NASA ISS On-Orbit Status 15 March 2008

 
STATUS REPORT
Date Released: Monday, March 17, 2008
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Saturday - 1J/A Flight Day 5 (FD5). Crew sleep cycle today: Sleep 7:00am-3:30pm; wake 3:30pm-7:00am tomorrow.

Node-2/JLP vestibule outfitting, JLP ingress & JLP rack reconfigurations successfully accomplished! The first Japan-made human-rated space facility is now in operation. Arigato Gozaimasu!
[After completing outfitting the Node-2 vestibule to the JAXA JLP (JEM Experiment Logistics Module Pressurized Section), including removing CBM (Common Berthing Mechanism) hardware, installing several utility jumpers & taking air samples, crewmembers, led by "high-productivity" Peggy Whitson, ingressed the module three hours early (~9:20pm EDT). This allowed the reconfiguring of three JLP racks (including relocating rack front stowage to Node-2 in preparation for the racks transfer to the JEM during Flight 1J, plus retrieving two bags from behind a rack that contain K-Bars and pivot fittings) to be completed right away, rather than tonight (FD6) as planned. FD6 timeline replanning includes troubleshooting/repair of the broken ISS Multimeter.]

Also, power was successfully applied to the SPDM PSU (Special Purpose Dexterous Manipulator/Power Switching Unit) at 10:10pm after the SSRMS (Space Station Remote Manipulator System) was connected, as planned, to Dextre's PDGF (Power & Data Grapple Fixture). [The SSRMS will remain grappled for power except when needed to support EVAs. EVA-2 will be executed tonight per the nominal plan except the OTCM-2 (ORU Tool Changeout Mechanism 2) thermal "sock" (cover) will not be removed until later.]

Before sleeptime this morning, FE-2 Eyharts worked in Node-2 to install an Orbiter IWIS RSU (Internal Wireless Instrumentation System/Remote Sensor Unit) that will be connected to the IWIS accelerometer on the Shuttle to measure structural dynamics.

Afterwards, Leo re-equipped the CSI-02 (CGBA Science Insert #2) component of the CGBA-5 (Commercial Generic Bioprocessing Apparatus #5) incubator payload with a Petri dish, inserting it with new material in the CGBA along with a support plate and other parts. Two used Petri dishes were trashed. [The CGBA incubator is controlled from the ground, with automatic video downlinked to Earth.]

FE-1 Malenchenko took situational photography of a bonding strip on the VPrK ventilator on the ATV (Automated Transfer Vehicle) airduct, to support the ground in coming up with a backup option.

Also before sleeptime, -

  • Yuri performed the periodic (generally monthly) service of the ESA/RSC-Energia experiment ALTCRISS (Alteino Long Term monitoring of Cosmic Rays on the ISS), removing its PCMCIA memory card from the AST spectrometer and replacing it with a new card; completed the routine servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM); conducted the daily IMS (Inventory Management System) maintenance, updating/editing its standard "delta file" including stowage locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur); and stowed trash & discarded equipment on Progress 28P, to be jettisoned on 4/7;
  • In the JLP, Peggy successfully checked out the NPRV (Negative Pressure Relief Valve) and ELPS (Emergency Lighting & Power Supply), then monitored N2 (nitrogen transfer from the Shuttle to ISS, to be terminated tonight by the Shuttle crew (expected total ~20lbs), and
  • Eyharts spent about an hour on handover activities with Reisman, who assumes Leo's FE-2 position after Shuttle departure.

A D-shaped handle with a small MMOD (Micrometeoroid/Orbital Debris) impact, brought onboard from EVA-1, was deburred and taped for protection, to be used on EVA-2 for carrying gear.

After a final review of EVA-2 procedures for tonight, the crew turned in at ~7:00am this morning for a good "night's" sleep.

For both crews, currently asleep, workday begins later today at 3:30pm EDT. After hatch closure this morning at ~6:40am, EV1 Rick Linnehan and EV2 Mike Foreman are on "Campout" (nachalo desaturatsiy = desaturation start) in the A/L CL (Crewlock). The two spacewalkers performed PBA (Portable Breathing Apparatus) mask prebreathe for denitrogenation, while readying their tools & equipment, then depressed the CL from 14.7 to 10.2 psi for their sleep period. [For the Campout, fresh METOX (Metal Oxide) canisters are installed in the A/L for CO2 control.]

After wakeup at 3:30pm, ending the 8.5-hr sleep period on 10.2 psi before the spacewalk, the CL hatch will be cracked (i.e., temporarily repressurized) at ~4:10pm for a hygiene break/with mask prebreathe for Foreman and Linnehan. Around 5:20pm, the hatch will be closed again for EVA preps in 10.2 psi, followed by EMU purge & prebreathe. Afterwards, Peggy and Bob Behnken will support CL depressurization, and EV1 & EV2 will egress around 8:23pm. [EVA-2 will last approximately 7.0 hrs, ending at ~3:28am (ISS crew sleep begins at 7:00am). Its major objectives are: (1) stow SPDM Arm 1 & 2 ; (2) install SPDM, (3) remove thermal covers including the "get-aheads" from EVA-1; (4) clean up the SLP (Spacelab Pallet) for its return to the PLB (Payload Bay), (5) clean up worksite & ingress.]

Before breakfast, as suggested on her discretionary "job jar" task list, Peggy Whitson will complete another "overnight" run with the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. [To monitor the crewmember's sleep/wake patterns and light exposure, Peggy wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary "job jar" task list.]

A second new "job jar" item for Peggy is to fill out the regular FFQ (Food Frequency Questionnaire) on the MEC (Medical Equipment Computer). [By means of these FFQs, U.S. astronauts keep a personalized log of their nutritional intake over time on special MEC software. Recorded are the amounts consumed during the past week of such food items as beverages, cereals, grains, eggs, breads, snacks, sweets, fruit, beans, soup, vegetables, dairy, fish, meat, chicken, sauces & spreads, and vitamins.]

Before crew egress at ~8:23pm, FE-2-16 Garrett Reisman will set up the SSRMS for the spacewalk, releasing the SPDM and maneuvering the robotarm to the APFR (Articulated Portable Foot Restraint) install position. During EVA-2, Garrett will support Rick and Mike with the SSRMS and afterwards regrapple the SPDM to continue providing power to its SPU.

ISS Crew Sleep Shift Planning: To synchronize the ISS crew's timeline with STS-123/1J/A docking and subsequent docked activities, Peggy's, Yuri's and Leo's wake/sleep cycle is undergoing a number of shifts which started on 3/11. For the next six days, the wake/sleep shift schedule is as follows (all times EDT):

FD6

Wake: 3:30pm (3/15) - 7:00am (3/16)
Sleep: 7:00am - 3:30pm (3/16)

FD7

Wake: 3:30pm (3/16) - 6:00am (3/17)
Sleep: 6:00am - 2:30pm (3/17)

FD8

Wake: 3:30pm (3/17) - 6:00am (3/18)
Sleep: 6:00am - 2:30pm (3/18)

FD9

Wake: 2:30pm (3/18) - 5:00am (3/19)
Sleep: 5:00am - 1:30pm (3/19)

FD10

Wake: 1:30pm (3/19) - 5:00am (3/20)
Sleep: 5:00am - 1:30pm (3/20)

FD11

Wake: 1:30pm (3/20)- 5:00am (3/21)
Sleep: 5:00am - 1:30pm (3/21)

ISS Orbit (as of this morning, 8:13am EDT [= epoch]):
Mean altitude -- 340.5 km
Apogee height -- 341.3 km
Perigee height -- 339.7 km
Period -- 91.34 min.
Inclination (to Equator) -- 51.64 deg
Eccentricity -- 0.0001173
Solar Beta Angle -- 25.4 deg (magnitude increasing)
Orbits per 24-hr. day -- 15.76
Mean altitude loss in the last 24 hours -- 92 m
Revolutions since FGB/Zarya launch (Nov. 98) -- 53374

Significant Events Ahead (all dates Eastern Time, some changes possible.):

  • 3/15 (FD6) - EVA-2 to continue SPDM assembly (~8:23pm)
  • 3/17 (FD8) - EVA-3 to transfer ORUs, cleanup SLP, install MISSE-6, etc. (~7:23pm)
  • 3/20 (FD11) - EVA-4 to demonstrate T-RAD, do get-aheads (~6:28pm)
  • 3/22 (FD13) - EVA-5 to stow OBSS, TBDs (~5:23pm)
  • 3/24 (FD15) - STS-123/Endeavour undocking (~7:55pm)
  • 3/26 (FD17) - STS-123/Endeavour deorbit (~7:33pm); landing (KSC) -- ~8:35pm;

03/14/08 -- ATV1 "Jules Verne" CAM (Collision Avoidance Maneuver) Demo, -5m/s, 4:00am-5:30am EDT;
03/19/08 -- ATV1 "Jules Verne" parking point (loiter) arrival 8:00am EDT ~1200 mi. in front of ISS;
03/27/08 - ATV1 end of loiter; leave parking point - ~2:00am;
03/29/08 -- ATV1 Demo Day 1
03/31/08 -- ATV1 Demo Day 2
04/03/08 -- ATV1 Demo Day 3 (docking) ~10:39am EDT
04/07/08 -- Progress M-63/28P undocking (DC1) & reentry
04/08/08 -- Soyuz TMA-12/16S launch - ~7:16am
04/10/08 -- Soyuz TMA-12/16S docking (DC1) - ~8:43am
04/19/08 -- Soyuz TMA-11/15S undocking/landing (FGB nadir port)
05/10/08 -- Soyuz TMA-12/16S relocation (from DC1 to FGB nadir port)
05/14/08 -- Progress M-64/29P launch
05/16/08 -- Progress M-64/29P docking (DC1)
05/25/08 -- STS-124/Discovery/1J launch - JEM PM "Kibo", racks, RMS
05/27/08 -- STS-124/Discovery/1J docking
06/05/08 -- STS-124/Discovery/1J undocking
08/07/08 -- ATV1 undocking
08/12/08 -- Progress M-65/30P launch
08/14/08 -- Progress M-65/30P docking (SM aft port)
08/28/08 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
09/09/08 -- Progress M-64/29P undocking (from DC1)
09/10/08 -- Progress M-66/31P launch
09/12/08 -- Progress M-66/31P docking (DC1)
10/01/08 -- NASA 50 Years
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/12/08 -- Soyuz TMA-13/17S launch
10/14/08 -- Soyuz TMA-13/17S docking (SM aft port)
10/16/08 -- STS-126/Discovery/ULF2 launch - MPLM Leonardo, LMC
10/18/08 -- STS-126/Discovery/ULF2 docking
10/23/08 -- Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 -- Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/20/08 -- ISS 10 Years
11/26/08 -- Progress M-67/32P launch
11/28/08 -- Progress M-67/32P docking (SM aft port)
12/04/08 -- STS-119/Discovery/15A launch - S6 truss segment
12/06/08 -- STS-119/Discovery/15A docking
12/15/08 -- STS-119/Discovery/15A undocking
1QTR CY09 -- STS-127/2J/A launch - JEM EF, ELM-ES, ICC-VLD
2QTR CY09 -- STS-128/17A - MPLM, last crew rotation
05/??/09 -- Six-person crew on ISS (following Soyuz 18S-2 docking)
3QTR CY09 -- STS-129/ULF3 - ELC1, ELC2
4QTR CY09 -- STS-130/19A - MPLM
1QTR CY10 - STS-131/ULF4
2QTR CY10 -- STS-132/20A - Node-3 + Cupola
3QTR CY10 - STS-133/ULF5.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free