SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA ISS On-Orbit Status 18 May 2008

 
STATUS REPORT
Date Released: Sunday, May 18, 2008
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Sunday - crew off duty. Ahead: Week 5 of Increment 17.

Crew wake/sleep cycle is back on the regular 2:00am - 5:30pm EDT period.

The crew performed the regular weekly three-hour task of thorough station cleaning. ["Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the Service Module (SM) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the FE's sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of the house cleaning, CDR Volkov conducted the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP and today also the periodic cleaning of the pre-filter of the POTOK air filtration system. The crew also performed regular maintenance inspection & cleaning on fan grilles in the FGB (FS5 & FS6, TsV2), SM (VPkhO & VPrK), DC1 (V3) and in the COL (Columbus Orbital Laboratory).

FE-2 Reisman ended his FD60 session with the NASA/JSC experiment NUTRITION w/Repository, his second, by collecting a final urine sample upon wakeup for storage in the MELFI (Minus-Eighty Laboratory Freezer for ISS). The sampling kit was then stowed away. [The current NUTRITION project is the most comprehensive in-flight study done by NASA to date of human physiologic changes during long-duration space flight. It includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes, expanding the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.]

FE-1 Kononenko serviced the Russian BMP (Harmful Impurities Removal System), terminating the "bake-out" cycle to vacuum on absorbent bed #1 of the regenerable dual-channel filtration system and starting the process on bed #2. The regen process will be terminated tonight at ~4:55pm EDT. [Regeneration of each of the two cartridges takes about 12 hours. Filter bed #1 was regenerated overnight. In order to assist in atmosphere scrubbing after the Freon-218 spill from the SKV-2 air conditioner on 4/29, the BMP's regeneration cycle was moded to 5 days instead of the regular 20 days.]

The crew conducted their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exerciser (FE-1 FE-2) and VELO bike with bungee cord load trainer (CDR). [The RED, as an anaerobic muscle exerciser, allows a variety of routines: squat, heel raises, bent-over rowing, abdominal crunches, deadlift, bench presses, upright rowing, etc. For Sergey & Oleg, who are using RED three times a week, each session features four different routines which vary from day to day to target different muscle groups.]

At ~6:35am EDT, the ISS crew linked up with the Lead Flight Director at JSC/MCC-H via S-band/audio to conduct their first weekly tagup. [S/G-2 (Space-to-Ground 2) phone patch via SSC-10 (Station Support Computer 10)].

At ~9:15am, the crewmembers held their regular WPC (Weekly Planning Conference) with the ground, discussing next week's "Look-Ahead Plan" (prepared jointly by MCC-H and TsUP/Moscow timeline planners) via S-band/audio, reviewing the monthly calendar, upcoming activities, and any concerns about future on-orbit events.

The CDR and FE-1 had their weekly PFC (Private Family Conference) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Sergey at ~7:00am, Oleg at ~8:20am.

No CEO photography targets uplinked for today

CEO imagery can be studied at this "Gateway" website:
http://eol.jsc.nasa.gov (as of 3/1/08, this database contained 757,605 views of the Earth from space, with 314,000 from the ISS alone).

Significant Events Ahead (all dates Eastern Time, some changes possible.):
05/31/08 -- STS-124/Discovery/1J launch - JEM PM "Kibo", racks, RMS (5:02pm EDT nominal)
06/02/08 -- STS-124/Discovery/1J docking (1:49pm)


Tentative STS-124 docked working timeline:

  • 6/03 -- EVA-1 (11:30am, 6.5 hrs.), OBSS transfer, JPM prep, S3/S4 SARJ TBA install, JPM install
  • 6/04 -- JPM Vestibule outfitting, Reisman/Chamitoff handovers
  • 6/05 -- EVA-2 (11:30am, 6.5 hrs), JTVE install, JRMS cvr remv, NTA prep, CP 9 ETVCG retrv
  • 6/06 -- JLP relocate to JPM; JLP Vestibule leak check
  • 6/07 -- JLP Vestibule outfitting
  • 6/08 -- EVA-3 (10:30am, 6.3 hrs), S1 NTA install, CP9 ETVCG install, JRMS cover remove
  • 6/09 -- JRMS checkouts, JLP Vestibule outfitting, A/L BCM R&R
  • 6/10 -- Sayonara (~4:00pm), hatch close (~4:30pm)
  • 6/11 -- Undocking (~9:04am); OBSS survey/inspection
  • 6/12 -- Mostly off-duty
  • 6/13 -- Stowing; deorbit preps
  • 6/14 -- Deorbit burn (~9:56am);

06/14/08 -- STS-124/Discovery landing (KSC: ~10:59am EDT, nominal)
07/10/08 -- Russian EVA-20 (7/10-11)
??/??/08 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
09/05/08 -- ATV1 undocking
09/09/08 -- Progress M-64/29P undocking (from DC1)
09/10/08 -- Progress M-65/30P launch
09/12/08 -- Progress M-65/30P docking
10/01/08 -- NASA 50 Years
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/12/08 -- Soyuz TMA-13/17S launch
10/14/08 -- Soyuz TMA-13/17S docking (SM aft port)
10/16/08 -- STS-126/Discovery/ULF2 launch - MPLM Leonardo, LMC
10/18/08 -- STS-126/Discovery/ULF2 docking
10/23/08 -- Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 -- Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/20/08 -- ISS 10 Years
11/26/08 -- Progress M-66/31P launch
11/28/08 -- Progress M-66/31P docking
12/04/08 -- STS-119/Discovery/15A launch - S6 truss segment
12/06/08 -- STS-119/Discovery/15A docking
12/15/08 -- STS-119/Discovery/15A undocking
2QTR CY09 -- STS-127/2J/A launch - JEM EF, ELM-ES, ICC-VLD
3QTR CY09 -- STS-128/17A/Atlantis - MPLM(P), last crew rotation
05/??/09 -- Six-person crew on ISS (following Soyuz 18S-2 docking)
3QTR CY09 -- STS-129/ULF3/Discovery - ELC1, ELC2
4QTR CY09 -- STS-130/20A/Endeavour - Node-3 + Cupola
1QTR CY10 -- STS-131/19A/Atlantis - MPLM(P)
1QTR CY10 -- STS-132/ULF4/Discovery - ICC-VLD, MRM1 (contingency)
2QTR CY10 -- STS-133/ULF5/Endeavour - ELC3, ELC4 (contingency).


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free