SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-120 Report #22 Friday, Nov. 2, 2007 - 5 p.m. CDT

 
STATUS REPORT
Date Released: Friday, November 2, 2007
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

HOUSTON - Space shuttle Discovery and International Space Station crewmembers today finished preparations for Saturday's spacewalk to repair a torn solar array. The mission's fourth spacewalk is set to begin about 5:30 a.m.

The astronauts spent the day positioning the station's mobile transporter and robotic arm at the end of the truss where it will serve as a base and “cherry picker” providing ample reach for the work to free a snag in a solar array panel.

As Mission Specialists Scott Parazynski and Doug Wheelock studied detailed plans for the spacewalk, other crew members assisted by insulating tools with Kapton tape to protect against any electrical currents.

Late in the crew day, the crew reviewed the procedures with Mission Control prior to going to bed. Parazynski and Wheelock will spend the night in the Quest airlock to prepare for the spacewalk focusing on the solar array repair.

As with other spacewalks during the mission, Saturday's could begin early depending entirely on the crew's final preparations that begin shortly after waking up at 12:38 a.m. Saturday.

The 6 1/2 -hour spacewalk begins with Parazynski riding the robotic arm up to the damaged area of the array. He will be secured in a foot restraint on the end of the Orbiter Boom and Sensor System - the extension to the shuttle robot arm used for inspection of the orbiter's thermal protection system.

Though this will be the first operational use of the OBSS to reach a worksite, the task was demonstrated during a spacewalk on the STS-121 mission in July 2006 to prove the boom could provide a stable environment for this type of work.

As Parazynski installs homemade stabilizers and releases the snag suspected of causing the tear in the array panel, Wheelock will assist from the base of the solar array. The distance from the station's center is about 165 feet out on the truss and approximately 90 feet up to the damaged site.

If all goes as planned, the crew inside will then deploy the array half a bay at a time while Parazynski watches for any new complications. The spacewalk is scheduled to wrap up about Noon.

The astronauts should then be able to spend Sunday preparing to leave the station with Discovery's undocking scheduled early Monday morning. Landing is set for just after Noon on Wednesday.

The next STS-120 status report will be issued Saturday morning or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- March Storm 2010 update

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA STS-129 Report #10 Saturday, November 21, 2009 - 3:30 a.m. CST

NASA ISS On-Orbit Status 20 November 2009

NASA STS-129 Report #09 5 p.m. CST Friday, Nov. 20, 2009

NASA STS-129 Report #08 Friday, November 20, 2009 - 4:00 a.m. CST

NASA ISS On-Orbit Status 19 November 2009

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free