SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

NASA STS-124 Report #11 8 p.m. CDT Thursday, June 5, 2008

 
STATUS REPORT
Date Released: Thursday, June 5, 2008
Source: Johnson Space Center


image

Mission Control Center, Houston, Texas

HOUSTON – After a seven-hour spacewalk, the newly installed Kibo laboratory is closer to its final configuration.

Mission specialists Mike Fossum and Ron Garan exited the space station at 10:04 a.m., nearly 30 minutes ahead of schedule, to begin the second spacewalk, which focused on external outfitting of the new module. They also worked on preparations for the exchange of a Nitrogen Tank Assembly, retrieved a failed camera and inspected an array mechanism.

Once the two left the airlock, they made their way to the Kibo laboratory module where they installed cameras that will help monitor external robotic and payload operations. While in the vicinity, the two added insulating material to some areas of the module and removed thermal covers and insulation from others, specifically the Japanese robotic arm and the hatch on top of the module. A smaller component of the Japanese Experiment Module will be repositioned to that hatch location Friday.

With the Kibo tasks behind them, the two proceeded to tasks in preparation for their next spacewalk. They loosened bolts holding two Nitrogen Tank Assemblies in place on the station's truss. Those tanks will be swapped during Sunday's spacewalk. They also retrieved a failed external television camera from the port truss. That camera's power supply will be replaced once inside the space station and the camera will be returned to its external location during Sunday's third spacewalk.

Fossum then performed an inspection of the left Solar Alpha Rotary Joint, which has been performing perfectly. He relayed to the ground team that he did not see any shavings or debris, but took photos which will be sent to the ground for engineers to review. The spacewalk ended at 5:15 p.m. after seven hours, 11 minutes.

The rest of the station and shuttle crew members continued with work inside the docked complex transferring supplies and equipment, outfitting the interior of Kibo and its robotics console, transferring racks into the new lab and readying for tomorrow's relocation of the logistics module onto the lab.

The crew is scheduled to go to sleep at 9:32 p.m. and awaken at 5:32 a.m. Friday.

The next status report will be issued after the crew awakens, or earlier if events warrant.


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

NASA MODIS Image of the Day: November 21, 2009 - Dust over Afghanistan

NASA Hubble Space Telescope Daily Report #4976

NASA Hubble Space Telescope Daily Report #4975

NASA Hubble Space Telescope Daily Report #4974

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free