SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA ISS On-Orbit Status 5 June 2008

 
STATUS REPORT
Date Released: Thursday, June 5, 2008
Source: NASA HQ


image

All ISS systems continue to function nominally, except those noted previously or below. Flight Day 6 (FD6) of STS-124/1J. ISS crew work cycle remains unchanged: wake 6:32am EDT; sleep 10:02pm.

Crew activities aboard the ISS today centered on three major areas: (1) The second 1J spacewalk, (2) activation of the JPM (Japanese Pressurized Module) Kibo, and (3) preparations for tomorrow's relocation of the JLP (Japanese Logistics Pressurized Module).

Mission 1J's EVA-2 was completed successfully by Mike Fossum & Ron Garan in 7h 11min, accomplishing all its objectives. [During the spacewalk, Fossum (EV1) & Garan (EV2) -

  • Installed Fwd/Aft JTVEs (JEM Television Equipment, i.e., 2 cameras) for monitoring JEM RMS ops (~12:19pm),
  • Removed 7 thermal covers from each of the JEM RMS' six joints & one end effector (~1:02pm),
  • Prepared the JPM zenith ACBM (Active Common Berthing Mechanism) for JLP relocation on FD7 (removed ACBM cover; released MMOD/Micrometeoroid Orbital Debris shield launch restraints),
  • Cleared up late-discovered MLI (Multi-Layer Insulation) cover anomaly on the JPM zenith CBM (could have interfered with the 4 capture latches during JLP relocation/berthing tomorrow) (~1:55pm),
  • Installed JPM trunnion and keel pin thermal covers (~2:15pm),
  • Prepared the old S1 Nitrogen Tank Assembly on S1 truss and new spare on ESP-3 (External Stowage Platform 3) for R&R during EVA 3 (~3:45pm), and
  • Retrieved an ETVCG (External TV Camera Group) camera from CP9 (Camera Port 9) on the left truss.

Official start time of the spacewalk was 11:04am EDT, about 28 minutes ahead of timeline, and it ended at 6:15pm. Total EVA duration (PET = Phase Elapsed Time) was 7h 11min. It was the 110th spacewalk for ISS assembly & maintenance and the 82nd from the station (60 from Quest, 22 from Pirs, plus 28 from Shuttle) totaling 506h 46min, the second for Expedition 17 and the 11th so far this year. After today's EVA, a total of 141 spacewalkers (109 NASA astronauts, 21 Russians, and 11 astronauts representing Japan-1, Canada-4, France-1, Germany-2 and Sweden-3) have logged a total of 695h 08min outside the station on building, outfitting & servicing. It was the 132nd spacewalk involving U.S. astronauts.]

After wakeup at ~6:32am, ending the 8.5-hr sleep period before the spacewalk, the A/L CL (Airlock Crewlock) hatch was cracked (~7:12am) for a hygiene break/with mask prebreathe for Fossum & Garan, after spending the night on 10.2 psi campout. Around 8:22am, the hatch was closed again by IVs (Intravehicular Crewmembers) for EVA preparations in 10.2 psi, followed by EMU (Extravehicular Mobility Unit) purge & prebreathe. Sergey Volkov, Mark Kelly & Greg Chamitoff assisted the spacewalkers during EMU purge, EMU prebreathe and CL depressurization. EV1/EV2 egress followed after the EMUs were switched to batteries at 11:04am.

Before breakfast, Chamitoff collected his second "wet" saliva sample for the biomed experiment INTEGRATED IMMUNE (Validating Procedures for Monitoring Crew member Immune Function). [IMMUNE protocol requires the collection to occur first thing post-sleep, before eating, drinking and brushing teeth, and all samples are stored at ambient temperature. Along with NUTRITION (Nutritional Status Assessment), INTEGRATED IMMUNE samples & analyzes participant's blood, urine, and saliva before, during and after flight for changes related to functions like bone metabolism, oxidative damage and immune function to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations.]

Prior to EVA start, CDR Volkov activated two Kodak DCS760 digital cameras with 28mm lens for the EVA and verified deactivation of all onboard ham radio equipment (Kenwood in SM/Service Module, Ericsson in FGB) to prevent RF interference with the EMUs, as well as proper closure of the protective Lab window shutters.

As the spacewalk went on, monitored by Ken Ham & Mark Kelly, crewmembers Hoshide, Nyberg, Reisman, Volkov, Kononenko & Chamitoff worked in the JPM at various times on carefully choreographed outfitting of Kibo. Major transfers from JLP and commensurate installation activities in JPM included -

  • EPS1 (Electrical Power Systems 1) rack & mating of its umbilicals,
  • DMS1 (Data Management Systems 1) rack & mating of its umbilicals,
  • WS (Workstation) rack and checking out its C&W (Caution & Warning) panel,
  • ICS (Interorbit Communication System) rack,
  • SAIBO ("biologic cell") payload rack after installing two monitor display covers (CB/Clean Bench; CBEF/Cell Biology Experiment Facility),
  • RYUTAI ("fluid") payload rack,
  • JRSR (JEM Resupply Stowage) rack,
  • Mating umbilicals for the JEMRMS (Japanese Experiment Module Robotic Manipulator System) console rack transferred last night from the JLP, checking out its C&W (Caution & Warning) panel, and configuring its console (deploying two cue cards),
  • Removing launch restraints of the pre-installed EPS2 & DMS racks, and
  • Relocating two dummy hard panels from JPM to locations in JLP.

For the JPM outfitting, Hoshide & Nyberg also -

  • Deployed the remaining Photo/TV drag-thru cable from Node-2,
  • Reconfigured both the "B" string & "A" string HCTLs (Heater Controllers) from LTA (Launch-to-Activation) to On-Orbit, reconnecting appropriate power cables,
  • Installed the JPM Channel "A" power jumper (W3009) in the Vestibule (after transfer & connection of EPS1 & DMS1), allowing TKSC (Tsukuba Space Center)/Japan to assume Kibo control,
  • Moved the JPM PCS (Portable Computer System) laptop from its temporary location to the JEMRMS rack and mounted it on the rack's right side,
  • Set up two SSC (Station Support Computer) laptops in the JPM, one hard-wired, the other off a drag-thru cable (to enable Japanese language, IP Phone, etc.), and
  • Configured the DOUG (Dynamic Onboard Ubiquitous Graphics) application on the PCS for the upcoming activation of the RMS in front of Kibo, to receive & display SRMS/SSRMS/JEMRMS joint angle telemetry from the laptop. [DOUG is a software application that provides a graphical birdseye-view image of the external station configuration and the JEMRMS, showing its real-time location and configuration on a laptop during its operation.]

In preparation for tomorrow's relocation of the JLP module from Node-2 zenith to JPM with the SSRMS (Space Station Remote Manipulator System) --

  • Nyberg deactivated the JLP MKAM (Minimum Keep Alive Monitor) fan which had been turned on temporarily by Reisman earlier this morning as usual to allow ingress into JLP,
  • Aki Hoshide unlatched the JPM's overhead hatch,
  • Garrett Reisman installed & checked out the CBCS (Centerline Berthing Camera System) at the JPM hatch, and
  • Karen & Oleg installed the CPA (Controller Panel Assembly) at the Node-2 zenith hatch so that Flight Controllers at MCC-Houston can make preparations for the JLP relocation during crew sleep,
  • Sergey walked off the SSRMS, i.e., ungrappled the JPM PDGF (Power & Data Grapple Fixture), which had provided vital keep-alive power to the JPM, and maneuvered the arm to grapple, at 6:08pm, the MBS (Mobile Base System) PDGF-3 for a ground-commanded base change later tonight (the MT/Mobile Transporter with the MBS was moved yesterday from WS4/Worksite 4 to WS6).

In the US Lab, MS-1 Nyberg installed the AmiA (Antimicrobial Applicator), brought up on STS-124, in the ITCS (Internal Thermal Control System) and removed its insulation blanket to allow temperature equalization. Later tonight, AmiA will be removed again. [AmiA is introducing OPA (Ortho-Phthalaldehyde), an antimicrobial agent, into the Lab ITCS coolant.]

Sergey Volkov terminated battery charging for the "Kelvin-Video" and TTM-2 instruments for another operational run of the Russian KPT-2 science payload BAR-RM, starting tomorrow (6/6) TTM-2 using the RSE-1 laptop, with downlinking via BSR-TM channel. [Objective of the payload is to experiment with ISS leak detection based on environmental data anomalies (temperature, humidity, and ultrasound emissions) at leak locations. The payload uses a remote infrared thermometer (Kelvin-Video), a thermohygrometer (Iva-6A), a heat-loss anemometer/thermometer (TTM-2), an ultrasound analyzer (AU-01), and a leak detector (UT2-03) to determine physical background signs of loss of ISS pressure integrity which could be indicative of leaks in the working compartments of the station. Measurements are taken in specific zones (13 in SM PkhO and 4 in DC1), both with lights & fans turned on and off. ]

The FE-1 conducted the periodic (currently daily) checkout/verification of IP-1 airflow sensors in the various RS (Russian Segment) hatchways, including the passageways PrK (SM Transfer Compartment)-ATV, PrK-RO (SM Working Compartment), PkhO (SM Transfer Tunnel)-RO, PkhO-DC1, PkhO-FGB PGO, FGB PGO-FGB GA, FGB GA-Node-1. [This checkup is especially important when the ventilation/circulation system has to cope with a larger crew on board, currently ten persons, and one of the two Russian SKV air conditioners off (SKV-1).]

In preparation for a major RS outfitting activity scheduled tomorrow, involving the nominal restoration of mounting structures for the heat exchanger-condenser fans VTK1 & VTK2 of the two Russian SKV air conditioners, the CDR unstowed and readied necessary tooling and reviewed procedures.

After the spacewalkers' return on board at 6:15pm, post-EVA activities by Fossum, Garan, Kelly and Chamitoff in the A/L consist of --

  • Recharging the EMU/spacesuits with water from PWR (Payload Water Reservoir),
  • Reconnecting the LTAs (Lower Torso Assemblies) to the EMUs,
  • Capping the UIA (Umbilical Interface Assembly (no METOX regeneration required),
  • Setting up the METOX (Metal Oxide) CO2 absorbers for regeneration in the A/L bake-out oven,
  • Downlinked EVA imagery from the Kodak DCS760 camera & readying the camera for EVA-3, and
  • Initiating recharge of the EMU (Extravehicular Mobility Unit) batteries in the A/L BSA (Battery Stowage Assembly.

Kononenko switched the Russian Vozdukh CO2 removal system to manual Mode 5 via the on-board computer system. [Mode 5 uses two adsorbent cartridges with 10 min cycle time, a vacuum pump cycle time of 1 min, plus 40% airflow during sleep, 60-80% during the day, and 100% during physical exercise, for 3-4 crewmembers.]

In the SM, Volkov completed the routine maintenance of the SOZh/ECLSS system, including ASU toilet facilities systems/replaceables (see below for update). [Regular daily SOZh maintenance consists of replacement of the KTO & KBO solid waste containers, replacement of an EDV-SV waste water and EDV-U urine container, and processing U.S. condensate water as it becomes available in a filled CWC from the Lab humidifier.]

The CDR also performed the daily IMS (Inventory Management System) maintenance, updating/editing its standard "delta file" including stowage locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur).

FE-2-17 Chamitoff spent more time (~15 min.) on familiarizing himself with the onboard CMS (Crew Medical Systems) exercise equipment.

In addition, Greg had another hour for himself for general orientation (station familiarization & acclimatization) as is standard daily rule for fresh crewmembers for the first two weeks after starting station residency.

The crewmembers completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (FE-2), TVIS treadmill (CDR, FE-1, FE-2), RED resistive exercise device (CDR, FE-1) and VELO cycle with bungee cord load trainer (CDR, FE-1).

Afterwards, Sergey copied the exercise data file to the MEC (Medical Equipment Computer) laptop for downlink, including the daily wristband HRM (Heart Rate Monitor) data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

At ~8:15pm EDT, Chamitoff is scheduled for another regular PMC (Private Medical Conference) via S- & Ku-band audio/video.

CDRA Update: After yesterday's R&R of its #2 desiccant/sorbent (#202), the Carbon Dioxide Removal Assembly was declared operational. The fan speed was commanded to 130,000 RPM (revolutions per minute) and will remain at that speed for the remainder of the docked mission.

ASU Update: After the replacement of the failed MNR-NS gas/liquid separator pump of the Russian ASU toilet system by FE-1 Kononenko yesterday, the crew performed several flushes with water to verify a successful R&R, after which ground specialists declared the ASU "Go" for use. Prior to replacement of the pump, the crew had been using the backup Wring Receptacle Assembly instead of the ASU. The crew requested instructions on how to package the failed pump on Flight 1J.

No CEO (Crew Earth Observation) photo targets uplinked for today.

CEO photography can be studied at this "Gateway" website:
http://eol.jsc.nasa.gov (as of 3/1/08, this database contained 757,605 views of the Earth from space, with 314,000 from the ISS alone).

ISS Orbit (as of this morning, 5:13am EDT [= epoch]):
Mean altitude -- 339.7 km
Apogee height -- 343.5 km
Perigee height -- 335.9 km
Period -- 91.33 min.
Inclination (to Equator) -- 51.64 deg
Eccentricity -- 0.0005651
Solar Beta Angle -- 17.2 deg (magnitude decreasing)
Orbits per 24-hr. day -- 15.77
Mean altitude gain in the last 24 hours -- 80 m
Revolutions since FGB/Zarya launch (Nov. 98) -- 54666

Significant Events Ahead (all dates Eastern Time, some changes possible.):
STS-124 docked timeline

  • 6/06 - FD7 - JLP relocate to JPM; JLP Vestibule leak check; Focused inspection
  • 6/07 - FD8 - JLP Vestibule outfitting; CP9 ETVCG TVCIC R&R
  • 6/08 - FD9 - EVA-3 (10:32am, 7 hrs), S1 NTA R&R, compl JPM outfit (RMS cvr remv), P1 CP9 ETVCG install
  • 6/09 - FD10 - JRMS checkouts, JLP Vestibule outfitting, A/L BCM R&R
  • 6/10 - FD11 - "Sayonara" (~4:00pm), hatch close (~4:30pm)
  • 6/11 - FD12 - Undocking (~7:33am); Greg remains, Garrett leaves; OBSS survey/inspection
  • 6/12 - FD13 - Mostly off-duty
  • 6/13 - FD14 - Stowing; deorbit preps
  • 6/14 - FD15 - Deorbit burn

06/14/08 -- STS-124/Discovery landing (KSC: ~11:02am EDT, nominal)
07/10/08 -- Russian EVA-20 (7/10-11)
09/05/08 -- ATV1 undocking
09/09/08 -- Progress M-64/29P undocking (from DC1)
09/10/08 -- Progress M-65/30P launch
09/12/08 -- Progress M-65/30P docking (at DC1 nadir)
10/01/08 -- NASA 50 Years
10/08/08 -- STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
10/11/08 -- Progress M-65/30P undocking (from SM aft port)
10/12/08 -- Soyuz TMA-13/17S launch
10/14/08 -- Soyuz TMA-13/17S docking (SM aft port)
10/23/08 -- Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 -- Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/10/08 -- STS-126/Endeavour/ULF2 launch - MPLM Leonardo, LMC
11/12/08 -- STS-126/Endeavour/ULF2 docking
11/20/08 -- ISS 10 Years
11/26/08 -- Progress M-66/31P launch
11/28/08 -- Progress M-66/31P docking
12/04/08 -- STS-119/Discovery/15A launch - S6 truss segment
12/06/08 -- STS-119/Discovery/15A docking
12/15/08 -- STS-119/Discovery/15A undocking
2QTR CY09 -- STS-127/2J/A launch - JEM EF, ELM-ES, ICC-VLD
3QTR CY09 -- STS-128/17A/Atlantis - MPLM(P), last crew rotation
05/??/09 -- Six-person crew on ISS (following Soyuz 18S-2 docking)
3QTR CY09 -- STS-129/ULF3/Discovery - ELC1, ELC2
4QTR CY09 -- STS-130/20A/Endeavour - Node-3 + Cupola
1QTR CY10 -- STS-131/19A/Atlantis - MPLM(P)
1QTR CY10 -- STS-132/ULF4/Discovery - ICC-VLD, MRM1 (contingency)
2QTR CY10 -- STS-133/ULF5/Endeavour - ELC3, ELC4 (contingency).


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free