SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA ISS On-Orbit Status 22 May 2008

 
STATUS REPORT
Date Released: Friday, May 23, 2008
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below.

CDR Volkov conducted the periodic servicing of the active Russian BMP (Harmful Impurities Removal System) by starting the "bake-out" cycle to vacuum on absorbent bed #1 of the regenerable dual-channel filtration system. The regen process will be terminated before sleeptime, at ~5:15pm EDT. Regeneration of bed #2 follows tomorrow. [Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods. In order to assist in atmosphere scrubbing after the Freon-218 (Khladon) spill from the SKV-2 air conditioner on 4/24, the BMP's regeneration cycle was moded to 5 days instead of the regular 20 days.]

Volkov & Kononenko spent another 2 hrs working jointly on cargo transfers & stowage from Progress 29P, tracking the moves in the IMS (Inventory Management System).

Reisman meanwhile performed the periodic checkup on active U.S. payloads, i.e., cleaning the ANITA (Analyzing Interferometer for Ambient Air) inlet plus inspecting and filter cleaning of the CGBA-5 (Commercial Generic Bioprocessing Apparatus 5) incubator payload. [The CGBA incubator is controlled from the ground, with automatic video downlinked to Earth. ANITA is now back up again and running in support of the on-going Freon-218 scrubbing from the cabin air, collecting data every six seconds and downlinking the data daily to the ground team. ANITA monitors low levels of potential gaseous contaminants in the ISS cabin atmosphere with a capability of simultaneously monitoring 32 gaseous contaminants. The experiment is testing the accuracy and reliability of this technology as a potential next-generation atmosphere trace-gas monitoring system for ISS and future spacecraft. This is a cooperative investigation with ESA.]

Afterwards, the FE-2 worked in the Node-2 reconfiguring the food container stowage in "Harmony".

Volkov upgraded the Russian RSK1 laptop with new software and ran a test on the fresh load.

Afterwards, Sergey performed monthly maintenance on the deactivated Russian IK0501 GA (Gas Analyzer) of the SOGS Pressure Control & Atmospheric Monitoring System by replacing its CO2 filter assembly (BF) with a new unit from FGB stowage (done last: 4/11), then reactivating the unit.

FE-1 Kononenko completed another routine radiation data monitoring & logging session for flow & dose power data with the MATRYOSHKA-R and AST spectrometer radiation payload. [Data were downloaded via OCA and the memory storage card was replaced.]

Continuing the extended leak checking of the spare BZh Liquid Unit (#056) for the Elektron O2 generator, Kononenko charged the unit once again with pressurized N2 from the BPA Nitrogen Purge Unit (#23) to 1 atm (1 kg/cm2). The last test pressurization was on 4/13. [During Elektron operation, the inert gas locked up in the BZh has the purpose to prevent dangerous O2/H2 mixing. A leaking BZh cannot be used.]

In the Airlock (A/L), the crew connected EMUs (Extravehicular Mobility Units) #3003 & #3004 to their SCUs (Service & Cooling Umbilicals) and initiated the standard 1-hr scrubbing process on the spacesuit's cooling water loops, filtering ionic and particulate matter (via a 3-micron filter). The cooling loops were afterwards reconfigured and the EMU water processing kit disassembled and stowed.

Volkov serviced the MSG (Microgravity Science Glovebox), conducting the periodic performance test on the 7SD MOK pressure sensor.

The FE-1 set up the pumping equipment and initiated (later closed out) the periodic 3-hr transfer of urine from EDV-U containers in the SM to the Rodnik BV tanks of Progress M-64/29P (emptied of potable water yesterday).

Garrett Reisman conducted the weekly 10-min. CWC audit as part of on-going WDS (Water Delivery System) assessment of onboard water supplies. [Updated "cue cards" based on the crew's water calldowns are sent up every other week. The current cue card (17-0002E) lists 39 CWCs (~1378.8.1 L total) for the four types of water identified on board: technical water (756.7 L, for Elektron, flushing, hygiene, including470.3 L non-usable water because of Wautersia bacteria), potable water (534.8 L, incl. 88.7 L currently on hold), condensate water (81.5 L), waste/EMU dump and other (5.8 L). Wautersia bacteria are typical water-borne microorganisms that have been seen previously in ISS water sources. These isolates pose no threat to human health.]

Later, the FE-2 filled out the regular FFQ (Food Frequency Questionnaire), his ninth, on the MEC (Medical Equipment Computer). [On the FFQs, NASA/ESA astronauts keep a personalized log of their nutritional intake over time on special MEC software. Recorded are the amounts consumed during the past week of such food items as beverages, cereals, grains, eggs, breads, snacks, sweets, fruit, beans, soup, vegetables, dairy, fish, meat, chicken, sauces & spreads, and vitamins. The FFQ is performed once a week to estimate nutrient intake from the previous week and to give recommendations to ground specialists that help maintain optimal crew health. Weekly estimation has been verified to be reliable enough that nutrients do not need to be tracked daily.]

Sergey and Garrett reviewed the 400mm & 800mm training videos for photographing the Shuttle RPM (R-bar Pitch Maneuver), then, at 11:15am EDT, linked up with ground specialists at MCC-H for a 15-min debrief to discuss the images downlinked from their recent (5/16) Shuttle RPM skill training. [The skill training prepares the crew for the bottom side mapping of the Discovery upon its arrival on 6/2. During the RPM at ~600 ft from the station, the ISS crew will have only ~90 seconds for taking high-resolution digital photographs of all tile areas and door seals on the Orbiter, to be downlinked for launch debris assessment. Thus, time available for the shooting will be very limited, requiring great coordination between the two headset-equipped photographers and the Shuttle.]

Reisman had another hour for his departure preparations and prepacking.

Volkov completed the routine maintenance of the SM's SOZh/ECLSS system, including ASU toilet facilities systems/replaceables. [Regular daily SOZh maintenance consists of replacement of the KTO & KBO solid waste containers, replacement of an EDV-SV waste water and EDV-U urine container, and processing U.S. condensate water as it becomes available in a filled CWC from the Lab humidifier.]

Kononenko performed the daily IMS (Inventory Management System) maintenance, updating/editing its standard "delta file" including stowage locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur).

The crew conducted their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exercise device (CDR, FE-1, FE-2), and VELO bike with bungee cord load trainer (CDR, FE-1).

Afterwards, Oleg transferred the crew's exercise data file to the MEC for downlink, as well as the daily wristband HRM (Heart Rate Monitor) data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

Garrett conducted the periodic atmospheric sampling in the center of the Lab, SM and JLP with the GSC (Grab Sample Container, #1052, #1095, plus one new from 29P). The three GSCs were then prepacked for return on STS-124/1J.

At ~12:50am, Reisman supported a PAO event downlink for the "G Word" program on the Discovery Home Network which focused on the crew's thoughts on the environment and the planet from orbit.

Significant Events Ahead (all dates Eastern Time, some changes possible.):
05/31/08 -- STS-124/Discovery/1J launch - JEM PM "Kibo", racks, RMS (5:02pm EDT nominal)
06/02/08 -- STS-124/Discovery/1J docking (1:49pm)
Tentative STS-124 docked working timeline:

  • 6/03 -- EVA-1 (11:30am, 6.5 hrs.), OBSS transfer, JPM prep, S3/S4 SARJ TBA install, JPM install
  • 6/04 -- JPM Vestibule outfitting, Reisman/Chamitoff handovers
  • 6/05 -- EVA-2 (11:30am, 6.5 hrs), JTVE install, JRMS cvr remv, NTA prep, CP 9 ETVCG retrv
  • 6/06 -- JLP relocate to JPM; JLP Vestibule leak check
  • 6/07 -- JLP Vestibule outfitting
  • 6/08 -- EVA-3 (10:30am, 6.3 hrs), S1 NTA install, CP9 ETVCG install, JRMS cover remove
  • 6/09 -- JRMS checkouts, JLP Vestibule outfitting, A/L BCM R&R
  • 6/10 -- Sayonara (~4:00pm), hatch close (~4:30pm)
  • 6/11 -- Undocking (~9:04am); OBSS survey/inspection
  • 6/12 -- Mostly off-duty
  • 6/13 -- Stowing; deorbit preps
  • 6/14 -- Deorbit burn (~9:56am);

06/14/08 -- STS-124/Discovery landing (KSC: ~10:59am EDT, nominal)
07/10/08 -- Russian EVA-20 (7/10-11)
09/05/08 -- ATV1 undocking
09/09/08 -- Progress M-64/29P undocking (from DC1)
09/10/08 -- Progress M-65/30P launch
09/12/08 -- Progress M-65/30P docking
10/01/08 -- NASA 50 Years
10/08/08 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/12/08 -- Soyuz TMA-13/17S launch
10/14/08 -- Soyuz TMA-13/17S docking (SM aft port)
10/18/08 -- STS-126/Discovery/ULF2 docking
10/23/08 -- Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 -- Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/10/08 -- STS-126/Discovery/ULF2 launch - MPLM Leonardo, LMC
11/20/08 -- ISS 10 Years
11/26/08 -- Progress M-66/31P launch
11/28/08 -- Progress M-66/31P docking
12/04/08 -- STS-119/Discovery/15A launch - S6 truss segment
12/06/08 -- STS-119/Discovery/15A docking
12/15/08 -- STS-119/Discovery/15A undocking
2QTR CY09 -- STS-127/2J/A launch - JEM EF, ELM-ES, ICC-VLD
3QTR CY09 -- STS-128/17A/Atlantis - MPLM(P), last crew rotation
05/??/09 -- Six-person crew on ISS (following Soyuz 18S-2 docking)
3QTR CY09 -- STS-129/ULF3/Discovery - ELC1, ELC2
4QTR CY09 -- STS-130/20A/Endeavour - Node-3 + Cupola
1QTR CY10 -- STS-131/19A/Atlantis - MPLM(P)
1QTR CY10 -- STS-132/ULF4/Discovery - ICC-VLD, MRM1 (contingency)
2QTR CY10 -- STS-133/ULF5/Endeavour - ELC3, ELC4 (contingency).


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free