Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html
Mission: STS-122 - 24th International Space Station Flight - Columbus laboratory
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: Targeting Feb. 7
Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin, Walheim
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles
Launch Pad 39A
- Engine cutoff (ECO) sensor external feedthrough connector
- installation is complete
- Aft ECO instrumentation wiring removal and retest was completed
- All sensors have been tested successfully
- ECO sensor feedthrough foaming work on the external J-Box and solid rocket booster PAL ramp continues through the weekend
- Annual slidewire basket pad evacuation system maintenance and checkout continues through the weekend
- Solid rocket booster hydraulic retesting was completed Monday
- Liquid oxygen storage tank pressurization and relief valve testing
- was successfully completed Tuesday
Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2
Launch Date: Targeting Mid-March
Launch Pad: 39A
Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman, Reisman
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles
Orbiter Processing Facility Bay No. 2
- Removal and replacement work on the purge, vent and drain valve, which is part of the non-breathing air conditioning system completed Thursday
- Landing gear was retracted
- Potable water servicing samples completed Wednesday
- Main landing gear struts' weight on wheels leak check completed
Vehicle Assembly Building High Bay No. 1
- External tank/solid rocket booster closeout operations continue
- Re-foaming of the external tank assembly ring, that goes around the
- solid rocket boosters near the aft most SRB field joint, is being worked Friday
- ECO sensor system feed through work begins again Jan. 23
Mission: STS-124 - 26th International Space Station Flight - Kibo Pressurized Module, Japanese Remote Manipulator System
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeting April 24
Launch Pad: 39A
Crew: Kelly, Ham, Nyberg, Garan, Fossum, Hoshide, Chamitoff
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles
Orbiter Processing Facility Bay No. 3
- Vernier thruster pressure chamber flushes continue in preparation for inspections
- Ku band antenna stow scheduled for Friday
- Drag chute flight door checkout scheduled for Friday
- Solid rocket booster stacking scheduled for Jan. 31
- Power redundancy testing was successfully completed
- External tank separation camera interface verification is complete
- Payload premate testing completed Tuesday
- Decorate your home with nautical decor
- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.
- Play free bingo games and black out bingo.
- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.
- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.
- TV Stands