NASA ISS On-Orbit Status 22 November 2007

 
STATUS REPORT
Date Released: Friday, November 23, 2007
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Happy Thanksgiving on Earth & in Heaven (and in between)!

CDR Whitson & FE-1 Malenchenko started off on today's light-duty schedule with another standard 30-min Shuttle RPM (R-bar Pitch Maneuver) skill training, Peggy's third, Yuri's fourth, using DCS-760 digital still cameras with 400 & 800mm lenses at Service Module (SM) windows 6 & 8 to take imagery of documented EO (Earth Observation) targets facing the velocity vector (i.e., in flight direction). Afterwards, Peggy downlinked the obtained images to the ground for analysis, to be discussed at a subsequent tagup. [The skill training prepares crewmembers for the bottomside mapping of the Orbiter at the arrival of STS-122/1E in December. During the RPM at ~600 ft from the station, the ISS crew will have only ~90 seconds for taking high-resolution digital photographs of all tile areas and door seals on the Atlantis from SM windows 6 & 8, to be downlinked for launch debris assessment. Thus, time available for the shooting will be very limited, requiring great coordination between the two headset-equipped photographers and the Shuttle.]

Afterwards, the FE-1 continued the current round of periodic preventive maintenance of cabin ventilation systems in the RS (Russian Segment), today cleaning "Group A" fan grilles in the SM.

The CDR conducted the weekly 10-min. CWC (Contingency Water Container) audit as part of the continuing WDS (Water Delivery System) assessment of onboard water supplies. [Updated "cue cards" based on the crew's water calldowns are sent up every other week. Analysis of samples of water transferred in CWCs from Discovery to ISS during 10A confirmed bacterial contamination in all containers transferred. Currently off-limit for crew use until further word are two CWCs with potable water and nine CWCs with technical water. Background: The identified contaminant, a common soil bacterium (unicellular organism) called Wautersia after Belgian microbiologist Georges Wauters, is no more critical than what is found often in faucet water on the ground or in farm soil. Wautersia lives off hydrogen & carbon dioxide, oxidizing H2 and producing oxyhydrogen as energy for itself. Since it can turn sugar into a synthetic biodegradable fuel, it was seen for a short while as a promising long-term solution to the petroleum dependency, until it became clear that it would require gigantic amounts of expensive sugar.]

The FE-2 performed his fourth ICEPAC insertion in the MELFI (Minus Eighty-Degree Laboratory Freezer for ISS), retrieving two more -32 degC ICEPAC belts from stowage and placing them in Dewar 2/Tray B/Section 1 & Tray A/Section 4. [The reason the crew is performing several ICEPAC insertions this week is because the amount of warm mass that can be placed in a dewar at one time is limited. These activities are in preparation for the next Cold Bag packing, planned for STS-122/1E.]

In the SM, Malenchenko conducted his first periodic repositioning of the ESA/RSC-Energia experiment ALTCRISS (Alteino Long Term monitoring of Cosmic Rays on the ISS) by changing the position of its AST spectrometer on panel 437 (90 deg rotation in its place to face in the Z- or upward direction) and swapping the AST's PCMCIA (Portable Computer Memory Card International Adapter) storage card #936 with #937. The activity was photo-recorded, with imagery downlinked afterwards. [ALTCRISS uses the AST spectrometer to monitor space radiation in the Russian segment (RS).]

Continuing their preparations for the next spacewalk, EVA-12 "Charlie" on 11/24 (Saturday), EV1 Peggy Whitson & EV2 Dan Tani worked in the U.S. Airlock (A/L) where they –

  • Readied EVA tools (including checking a tether for EV2),
  • Recharged the EMU backpacks with water (EMU #3006 got a full water tank dump & recharge; #3018 had only its water supply recharged),
  • Reviewed uplinked updated procedural material for the spacewalk (some tasks, including get-aheads, were added since yesterday, see below),
  • Terminated regeneration of METOX (Metal Oxide) canister #0015 & #0019 in the A/L bakeout oven and started the process on canisters #0020 & #0021 [the A/L, currently Dan Tani's sleeping quarters, is staying within allowable ppCO2 (Carbon Dioxide Partial Pressure) limits for Dan's sleeptime], and
  • Terminated BSA (Battery Stowage Assembly) recharging of the EMU batteries used in EVA "Bravo".

[Background: The regenerable METOX absorbers of CO2 are currently not used in the EMUs but in the A/L during tomorrow night's "Campout" lockout of Peggy & Dan. During their spacewalk, CO2 scrubbing in the EMUs will be handled by LiOH (Lithium Hydroxide) canisters, with more "lifetime" than METOX cans, to protect against possible timeline extension of EVA "Charlie" that - like EVA "Bravo" - is considered a "full" EVA. This means that all timeline content needs to be done in one EVA due to Node-2 Thermal Loop System shutdown timing. Also, working with ammonia (NH3) fluid couplings could require additional time for decontamination procedures.]

FE-1 Malenchenko completed the daily routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including ASU toilet facilities systems/replaceables.

Yuri's daily maintenance of the IMS (Inventory Management System), updating/editing its standard "delta file", including locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur) today was a voluntary item on his "time permitting" discretionary task list.

The FE-1 used the SKDS CMS (Pressure Control & Atmosphere Monitoring System/Countermeasure System) to take the periodic readings of potentially harmful contaminants in the SM. The hardware was then returned to initial stowage. [The CMS, part of the Russian GANK-4M atmospheric analysis suite, uses preprogrammed microchips to measure Formaldehyde (H2CO, methanal), Carbon Monoxide (CO) and Ammonia (NH3), taking one measurement per microchip.]

The crewmembers completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (CDR, FE-2), TVIS treadmill (FE-1), RED resistive exerciser (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

Afterwards, Dan transferred the crew's exercise data file to the MEC (Medical Equipment Computer) laptop for downlink, including the daily wristband HRM (Heart Rate Monitor) data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

At ~3:35pm, the FE-2 is scheduled for another PFC (Private Family Conference) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on the SSC-9 laptop).

Task items waiting for Whitson & Tani on their discretionary U.S. "job jar" list include -

  • Work on BCAT-3 (Binary Colloidal Alloy Test-3, specifically remove samples from the CGBA-4 (Commercial Generic Bioprocessing Apparatus-4) & unstick the mixing magnet, with photography;
  • Relocating, in Node-2, the PS-120 (Power Strip) Junction Box from UOP-1 (Utility Outlet Panel 1) to the failed UOP-2; and
  • Starting U.S. trash gathering for disposal in Progress M-61/26P, aided by an uplinked preliminary (pre-E1) list of items.

EVA-12 "Charlie" Preview [Update 11/22]: EVA-12 on Saturday begins nominally at ~5:00AM EST, probably much earlier real-time (knowing Peggy), with a 6h 30m timeline. Dedicated to Part 2 of Node-2 outfitting (i.e., connecting & configuring the second half of Harmony's fluid, power and cooling jumpers), its objectives are for Peggy Whitson & Dan Tani to:

  • Remove the S0 truss NH3 (ammonia) shunt jumper on Port;
  • Configure vent tools;
  • Remove Node-2 fluid QD (quick disconnect) caps;
  • Vent & stow the Port NH3 shunt jumper;
  • Relocate an APFR (Articulating Portable Foot Restraint) from Lab WIF-11 (Worksite Interface Fixture 11) to Lab WIF-12;
  • Relocate Node-2 Loop B fluid tray to the Lab & attach it;
  • Deploy Node-2 Loop B fluid tray hinged section;
  • Mate S0 fluid QDs, then open S0 valves and 2 fluid QDs;
  • Connect two Node-2 fluid line heater cables;
  • Connect five Node-2 Stbd avionics cables to Node-2;
  • Release Node-2 Stbd CBM (Common Berthing Mechanism) petal launch locks (8 latches);
  • Mate remaining SSPTS umbilical (connector J16A) to PMA-2 (connector; P16) [New]
  • Install Lab/Node-2 gap spanner on two handrails (Lab & Node 2); and (as get-ahead)
  • Release Node-2 Port CBM petal launch locks (8 latches). [Nadir CBM launch locks remain closed at this time to prevent the unlatched petals from opening (due to lost pin);
  • Remove Stbd SARJ (Solar Alpha Rotary Joint) Cover 7, using PGT (Pistol Grip Tool) on its 6 bolds.] [New]

Newly added Get-ahead tasks are:

  • Re-installation of CETA (Crew & Equipment Translation Aid) Light Fixture;
  • Clean-up of Lab MMOD (micrometeoroid/orbital debris) shield.

Node-2 Checkout Status: After crew ingress in Node-2 yesterday, ground controllers successfully executed Part 1 of Node-2 Activation & Checkout. Powered on & verified were Node-2 connections to the MTL (Moderate Temperature Loop), ETCS (External Thermal Control System) Loop A, and EPS (Electrical Power System) Channel 1/4. It has been determined that Node-2 will remain activated during EVA-12, although its interior lighting and the functioning UOP (Utility Outlet Panel) will be turned off. [Checkout of one string of the Node-2 EPS via activation of the DDCUs (DC-to-DC Converter Units) and RPCMs (Remote Power Control Modules) was successfully completed, as were the activations of the #1 MDM (Multiplexer/Demultiplexer) computer of Node-2 and of the Node-2 MTL. CSA Robotics successfully performed a brief SSRMS (Space Station Remote Manipulator System) base change to the Node-2 PDGF (Power and Data Grapple) to check out that connection, afterwards moving the robotarm back to the Lab PGDF to support EVA-12 viewing by its cameras. Node-2 Stbd & Port CBMs (Common Berthing Mechanisms) petals are properly latched so that the EVA-12 spacewalkers can remove their launch locks. The Nadir CBM, with petals unlatched because of the hatch pip pin lost in their mechanism, for the time being remains safed with launch locks engaged.]

CEO (Crew Earth Observation) photo targets uplinked for today were Mount Nyiragongo (this is one of Africa's most notable volcanic peaks and is located near the eastern border of the Democratic Republic of the Congo, just north of Lake Kivu, with much larger Lake Victoria well to the east. It is an active and dangerous volcano with steep slopes and extremely fluid lava flows. ISS pass was near nadir in mid-morning light. Frequent cloudiness makes this a challenging target, but the crew looked for landmarks and tried for long-lens, detailed views), Bosumtwi Impact Crater (this well-marked impact crater is located about 150 km west of the south end of Lake Volta in south central Ghana. It is a very young impact [just over a million years old], about 10.5 km in diameter, and almost completely filled by a lake. There are only a few images of this crater in the CEO database because the area is usually cloud and/or haze covered. On this early morning pass, as ISS approached the coast from the NW, the crew was to find Lake Volta and look just right of track), Kingman Reef, Central Pacific (Kingman Reef is a largely submerged, uninhabited tropical atoll located in the North Pacific Ocean, roughly half way between Hawaiian Islands and American Samoa. It is the northernmost of the Northern Line Islands and lies 65 km NNW of Palmyra Atoll, the next closest island. The total area within the rim of the reef, which has greater depths in the western part, is 60 km². There is just one small strip of dry land on the eastern rim, with an area of less than 0.01 km². The ISS pass was near nadir in early morning light, requiring long-lens settings for detail), and Palmyra Atoll, Central Pacific (Palmyra is one of the Northern Line Islands of the North Pacific Ocean and lies to the S-SE of Kingman Reef [previous CEO target]. This oddly shaped atoll has an area of 4.6 square miles [12 km²], and it consists of an extensive reef, two shallow lagoons, and some 50 sand and reef-rock islets and bars covered with vegetation with a small air strip on the north side. ISS pass was near nadir in early morning, less than 10 seconds after Kingman).

CEO photography can be viewed and studied at the websites:
http://eol.jsc.nasa.gov (about 700,000 NASA digital photographs of Earth are downloaded by the public each month from this "Gateway" site);
http://earthobservatory.nasa.gov/
http://earthobservatory.nasa.gov/Study/AstronautPhotography

ISS Orbit (as of this morning, 9:07am EST [= epoch]):
Mean altitude -- 340.2 km
Apogee height -- 341.2 km
Perigee height -- 339.2 km
Period -- 91.34 min.
Inclination (to Equator) -- 51.64 deg
Eccentricity -- 0.000151
Solar Beta Angle -- 19.9 deg (magnitude increasing, to peak on 11/28 at 30.2 deg)
Orbits per 24-hr. day -- 15.76
Mean altitude loss in the last 24 hours -- 125 m
Revolutions since FGB/Zarya launch (Nov. 98) -- 51576

Significant Events Ahead (all dates Eastern Standard, some changes possible):
11/24/07 -- US EVA-12 "Charlie" (Whitson/Tani)
11/28/07 -- ISS Reboost
12/06/07 -- STS-122/Atlantis/1E launch -- Columbus Module, ICC-Lite, ~4:41pm EST
12/08/07 -- STS-122/Atlantis/1E docking
12/15/07 -- STS-122/Atlantis undocking
12/18/07 -- STS-122/Atlantis landing ~11:27am EST
12/22/07 -- Yuri Malenchenko's Birthday
12/23/07 -- Progress M-62/27P launch
12/26/07 -- Progress M-62/27P docking (DC1)
01/31/08 -- 50-Year Anniversary of Explorer 1 (1st U.S. Satellite on Redstone rocket) [Check it out at http://usspace50.com/ ]
02/06/08 – Progress M-61/26P undocking (DC1) & reentry
02/07/08 -- Progress M-63/28P launch
02/09/08 -- Progress M-63/28P docking
02/14/08 -- ATV-1 "Jules Verne" launch/Ariane V (Kourou, French Guyana)
02/14/08 -- STS-123/Endeavour/1J/A launch/1J/A -- SLP-SPDM, JEM ELM-PS (NET)
02/16/08 -- STS-123/Endeavour/1J/A docking
02/27/08 -- STS-123/Endeavour undocking
02/29/08 -- STS-123/Endeavour landing
03/01/08 -- Progress M-62/27P undocking (DC1) & reentry
03/06/08 -- ATV-1 docking (SM aft port)
04/07/08 -- Progress M-63/28P undocking (DC1) & reentry
04/08/08 -- Soyuz TMA-12/16S launch
04/10/08 -- Soyuz TMA-12/16S docking (DC1)
04/19/08 -- Soyuz TMA-11/15S undocking (FGB nadir port)
04/23/08 -- Soyuz TMA-12/16S relocation (from DC1 to FGB nadir port)
04/24/08 -- STS-124/Discovery/1J launch – JEM PM "Kibo", racks, RMS.
04/26/08 -- STS-124/Discovery/1J docking
05/04/08 -- STS-124/Discovery/1J undocking
05/14/08 -- Progress M-64/29P launch
05/16/08 -- Progress M-64/29P docking (DC1)
07/29/08 -- ATV-1 undocking (from SM aft port)
08/11/08 -- Progress M-64/29P undocking (from DC1)
08/12/08 -- Progress M-65/30P launch
08/14/08 -- Progress M-65/30P docking (SM aft port)
09/13/08 -- Progress M-66/31P launch
09/15/08 -- Progress M-66/31P docking (DC1)
09/20/08 -- (NET) STS-126/Discovery/ULF2 launch – MPLM(P), LMC
10/01/08 -- (NET) STS-126/Discovery/ULF2 undocking.
10/01/08 -- 50th Birthday of NASA
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/14/08 -- Soyuz TMA-13/17S launch
10/16/08 -- Soyuz TMA-13/17S docking (SM aft port)
04/??/09 -- Six-person crew on ISS
04/15/09 -- Constellation's Ares I-X Launch.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free