NASA ISS On-Orbit Status 2 November 2007

 
STATUS REPORT
Date Released: Friday, November 2, 2007
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Day 148 for Clayton Anderson. Flight Day 11 for STS-120/10A; Day 9 of Joint Ops.

ISS/Shuttle crew wake-up: 1:08am EDT. Sleeptime: 5:08pm (ISS), 5:38pm (Shuttle).

After crew wake-up, onboard activities moved briskly in continuation of preparations for tomorrow's EVA-4 (see Note below). [EMU (Extravehicular Mobility Unit) suit and EVA tool configuration were completed, as well as almost all hazard assessments. The SSRMS (Space Station Remote Manipulator System) grappled and handed off the OBSS (Orbiter Boom Sensor System) extension arm to the SRMS (Shuttle RMS) for overnight parking, after completing the necessary MT (Mobile Transporter) translations from WS8 (Worksite 8) to WS3 and back.

FE-2 Clay Anderson started his day with the IWIS (Internal Wireless Instrumentation System, first transferring the recorded data of the last IWIS structural dynamics data take (during P6 berthing) from the standard four RSUs (Remote Sensor Units) in Lab, Node, FGB & SM (Service Module) to the FS (File Server) laptop. The RSUs were then reset (programmed) for the next data take, later in the morning for Doug Wheelock's workout on the Shuttle ergometer at ~5:50am EDT. [The second Lab RSU with accelerometer for recording the Shuttle exercise is currently located near the Orbiter's cycle ergometer on the middeck.]

FE-1 Yuri Malenchenko had ~2.5 hrs scheduled for the periodic/long-term inspection of the pressure hull in the SM Working Compartment (RO), looking for any moisture, deposits, mold, corrosion and pitting behind panels 130, 134, 135, 138, 139 and underneath the TVIS treadmill.

Continuing the current round of the regular monthly preventive maintenance of RS (Russian Segment) ventilation systems, Yuri also spent time in the FGB cleaning interior panel ventilation grilles.

Additionally, Malenchenko conducted the regular task (currently daily) of checkout/verification of IP-1 airflow sensors in the various RS hatchways, including the SM- & FGB-to-Soyuz tunnels, the DC1-to-Progress and FGB-to-Node-1 passageway (this is especially important when the ventilation/circulation system has to cope with a larger crew on board, currently ten persons).

CDR Whitson worked on the UOP-6 (Utility Outlet Panel 6) PS-120 Junction Box on reconfigurations for the LAN (Local Area Network) for Node-2 integration. [Tasks included adding a mass storage cable (W-cable) to PS(Power Strip)-120, switching HRF (Human Research Facility) laptop power from HRF-1 to the W-cable, and configuring the ER5 (EXPRESS Rack 5) laptop with a PS-28 connection from the HRF-PC.]

Continuing Node-2 outfitting for ~2.5 hrs, the CDR and Clay Anderson installed the cabling for the ISL (Integrated Station LAN) Router, to be strung and connected to the ISL later this month after Node-2 relocation to the Lab front end.

In Node-1/Unity, Peggy also inspected and cleaned the FDS (Fire Detection & Suppression) system's bacteria filter und SDs (smoke detectors). [There are a total of two SD units in Node-1 (NOD1D3-1 & NOD1D3-03). Inspection included the Kapton tape at the rear of vacuum for damage or wear. If repair was necessary, photo documentation was required.]

On the IATCS (Internal Active Thermal Control System in the Lab, the FE-2 disconnected the AmiA (Antimicrobial Applicator), relieved the pressure in its canister and stowed AmiA for return. Afterwards, Clayton removed low-flow jumpers from ITCS locations, performed a flush and took an OPA (Ortho-Phthalaldehyde) sample for return on the Shuttle. [AmiA introduced OPA, an antimicrobial agent, into the Lab IATCS coolant fluid. An NH 3 (ammonia) sample was not required.]

 

Yuri performed the routine servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.  Weekly SOZh reports (on Sundays) to TsUP/Moscow deal with number & dates of water and urine containers, counter readings of water consumption & urine collection, and total operating time of the POTOK air filtration system.]

Clay later worked on the IMS (Inventory Management System), updating/editing its standard "delta file", including locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur).

Malenchenko again had about 60 minutes for general crew orientation (station familiarization & acclimatization), as is standard daily rule for the first two weeks after starting station residency.

In preparation for tomorrow's EVA, the CDR set up two DCS-760 digital camera batteries for recharge in the Battery Charger in the Airlock (A/L).

At ~2:50am EDT, the FE-1 downlinked two PAO TV messages of greetings during VHF comm passes over RGS (Russian Ground Site) to TsUP/Moscow, one to a much-valued member of the Moscow Region Administration, the other to the Balashiha Military Prosecutor's Office on the 25 th Anniversary of its formation.

ISS crewmembers completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (FE-1, FE-2/full-time), RED resistive exerciser (CDR, FE-1)and VELO bike with bungee cord load trainer (FE-1).

Afterwards, Peggy transferred the crewmembers' exercise data files to the MEC (Medical Equipment Computer) for downlink, as well as the daily wristband HRM (Heart Rate Monitor) data, followed by their erasure on the HRM storage medium (done six times a week).

After completing A/L EL (Equipment Lock) configuration for the 4 th spacewalk tomorrow and conducting several extensive reviews and teleconferences of EVA-4 timeline, procedures, hazard avoidance, etc. with all crewmembers and ground specialists, the two spacewalkers, Scott Parazynski (EV1) and Doug Wheelock (EV2), will begin their "campout" in the "Quest" A/L, starting mask prebreathe at ~3:53pm, then closing hatches and initiating depressurization of the CL (Crewlock) from 14.7 to 10.2 psi.   Sleep for the ISS crew begins at 5:08pm, for the Shuttle crew at ~5:38pm.

EVA-4 Overview: Primary focus of Scott & Wheels' outside venture will be inspection and repair of the torn P6 Solar Array Wing (SAW). Afterwards, if certain criteria are satisfied (see below), EV1 & EV2 will get out of the way and monitor the deployment of the wing. Subsequent get-ahead tasks include retrieval of two APFRs (Articulating Portable Foot Restraints, #3 & #7) for inspection, if time available and room in Airlock, mating of a PDGF (Power & Data Grapple Fixture) "horseshoe" connector at Node-2, and installation of the Node 2 HR (hand rail) #371 that was deferred from EVA-2. After the regular overnight Campout by the spacewalkers for denitrogenation/pre-breathe, egress is expected around 6:35am EDT tomorrow morning. EVA duration will again be about 6.5 hrs. [Repair Concept: There are two damaged areas on the SAW 4B inboard blanket: a large rip from the hinge between array segments ("bays") 35 & 36, and a small gap between bays 37 & 38. To stabilize the blanket in those areas, the affected bays will be "stitched" across the respective hinges (35/36 & 37/38) with five jerry-rigged wire clamps similar to dress shirt cufflinks, utilizing existing pin holes for inserting the cufflink anchors and requiring one-side access only. Because of the location of the pin holes, each of the "stitches" fortunately will run along spine-like rigidizing lines, called "stiffeners". Criteria for going ahead with the subsequent deployment of the 4B Array Mast include:

  • Snag on 4B right blanket eliminated;
  • Array electrically safed by hinge wire being cut & end secured;
  • Five stabilizers installed across hinge (priority from inboard to outboard);
  • Guide wire cleared from creating additional hazards (grommet snag, FOD, free float); and
  • Low tension mode during deployment visually confirmed and blanket stability monitored after each one-half bay deploy (i.e., stabilizers remaining in place, blanket deploying symmetrically, no additional snags, etc.).

Why 4B Panel Repair is required:

  • Array is believed to be stable for the near term;
  • However, it needs to be able to take loads over the long term;
  • Right now, about 3 feet of the 15-ft long hinge are missing, which is designed to distribute a load of ~70 lbs across it, i.e. there is a load concentration;
  • Therefore, the blanket could tear further over time;
  • If the blanket tears too much, the array cannot be stabilized and would have to be jettisoned (loss of ~20 kW of power);
  • Thus, P6 deployment is the number one priority for the rest of the mission.

No CEO (Crew Earth Observations) target uplinked for today.

CEO photography can be viewed and studied at the websites:

http://eol.jsc.nasa.gov  (about 700,000 NASA digital photographs of Earth are downloaded by the public each month from this "Gateway" site);

http://earthobservatory.nasa.gov/

http://earthobservatory.nasa.gov/Study/AstronautPhotography

ISS Orbit  (as of this morning, 7:38am EDT [= epoch]):

Mean altitude -- 342.2 km

Apogee height -- 344.5 km

Perigee height -- 339.8 km

Period -- 91.38 min.

Inclination (to Equator) -- 51.64 deg

Eccentricity -- 0.0003515

Solar Beta Angle -- -62.8 deg (magnitude decreasing)

Orbits per 24-hr. day -- 15.76

Mean altitude loss in the last 24 hours -- 145 m

Revolutions since FGB/Zarya launch (Nov. 98) -- 51259

Significant Events Ahead(all dates Eastern, some changes possible. Also: Stage 10A is under reassessment):

11/03/07 (FD11) -- EVA-4 (Parazynski/Wheelock) ~6:35am EDT

11/04/07 -- 50-Year Anniversary of launch of female dog Laika, first living space passenger, into orbit

11/04/07 -- 2:00am: DST ends, ST begins

11/05/07 -- STS-120/Discovery/10A undocking (FD14/5:32am)

11/07/07 -- STS-120/Discovery/10A deorbit burn (FD16/10:44am EST

11/07/07 -- STS-120/Discovery/10A landing @ KSC (FD16/11:44am EST)

TBD -- relocation to Node 2 (PMA-2 umbilicals stowed on 10A EVA-4)  

TBD   -- Node 2 (Harmony) plus PMA-2 relocation to front of Lab   

11/14/07 -- US EVA-10

11/18/07 -- US EVA-11

12/06/07 -- STS-122/Atlantis/1E launch -- Columbus Module, ICC-Lite (NET)

12/08/07 -- STS-122/Atlantis/1E docking

12/15/07 -- STS-122/Atlantis undocking

12/18/07 -- STS-122/Atlantis landing

12/22/07 -- Progress M-61/26P undocking (DC1) & reentry

12/23/07 -- Progress M-62/27P launch

12/25/07 -- Progress M-62/27P docking (DC1)

01/31/08 -- ATV-1 "Jules Verne" launch/Ariane V (Kourou, French Guyana)

01/31/08 -- 50-Year Anniversary of Explorer 1 (1 st U.S. satellite on Redstone rocket)

02/06/08 - Progress M-62/27P undocking

02/07/08 -- Progress M-63/28P launch

02/09/08 -- Progress M-63/28P docking

02/14/08 -- ATV-1 docking (SM aft port)

02/14/08 -- STS-123/Endeavour/1J/A launch/1J/A --  SLP-SPDM, JEM ELM-PS (NET)

02/16/08 -- STS-123/Endeavour/1J/A docking

02/27/08 -- STS-123/Endeavour undocking

02/29/08 -- STS-123/Endeavour landing

04/08/08 -- Soyuz TMA-12/16S launch

04/10/08 -- Soyuz TMA-12/16S docking (DC1)

04/19/08 -- Soyuz TMA-11/15S undocking (FGB nadir port)          

04/23/08 -- Soyuz TMA-12/16S relocation (from DC1 to FGB nadir port)

04/24/08 -- STS-124/Discovery/1J launch - JEM PM "Kibo", racks, RMS.

04/26/08 -- STS-124/Discovery/1J docking

05/02/08 -- STS-124/Discovery/1J undocking

05/14/08 -- Progress M-64/29P launch

05/16/08 -- Progress M-64/29P docking (DC1)

07/29/08 -- ATV-1 undocking (from SM aft port)

08/11/08 -- Progress M-64/29P undocking (from DC1)

08/12/08 -- Progress M-65/30P launch

08/14/08 -- Progress M-65/30P docking (SM aft port)

09/13/08 -- Progress M-66/31P launch

09/15/08 -- Progress M-66/31P docking (DC1)

09/20/08 -- (NET) STS-126/Discovery/ULF2 launch - MPLM(P), LMC

10/01/08 -- (NET) STS-126/Discovery/ULF2 undocking.

10/11/08 -- Progress M-65/30P undocking (from SM aft port)

10/14/08 -- Soyuz TMA-13/17S launch

10/16/08 -- Soyuz TMA-13/17S docking (SM aft port)

04/??/09 -- Six-person crew on ISS

04/15/09 -- Constellation's Ares I-X Launch.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free