SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA Space Shuttle Processing Status Report 14 December 2007

 
STATUS REPORT
Date Released: Friday, December 14, 2007
Source: ATS Aerospatiale, Inc.


image

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-122 - 24th International Space Station Flight - Columbus Module
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: Targeted for Jan. 10, 2008
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin, Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Shuttle Program managers decided Thursday to target Jan. 10, 2008, to launch the STS-122 mission.

At Launch Pad 39A, preparations continue for a Dec. 18 tanking test to troubleshoot the engine cutoff (ECO) sensors. Test wiring has been spliced into an electrical harness in the aft main engine compartment connected with the ECO sensor system. The attached wiring leads to the interior of the mobile launcher platform where the time domain reflectometry (TDR) test equipment will be located. This wiring is being tested today. On Wednesday in the Vehicle Assembly Building, the TDR was connected to the external tank to be used for STS-123. This allowed a "dry" ambient temperature signature to be identified. Friday in Kennedy Space Center's cryogenic test bed facility, TDR instrumentation is being exposed to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. Saturday, the TDR will be taken to the launch pad and installed. The GO2 battery recharge was completed and the GH2 battery recharge is planned for Friday. Aft Propulsion System and Forward Reaction Control System GHe QD leak checks and disconnects were completed. Hard window cover installation is complete.

Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeted for Feb. 14, 2008
Launch Pad: 39A
Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman, Reisman
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, orbiter closeouts for Vehicle Assembly Building rollover continue. Main landing gear (MLG) brake installation is scheduled for today. ECL GN2 3-day decay test continues through Saturday. Final Ku-band self test and cable unwrap is complete. MEDS MDU display verification is complete and good. R5R vernier thruster flush, thruster drying and inspection, MLG strut seal remove-and-replace work, potable water servicing microbial testing, and ECL GN2 servicing and topoff were completed this week.

In high bay No. 1 of the Vehicle Assembly Building, booster integration activities continue. Stacking and joint closeouts are complete. S&A devices are installed and the LSCs will be installed today.

In high bay No. 2E of the Vehicle Assembly Building, LH2/LO2 disc measurements are in work and will continue through the weekend.

Preps for external tank mate will resume on Dec. 17 following Friday's external tank/solid rocket booster mate review. Final payload bay door closure for Orbiter Processing Facility rollover to the Vehicle Assembly Building is complete.

Mission: STS-124 - 26th International Space Station Flight - Kibo Pressurized Module, Japanese Remote Manipulator System
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for April 24, 2008
Launch Pad: 39A
Crew: Kelly, Ham, Nyberg, Garan, Fossum, Hoshide
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 3, the orbiter PVD door functional test, fuel cells 1 and 3 functional checkout, and RMS turnaround verification preps were completed. Port MPMs were moved to the vertical position on Dec. 13. The MADS data recorder removal, replacement, and retest are scheduled for Friday. The floor plate, side panels and phenolic panels were installed this week for aft skirt joint closeout and floor plate installation.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free