NASA New Horizons Mission: The PI's Perspective: Green Beacons for a Golden Bird

 
STATUS REPORT
Date Released: Thursday, May 1, 2008
Source: Johns Hopkins University APL New Horizons Mission


image

May 1, 2008

As you read these words, the New Horizons spacecraft remains in a long period of almost continuous hibernation, which began on Feb. 21 and stretches until Sept. 2. During this time the spacecraft will fly from nine to almost 11 times as far from the Sun as the Earth is, covering more than 300 million more kilometers! Except for two weeks of high activity that begins May 20, the spacecraft is running on its own, and doing little besides reporting its status each Monday and delivering a brief telemetry report most Thursdays. These contacts have shown that things are going well: all of the weekly status reports (technically called "beacon tones") have been green, and all of the telemetry passes have indicated that the spacecraft is performing well.

Although our spacecraft has been hibernating, our ground and science teams are anything but quiescent.

Planning for the Pluto encounter is in full swing. Our goal is to complete the near-encounter sequence design and testing within a year, so that we can conduct a full rehearsal on New Horizons in mid-2009. In fact, just this week we completed an Encounter Requirements Review to verify that, before we begin designing the detailed encounter sequences, we have a complete list of every scientific and navigation activity that we plan to conduct during the encounter.

In June we will conduct an Encounter Feasibility Review, in which detailed encounter plans will be tested against dozens of ground and spacecraft constraints - such as power, data storage and available fuel - to ensure that each aspect of those plans is feasible. We'll follow that review with a Preliminary Design Review in August, after which detailed sequence building will get under way.

July 2015 may be seven years away, but with our need to reduce our team size and budget after 2009, New Horizons must complete its encounter planning, ground testing, and a full dress rehearsal on the spacecraft barely more than one year from now!

The New Horizons team is also busy planning sequences for this fall's spacecraft and instrument checkout period, which will run from Sept. 2 to mid-November. In addition to the annual tests, this fall's activities will also include uplinking new command and data handling, guidance/navigation, and fault protection software that resolves several dozen minor bugs and provides new capabilities that will improve our ability to perform at Pluto and in the Kuiper Belt. The team is nearly finished building and beginning to test "NHOPS II," our second (and long desired) backup New Horizons spacecraft simulator, which will be operational at the Johns Hopkins Applied Physics Lab (APL) by late summer.

I mentioned our plan to wake up New Horizons for a couple of weeks beginning on May 20; the main reason for the wake-up is to reposition the spacecraft antenna to account for the motion of Earth around the Sun. We have to do this several times each year, and we use it as an opportunity to combine important activities that need to occur between annual checkouts.

This time, spacecraft activities will include navigation ranging tests that mimic Pluto operations; spacecraft tracking; downlinking data that the Venetia Burney Student Dust Counter instrument has collected this year; a "bug fix" software upload and subsequent test of the SWAP solar wind plasma instrument; and an upload of the spacecraft command sequence that will guide New Horizons from June 3 to Sept. 5.

Bon Voyage, Jo-Anne!

The last thing I'll mention is that our project secretary, Jo-Anne Kierzkowski, retired a couple of weeks ago. JoAnne worked at APL for many years, and had been with the New Horizons project since our team formed in December 2000.

Jo-Anne provided us with expert project coordination, from the start of our proposal writing, through spacecraft design, build, test and launch, and the first 1.5 billion kilometers of travel toward Pluto. Although she isn't going far and will be celebrating with us at the Pluto encounter in 2015, we will miss her work and her cheerful smile every day in between.

Well, that catches you up with where New Horizons is and what the spacecraft and project team have been doing. I'll be back with more news soon. In the meantime, keep on exploring, just like we do!

-Alan Stern


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free