SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-120 Report #24 Saturday, Nov. 3, 2007 - 4 p.m. CDT

 
STATUS REPORT
Date Released: Saturday, November 3, 2007
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

HOUSTON – With a few pieces of aluminum and a little bit of wire, Mission Specialist Scott Parazynski today repaired a damaged solar array during a spacewalk that lasted 7 hours, 19 minutes.

Parazynski and fellow spacewalker Doug Wheelock left the International Space Station at 5:03 a.m., and spent about an hour and a half riding the station's robotic arm out to the torn array – about 165 feet down the station's truss and 90 feet up to the damage.

Once there, Parazynski cut a snagged wire and installed homemade stabilizers designed to strengthen the array's structure and stability in the vicinity of the damage. Wheelock helped from the truss by keeping an eye on the distance between Parazynski and the array.

They completed the repair just after 10 a.m., and then stood back to watch for complications as flight controllers on the ground finished the deploy, which began on Tuesday. The delicate deploy sequence called for the array mast to be deployed one half bay at a time. Fifteen minutes and 13 computer commands later, the array was fully extended.

“One of the most satisfying days that I've ever had in Mission Control,” Derek Hassman, lead station flight director, said of the operation.

Parazynski and Wheelock then made their way back to the station's airlock, to end the spacewalk at 12:22 p.m.

The array repair became the priority of space shuttle Discovery's mission on Tuesday, after two tears were noticed during the array's unfurling. Teams on the ground worked around the clock to develop a plan for the repair, and the crew spent much of the past two days studying and making tools.

With that task behind them, the shuttle's crew will prepare to leave the station. They'll complete final transfer work, say their farewells, and close the hatch between the shuttle and the station at 12:43 p.m. CST Sunday.

Monday will be another busy day with undocking scheduled for 4:32 a.m. followed by a fly around of the station and an inspection of the shuttle's heat shield.

The next STS-120 status report will be issued Sunday morning or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 22, 2009 - Spring Bloom in the South Atlantic Ocean

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free