NASA New Horizons Mission: The PI's Perspective: Green Beacons for a Golden Bird

 
STATUS REPORT
Date Released: Thursday, May 1, 2008
Source: Johns Hopkins University APL New Horizons Mission


image

May 1, 2008

As you read these words, the New Horizons spacecraft remains in a long period of almost continuous hibernation, which began on Feb. 21 and stretches until Sept. 2. During this time the spacecraft will fly from nine to almost 11 times as far from the Sun as the Earth is, covering more than 300 million more kilometers! Except for two weeks of high activity that begins May 20, the spacecraft is running on its own, and doing little besides reporting its status each Monday and delivering a brief telemetry report most Thursdays. These contacts have shown that things are going well: all of the weekly status reports (technically called "beacon tones") have been green, and all of the telemetry passes have indicated that the spacecraft is performing well.

Although our spacecraft has been hibernating, our ground and science teams are anything but quiescent.

Planning for the Pluto encounter is in full swing. Our goal is to complete the near-encounter sequence design and testing within a year, so that we can conduct a full rehearsal on New Horizons in mid-2009. In fact, just this week we completed an Encounter Requirements Review to verify that, before we begin designing the detailed encounter sequences, we have a complete list of every scientific and navigation activity that we plan to conduct during the encounter.

In June we will conduct an Encounter Feasibility Review, in which detailed encounter plans will be tested against dozens of ground and spacecraft constraints - such as power, data storage and available fuel - to ensure that each aspect of those plans is feasible. We'll follow that review with a Preliminary Design Review in August, after which detailed sequence building will get under way.

July 2015 may be seven years away, but with our need to reduce our team size and budget after 2009, New Horizons must complete its encounter planning, ground testing, and a full dress rehearsal on the spacecraft barely more than one year from now!

The New Horizons team is also busy planning sequences for this fall's spacecraft and instrument checkout period, which will run from Sept. 2 to mid-November. In addition to the annual tests, this fall's activities will also include uplinking new command and data handling, guidance/navigation, and fault protection software that resolves several dozen minor bugs and provides new capabilities that will improve our ability to perform at Pluto and in the Kuiper Belt. The team is nearly finished building and beginning to test "NHOPS II," our second (and long desired) backup New Horizons spacecraft simulator, which will be operational at the Johns Hopkins Applied Physics Lab (APL) by late summer.

I mentioned our plan to wake up New Horizons for a couple of weeks beginning on May 20; the main reason for the wake-up is to reposition the spacecraft antenna to account for the motion of Earth around the Sun. We have to do this several times each year, and we use it as an opportunity to combine important activities that need to occur between annual checkouts.

This time, spacecraft activities will include navigation ranging tests that mimic Pluto operations; spacecraft tracking; downlinking data that the Venetia Burney Student Dust Counter instrument has collected this year; a "bug fix" software upload and subsequent test of the SWAP solar wind plasma instrument; and an upload of the spacecraft command sequence that will guide New Horizons from June 3 to Sept. 5.

Bon Voyage, Jo-Anne!

The last thing I'll mention is that our project secretary, Jo-Anne Kierzkowski, retired a couple of weeks ago. JoAnne worked at APL for many years, and had been with the New Horizons project since our team formed in December 2000.

Jo-Anne provided us with expert project coordination, from the start of our proposal writing, through spacecraft design, build, test and launch, and the first 1.5 billion kilometers of travel toward Pluto. Although she isn't going far and will be celebrating with us at the Pluto encounter in 2015, we will miss her work and her cheerful smile every day in between.

Well, that catches you up with where New Horizons is and what the spacecraft and project team have been doing. I'll be back with more news soon. In the meantime, keep on exploring, just like we do!

-Alan Stern


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Pratt & Whitney Rocketdyne's Space Shuttle Main Engines Power Delivery of Robotic Control Station and Module

- NASA Ames Hosts Wind Tunnel Tests to Improve Semi-Trucks' Fuel Efficiency

- Spotlighting ESA's year of technology innovations

- NASA Solicitation: Mars Mission Organics Detection Instrument

- NASA Award: Recovery Act: Active Electromechanical Suspension System for Planetary Rovers

- NASA Solicitation: Science Evaluation Asessments Studies Services and Support

- NASA Solicitation: Poly-Picosatellite Orbital Deployer NPP Mission Support

- NASA Award: Recovery Act: Radiation Resistant Reconfigurable Shape Memory Rubber Space Arrays

- NASA Award: Recovery Act: Odor Control in Spacecraft Waste Management

- NASA Award: Recovery Act: Automated Hybrid Microwave Heating for Lunar Surface Solidification

- NASA Recovery Act: Self-deploying Composite Habitats

- NASA Synopsis: Industry Conference Sponsorship

- Zero Gravity Corporation Brings Sky High Adventure To Sin City With Exclusive Weightless Flight, February 27

- Boeing Prepares Last Major Piece of Hardware for International Space Station

- NASA Expendable Launch Vehicle Status Report 5 Feb 2010

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Negative Ions a Positive Sign for Liquid Water in Enceladus

NASA STS-130 Report #02 6:30 p.m. CST Monday, Feb. 8, 2010

NASA ISS On-Orbit Status 8 February 2010

Joint USAF/NOAA Report of Solar and Geophysical Activity 8 Feb 2010

Applications Available for Pre-Service Teacher Institute at NASA’s Johnson Space Center

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free