SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-123 Report #15 Tuesday, March 18, 2008 - 3:00 a.m. CDT

 
STATUS REPORT
Date Released: Tuesday, March 18, 2008
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

Astronauts Rick Linnehan and Bob Behnken completed a 6 hour 53 minute spacewalk today, finishing the assembly and installation of the International Space Station's newest robot, Dextre. Today's spacewalk was the third of five planned for the STS-123 mission and was the 107th spacewalk dedicated to the assembly of the station.

Linnehan and Behnken focused on installing Dextre's tool holder assembly and a Camera Light Pan Tilt Assembly (CLPA), which will serve as Dextre's eyes. The spacewalkers also prepared the Spacelab Logistics Pallet, on which the robot was assembled, for its return to Endeavour's cargo bay Tuesday evening.

The astronauts also installed spare equipment for the station on an external platform on the Quest airlock, including a yaw joint for the station's robotic arm, Canadarm2, and two spare direct current switching units.

The spacewalkers attempted to install the MISSE 6 experiment onto the Columbus module, but were unable to properly engage latching pins used to hold the experiment packages onto the hull of Columbus. MISSE 6 is designed to expose experiments to the space environment for six months and measure how materials and coatings are affected by the extreme environment.

Tuesday night, the crew will again use the station's robotic arm to grapple Dextre and move it to a power and data grapple fixture (PDGF) on the Destiny laboratory where it will reside. The next spacewalk by Behnken and Mike Foreman is scheduled for Thursday, when they will practice shuttle tile repair techniques and replace a failed circuit breaker on the station's truss.

Endeavour Commander Dom Gorie spent part of the day examining minor condensation on a cooling line under the floorboards of the shuttle's mid-deck. The condensation was noted after some noises were detected in that area. Flight controllers say the condensation has no impact on shuttle operations, but the cooling line may be inspected periodically during the remainder of the mission.

The next STS-123 status report will be issued after crew wake-up Tuesday afternoon or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free