SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-122 Execute Package FD07

 
STATUS REPORT
Date Released: Thursday, February 14, 2008
Source: Johnson Space Center


image

Download document

FD06 MMT Summary

The MMT met to review mission progress, orbiter status, SSME final reports, and TPS evaluation status. As expected, the ROMS blanket and the window tile damage sites were cleared for entry. Preliminary analysis data for the missing stinger tile is still looking good and the complete analysis is expected at tomorrow's MMT. As stated in the FD04 MMT Summary, the TPS is still considered "Degraded" until all of the analysis has been reviewed by the MMT, but the TPS is acceptable for entry with no impacts to entry operations. The Columbus Module ingress was complete prior to the MMT, and the entire MMT was thrilled with the successful addition and incorporation of this European contribution to the ISS.

Ascent Imagery - All ascent imagery has now been collected and reviewed. Based on the SRB video, the imagery team has identified several additional potential impacts to the bottom of the orbiter. All of these sites have been cleared for entry based on the RPM pictures.

Damage Assessment Team - The DAT has cleared 16 of the 17 thermal blanket/tile items. A report of each of the cleared damaged sites was presented today. The ROMS blanket was fully characterized by the Focused Inspection and fully analyzed by the DAT. There is no flow or heating predicted beneath the protruding blanket. A conservative analysis shows the maximum temperatures are below structural thermal limits with margin (Figure 1). Aerodynamically, there is no concern with the blanket coming out further, nor is there a concern with debris liberation during entry. The predicted load at the end of entry heating (Mach 4.5) is 0.5 pounds. The predicted load at Mach 1 is 2.4 pounds. Using a test article, 11 pounds of force was required to move the blanket enough to lift the blanket above the surrounding area.

EVA DCM status - The DCM problem experienced during yesterday's EVA was reproduced on the ground after many attempts. The most likely cause is a software timing issue associated with the airlock depress rate and the ECWS displays. The power cycle from SCU to Battery was demonstrated to clear the anomaly.

SSME Report - The final SSME report was presented to the MMT. The SSMEs all performed nominally and had no anomalies. The redesigned HPOTP knife edge seal performed nominally.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free