 3:53 a.m. CDT.

Today's wakeup music at 11:38 p.m., 'Malaguena Salerosa' by Chingon, was played for Pilot George Zamka, who will be operating the shuttle robotic arm.

After analyzing photos of debris found inside the station's starboard Solar Alpha Rotary Joint, mission managers decided Parazynski should take time near the end of the spacewalk to inspect the port rotary joint to provide a comparison. The joints rotate the solar arrays to track the sun for electrical power generation. Parazynski will take photographs and samples of any debris he finds for evaluation.

On Monday managers also decided to devote the mission's fourth spacewalk on Thursday to additional inspection of the starboard joint. That joint has been experiencing increased friction during rotation for the past month and a half and station operators have limited its use while the situation is assessed.

The fourth spacewalk originally was to test a shuttle tile repair dispensing 'gun' known as the T-RAD. That test has been deferred to a future shuttle mission.

During today's spacewalk, Parazynski and Wheelock will work at the end of the port truss to help station robotic arm operators attach the P6 to its new location on P5. The two will provide verbal cues to Expedition 16 Flight Engineer Dan Tani and Mission Specialist Stephanie Wilson as they align the truss.

Once the 17.5 ton truss is in place, Wheelock will secure it with the mechanical capture claw so the two can install the bolts that will permanently hold it and then attach its power source.

Next, the spacewalkers will remove thermal shrouds on P6 and configure the P6 radiator for deployment by ground controllers. Wheelock will also install a spare main bus switching unit on a station storage platform. Zamka and Wilson will operate the shuttle robotic arm during this hardware transfer task.

Following the spacewalk the giant solar array wings on P6 will be redeployed so they can begin gathering sunlight for power again.

The next STS-120 status report will be issued Tuesday afternoon or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free