SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-124 Report #02 - Sunday, June 1, 2008 - 7 a.m. CDT

 
STATUS REPORT
Date Released: Sunday, June 1, 2008
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

HOUSTON The seven members of shuttle Discovery began their first full day in space this morning, waking up to "Your Wildest Dreams" by the Moody Blues. The song was played for Pilot Ken Ham.

Aboard the shuttle are Commander Mark Kelly, Ham and Mission Specialists Karen Nyberg, Ron Garan, Mike Fossum, Greg Chamitoff and Akihiko Hoshide, a Japan Aerospace Exploration Agency astronaut.

Today's activities will focus on performing an inspection of the shuttle's thermal protection system. This will be a limited inspection using the end effector camera of the shuttle's robotic arm. This inspection usually would be completed using the Orbiter Boom Sensor System (OBSS), the special attachment on the end of the shuttle's robotic arm, but due to the size of the Kibo laboratory, Discovery could not carry its own OBSS. During the last shuttle mission, STS-123, Endeavour left behind its OBSS at the station after it had performed its inspection. Discovery will retrieve that OBSS and use it to perform a more detailed inspection on the seventh flight day of the mission. Discovery will then bring the OBSS back home with it when it returns to Earth.

The shuttle crew also will spend the day checking out the equipment that will be used during the spacewalks that are scheduled for the STS-124 mission. They will install the centerline camera, which is used as the shuttle approaches and docks with the station. The crew also will extend the orbiter's docking system ring and conduct a survey of the shuttle's orbital maneuvering system (OMS) pods.

During Discovery's launch, there was a loss of electronics on a secondary gimbal actuator on the shuttle's left OMS pod. That OMS engine is still usable and has been put into a parked position, and there is no impact to the mission. The shuttle conducted a series of OMS burns after it reached orbit to fine-tune its approach to the station, and the orbiter performed nominally. Flight controllers will continue to examine the issue to determine if it is a mechanical or instrumentation issue.

The next shuttle status report will be issued at the end of the crew day, or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free