SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA ISS On-Orbit Status 21 April 2008

 
STATUS REPORT
Date Released: Monday, April 21, 2008
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Underway: Week 1 of Increment 17 (with CDR Sergei Volkov, FE-1 Oleg Kononenko, FE-2 Garrett Reisman).

The crew enjoyed a full rest day.

Having passed Day 30 of his flight, FE-2 Reisman ended his latest session with the NASA/JSC experiment NUTRITION w/Repository by collecting a final urine sample upon wakeup for storage in the MELFI (Minus-Eighty Laboratory Freezer for ISS).  The sampling kit was then stowed away.    [The current NUTRITION project is the most comprehensive in-flight study done by NASA to date of human physiologic changes during long-duration space flight.  It includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes, expanding the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.]

In the JLP (Japanese Experiment Module Experiment Logistics Module Pressurized Section), Garrett Reisman performed the periodic checkup on JLP status and shell temperatures by using the MKAM (Minimum Keep Alive Monitor), then called down the results of the temperature check via S-band.

CDR Volkov conducted the routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including ASU toilet facilities systems/replaceables.

The crewmembers completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exercise device (FE-2) and VELO bike with bungee cord load trainer (CDR, FE-1).

Afterwards, Garrett downloaded the crew's exercise data file to the MEC (Medical Equipment Computer) for downlink, as well as the daily wristband HRM (Heart Rate Monitor) data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

At ~1:45pm EDT, FE-2 Reisman powered up the SM's amateur radio equipment (Kenwood VHF transceiver with manual frequency selection, headset, and power supply) and at 1:50pm conducted a ham radio exchange with children at the Arnold Palmer Hospital for Children in Orlando, Florida.   [Arnold Palmer Hospital for Children in Orlando, Florida, is one of 8 hospitals under the Orlando Regional Healthcare umbrella and addresses the unique medical needs of children in the Central Florida area, including a level one trauma center. The children who participated in this contact are patients at the hospital. It was an exciting surprise and enriching experience that made their hospital stay a memorable event.  Questions to Garrett were uplinked beforehand.  "What kind of food do you eat, and is it good?"; "How long can you stay out on a spacewalk?"; "What experiments are you doing in space?"; "What duties are yours on the Space Station?"; "How do you communicate with your family?"; "What do you do if you get sick in space?"; "What can you see on Earth from Space?"; "How long will the Space Station last?"; "What skills do I need to be an astronaut?"; "What is your favorite thing to do on the Space Station?"]

ATV Reboost Test:   The single-burn reboost firing test of the ATV "Jules Verne" overnight at 12:10am-1:52am was conducted successfully. Burn duration was 4m 33s, with a delta-V of 1.04 m/s (3.41 ft/sec). Mean altitude gain was ~1.49 km. The purpose of the reboost was to test the ATV main engines prior to the scheduled reboost on 4/25 (Friday).  ISS attitude control authority was handed over to the Russian MCS (Motion Control System) thrusters at ~12:00am and returned to US momentum management at ~2:47am.

CEO photo target uplinked for today was Central Asia dust event (Dynamic event. A major dust event is taking place in the Takla Mayan Desert of western China. This desert basin is often much hazier than surrounding areas due to blowing dust. Images were to include the mountainous margins of the basin so that researchers can gauge the altitude of the top of dusty air mass. The Takla Mayan is one of the dustiest places on Earth, with its dust frequently falling on Beijing and Japan).

CEO photography can be studied at this "Gateway" website:
http://eol.jsc.nasa.gov  (as of 3/1/08, this database contained 757,605 views of the Earth from space, with 314,000 from the ISS alone).

Significant Events Ahead (all dates Eastern Time, some changes possible.):

04/25/08 -- ATV-1 "Jules Verne" reboost
05/07/08 -- Soyuz TMA-12/16S relocation (from DC1 to FGB nadir port)
05/14/08 -- Progress M-64/29P launch
05/16/08 -- Progress M-64/29P docking (DC1)
05/31/08 -- STS-124/Discovery/1J launch - JEM PM "Kibo", racks, RMS (5:01pm EDT)
06/02/08 -- STS-124/Discovery/1J docking
07/10/08 -- Russian EVA-20 (7/10-11)
08/07/08 -- ATV1 undocking
08/12/08 -- Progress M-65/30P launch
08/14/08 -- Progress M-65/30P docking (SM aft port)
08/28/08 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
09/09/08 -- Progress M-64/29P undocking (from DC1)
09/10/08 -- Progress M-66/31P launch
09/12/08 -- Progress M-66/31P docking (DC1)
10/01/08 -- NASA 50 Years
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/12/08 -- Soyuz TMA-13/17S launch
10/14/08 -- Soyuz TMA-13/17S docking (SM aft port)
10/16/08 -- STS-126/Discovery/ULF2 launch - MPLM Leonardo, LMC
10/18/08 -- STS-126/Discovery/ULF2 docking
10/23/08 -- Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 -- Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/20/08 -- ISS 10 Years
11/26/08 -- Progress M-67/32P launch
11/28/08 -- Progress M-67/32P docking (SM aft port)
12/04/08 -- STS-119/Discovery/15A launch - S6 truss segment
12/06/08 -- STS-119/Discovery/15A docking
12/15/08 -- STS-119/Discovery/15A undocking
04/23/09 -- STS-127/2J/A launch - JEM EF, ELM-ES, ICC-VLD
07/16/09 -- STS-128/17A/Atlantis - MPLM(P), last crew rotation
05/??/09 -- Six-person crew on ISS (following Soyuz 18S-2 docking)
09/03/09 -- STS-129/ULF3/Discovery - ELC1, ELC2
10/22/09 -- STS-130/20A/Endeavour - Node-3 + Cupola
01/21/10 -- STS-131/19A/Atlantis - MPLM(P)
03/18/10 -- STS-132/ULF4/Discovery - ICC-VLD, MRM1 (contingency)
04/29/10 -- STS-133/ULF5/Endeavour - ELC3, ELC4 (contingency).


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free