SpaceRef - Space News as it Happens · About Us · Advertising · Contact Us · Comments Sunday, November 22, 2009    
 

Advertisement
SpaceRef - Your Space Reference
Home | More News - Upcoming Events - Space Station - Get our Daily Newsletter | RSS/XML News Feeds Available

Buy a - SpaceRef Mug - Arthur Clarke Mars Greenhouse Mug - SpaceRef T-Shirt - NASA STS-128 Store

Lunar Orbiter Image Recovery Project Update 19 February 2009

 
STATUS REPORT
Date Released: Thursday, February 19, 2009
Source: Lunar Orbiter Image Recovery Project


image

To: LOIRP Status
From: Dennis Wingo
Subject: Progress Report, Milestone ALERT! Folks Major milestones to report!

Demodulator

We have had a major milestone accomplished (well 98% of the way there). Figure 1 shows two framelets, from Lunar Orbiter II High Resolution image (we don't know which one yet). Figure 2 shows our favorite image, the Lunar Orbiter 1 image of the Earth with two framelets that were captured from the undemodulated tape. The framelets that are stitched together are from LO-1-102.

This proves that we can demodulate random tapes from more than one Lunar Orbiter mission but it has also shown us what we have to do to get to full production mode. The demodulator must be ultra stable, however, the drive is still not to its original specification and so there is jitter in the signal. The new capstan motor should fix this as we have new belts, bearings, and the motor has been balanced back to its original specification. However, the the motor driver assembly that we built to use during the calibration process blew some power transistors and he had to come back down (he is in San Francisco) and pick up one of our spares. We have been building spares for the production process to keep the machines running and this is helping with the refurb process as well! We will have the capstan motor on Saturday and will install and align it on Monday.

Al Sturm is going back and doing some further refining of the demodulator design to account for some loss of demodulator lock on the signal found during the testing yesterday. This accounts for the striping that you see on the Lunar Orbiter II framelets that we captured and processed shown on the next pages. We have not found out what frame this is and it is possible (as I have looked through all of the LO-II images) that we have one that is not in the current database as one image is missing from the LPL database that may be ours. If this is true, then we are helping to fill out the complete LO image database for NASA. One final note, look at the final image and see the boulders sitting on the surface at the edge of the crater!

Full report and images


Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Reddit
  • Slashdot
  • StumbleUpon
  • Technorati
  • TwitThis
  • Fark
  • Google
  • Live
  • YahooMyWeb

Mercury - Venus - The Moon - Mars - Jupiter - Saturn - Pluto

RADWIN empowers service providers so they can deliver high speed Wireless broadband Access services.

Find hose reels and watering systems

Quality leather chairs in a variety of styles.


 


News from Commercial Space Watch

- NASA Awards $350,000 to Winning Astronaut Glove Designers

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Decorate your home with nautical decor

- Dieses Portal stellt Ihnen die besten online Casino Bonus und Pokerräume im Internet vor.

- Play free bingo games and black out bingo.

- 220Marketing specializes in providing mortgage marketing for mortgage companies and managers.

- Take your time to tour our site and check out all the fun games we operate. In addition to the 20 online bingo rooms we operate, we also have online keno.

- TV Stands

advertisment

Learning About Telescopes

Learn about Telescopes

Recent Status Reports

NASA MODIS Image of the Day: November 22, 2009 - Spring Bloom in the South Atlantic Ocean

Bresnik Announces New Daughter; Crew Relaxing, Preparing for Third Spacewalk

NASA STS-129 Report #11 Saturday, Nov. 21, 2009 - 4:30 p.m. CST

Joint USAF/NOAA Report of Solar and Geophysical Activity 21 Nov 2009

NASA LaRC Internal Email: The 'Langley Story'

Porters Tahoe is the premier online dealer for Skis and Burton Snowboards, visit PortersTahoe.com!

Tax Free Cigarettes

Looking for TV Trays. Find a wide selection

Bingo world tour - The most comprehensive guide to Play Online Bingo Games

Find a number of writing desks for sale

the best online casinos guide on the internet offering higher payouts than any land based casino.

Paradise Style Group - wedding and special occasion dresses.

Design and Sell Merchandise Online for Free